Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-00706
StatusFinaled
Name HALE DEVELOPMENT, INC
Site Address 2313 N 22ND ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a two bedroom, one and three quarter bathroom 1372 sq. ft. two story single family dwelling (690 sq. ft. first floor/682 sq. ft. second floor) with a 75 sq. ft. covered front porch. A 418 sq. ft. detached garage is to also be constructed in the rear of the property. Per approved plans, engineering and requirement list. FIRE protection required on garage eves. PC#178 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/18/20027/18/20027/18/2002APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/18/2002 at 06:29:12. Contact: ###-####. c.c # 16492 issued 7/18/2002 9:51:14 AM
DOC - Permit Finaled7/18/20027/18/20027/18/2002APASS
DetailsDave Hannah
Finaled by inspector at 7/18/2002 9:51:19 AM
BLD-Final7/9/20027/9/20027/9/2002PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/09/2002 at 07:32:58. Contact: ###-####.42$ reinspection fee c/n items not done 7/9/2002 3:43:00 PM
BLD-Final7/3/20027/5/20027/5/2002AFAIL
DetailsJim Sly
No access.....no contact # left note. 7/5/2002 9:35:23 PM
BLD-Final7/3/20027/3/20027/3/2002PFAIL
DetailsTony Young
###-####
c/n posted 7/5/2002 9:12:34 AM
BLD-Final7/1/20027/2/20027/2/2002PNR
DetailsTony Young
###-####
BLD-Final7/1/20027/1/20027/1/2002PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/01/2002 at 08:51:05. Contact: ###-####.contractor called and canceled. Tony not in.
BLD-Framing/Rough-in5/24/20025/24/20025/24/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/24/2002 at 09:31:18. Contact: ###-####.
house ok 5/24/2002 2:48:58 PM
BLD-Energy code compliance5/24/20025/24/20025/24/2002PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 05/24/2002 at 09:32:04. Contact: ###-####.
BLD-Framing/Rough-in5/22/20025/23/20025/23/2002AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 05/22/2002 at 07:56:16. Contact: ###-####.c/n posted, and complete trades 5/23/2002 10:59:31 AM
BLD-Framing/Rough-in5/14/20025/15/20025/15/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/14/2002 at 15:43:16. Contact: ###-####.
ext. shear ok 5/15/2002 11:43:29 AM
BLD-Framing/Rough-in5/14/20025/14/20025/14/2002PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 05/14/2002 at 07:55:49. Contact: ###-####.
not per plan 5/14/2002 2:45:45 PM
BLD-Footing4/29/20024/30/20024/30/2002APART
DetailsTony Young
###-#### bart
already poured, set backs appear ok 4/30/2002 10:42:33 AM
BLD-Wall cover4/29/20024/30/20024/30/2002ANR
DetailsTony Young
###-#### bart
BLD-Foundation4/30/20024/30/20024/30/2002PPART
DetailsTony Young
Scheduled by Inspector: 415 On 4/30/2002 10:40:34 AM
Issue PAID IN FULL permit  4/25/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/11/2002 DONE
Telephone call  4/11/2002 DONE
permit ready
Inspection Record Card- Bld  4/11/2002 DONE
Routing - PLAN CHECK4/3/2002 4/11/2002 DONE
Plan assigned to (SAM)4/10/2002 4/11/2002 PASS
DetailsSteve Munroe
4/11/2002 10:18:18 SAM - activity updated through activity BLDA022 from case BLD02-00706.
Case Summary (BLD)  4/10/2002  
Plan Review Report  4/10/2002  
Plan Reviewer's activity  4/10/2002 PEND
4/10/02 15:45 I talked to Dave Hale and he will bring in how he is constructing the eve on the garage.
Pending Assignment by DJO3/28/2002 4/10/2002 DONE
DetailsDan Overy
4/10/2002 11:50:14 SAM - activity updated through activity BLDA183 from case BLD02-00706.
Routing - PLANNING3/28/2002 4/3/2002 PASS
Routing - PUBLIC WORKS4/3/2002 4/3/2002  
Application received  3/28/2002