Case Summary (BLD) | | | 11/30/2011 | | |
|
|
|
|
Case Summary (BLD) | | | 11/8/2010 | | DONE |
|
|
|
|
Agreement of Future work | 10/30/2002 | 11/1/2003 | 3/22/2010 | | DONE |
Scott Arellano
|
|
|
FD (DSM) to re-evaluate whether or not the drive way shall be paved.
|
Fee Review-notes | 7/22/2003 | 7/22/2003 | 7/22/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 11/27/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9457 issued 11-27-02 to Teen Challenge of Idaho.
|
Permanent Occupancy | | 11/22/2002 | 11/22/2002 | | DONE |
|
|
|
|
Permanent Occupancy | | 11/22/2002 | 11/22/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/21/2002 | 11/22/2002 | 11/22/2002 | A | PASS |
Troy Cobbley
|
|
|
access pad has been poured. life safety finaled 11/22/2002 8:53:54 AM
|
BLD-Final | 11/22/2002 | 11/22/2002 | 11/22/2002 | P | PASS |
Jim Sly
|
|
|
alice ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Perm Occ. 11/22/2002 4:18:59 PM
|
PubWorks Occupancy Approval | 11/22/2002 | 11/22/2002 | 11/22/2002 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 11/22/02. G.Fitts
|
BLD-Final | 11/18/2002 | 11/18/2002 | 11/18/2002 | P | NR |
Jim Sly
|
|
|
or ###-####; Phone #: ###-#### Internet Inspection Request from: Amy Lawson Need Req signatures. 11/18/2002 3:40:19 PM
|
BLD-Conference | 11/5/2002 | 11/6/2002 | 11/6/2002 | A | PART |
Jim Sly
|
|
|
alice-or cell ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Walk thru...... 11/6/2002 9:02:26 AM
|
FIRE-Final Inspection | 11/5/2002 | 11/5/2002 | 11/5/2002 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Millers permission. The owner is to have the fire access pad installed by December 1, 2002. The existing gravel road will be reviewed by November 1, 2003 for paving. Please see letter to Dave dated Oct. 29, 2002. All other life/safety items are ok. 11/5/2002 3:11:10 PM
|
FIRE-Conference | 10/31/2002 | 10/31/2002 | 10/31/2002 | P | FAIL |
Troy Cobbley
|
|
|
door hardware is still incorrect and the building address has not been installed 10/31/2002 3:10:06 PM
|
FIRE-Final Inspection | 10/28/2002 | 10/28/2002 | 10/28/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide paved access road per review comments on the conditional use permit, provide paved section to provide 150' acess to building (parking lot) per note #2, remove plant from around the fire hydrant, provide parking signs per review notes #4 and #5, provide building address viewable from the named street see note #7, provide fire extinguisher per review note #9 and provide approved door hardware. the hardware on the office doors is not approved type
|
CHANGE STATUS TO (ISS) | | | 10/28/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/30/2002 | 8/30/2002 | 8/30/2002 | A | PASS |
Dave Hannah
|
|
|
ok to start covering all c/n items completerd 8/30/2002 11:55:18 AM
|
BLD-Framing/Rough-in | 8/26/2002 | 8/26/2002 | 8/26/2002 | A | PART |
Dave Hannah
|
|
|
OK TO COVER EXT SHEAR AND 1 HR PROTECTION OK I also walked framing with alice 8/26/2002 1:18:44 PM
|
BLD-Conference | 8/21/2002 | 8/22/2002 | 8/22/2002 | A | DONE |
Dave Hannah
|
|
|
1 hr fire walls 8/22/2002 9:53:54 AM
|
BLD-Framing/Rough-in | 8/20/2002 | 8/20/2002 | 8/20/2002 | P | PART |
Dave Hannah
|
|
|
shear ok to start covering ext walls 8/20/2002 4:36:49 PM
|
BLD-Framing/Rough-in | 8/13/2002 | 8/14/2002 | 8/14/2002 | A | FAIL |
Dave Hannah
|
|
|
###-#### shear fail partly covered no blocking also one hour fire walls siding will be removed on fire walls so shear can be done and sheet rock installed also no draft stops no truss engineering no framing inspection done at this time told contractor not to cover any thing and when to schd inspections 8/14/2002 9:32:22 AM
|
BLD-Foundation | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 10:34:43. Contact: ###-####.
|
BLD-Footing | 6/11/2002 | 6/12/2002 | 6/12/2002 | A | PASS |
Jim Sly
|
|
|
###-#### tim Letter from Eng. 2500psi No special insp. 6/12/2002 9:31:48 AM
|
BLD-Conference | 6/10/2002 | 6/11/2002 | 6/11/2002 | A | PART |
Jim Sly
|
|
|
TIM ###-#### Special insp Req (concrete) or letter from Eng spec design strength 2500psi 6/11/2002 11:02:43 AM
|
Issue PAID IN FULL permit | | | 6/7/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/6/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/6/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/6/2002 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 6/4/2002 | | 6/5/2002 | | PASS |
|
|
|
PW is ready to re-review.
|
Plan resubmittals received | | | 6/5/2002 | | DONE |
|
|
|
Received five copies of revised sheets SD1.0 C1.0 and one copy of revised O & M manual. Routed to Mike O. kmm
|
Plan resubmittals received | | | 6/5/2002 | | DONE |
|
|
|
Routed three copies of resubmitted civil sheets of 6/5/02 to Brian M. KMM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2002 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 3/29/2002 | | 6/5/2002 | | PASS |
Mike Otto
|
|
|
6/5/2002 14:44:01 MLO - activity updated through activity BLDA022 from case BLD02-00713.
|
Routing - FIRE | 5/21/2002 | 5/22/2002 | 5/22/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - PUBLIC WORKS | 5/17/2002 | 5/17/2002 | 5/21/2002 | | FAIL |
|
|
|
Requires drainage plan revision, O&M plan, and geotech report.
|
Routing - PLAN CHECK | 5/21/2002 | | 5/21/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/21/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets C1.0 and SD1.0 with letter from United Water and fire hydrant location. Routed to Mike Otto.
|
Plan resubmittals received | | | 5/20/2002 | | DONE |
|
|
|
Received two copies of revised sheets A2.0, A3.0, A4.0, A5.0, A6.0, M1.0, M2.0, M3.0. One copy of certificate of occupancy, memo response of comments and existing bldg. plans. Routed to Mike O. kmm
|
Telephone call | | | 5/14/2002 | | DONE |
|
|
|
5/13/2002 - Recieved fax on partial site access and fire apparatus access. 5/14/2002 - Marked submittal showing deficiency, faxed and mailed copy back.
|
Routing - PUBLIC WORKS | 5/8/2002 | | 5/13/2002 | | FAIL |
|
|
|
Send back to Brian Murphy in Public Works.
|
Routing - PLANNING Land Div | 5/7/2002 | 5/7/2002 | 5/7/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 5/1/2002 | 4/9/2002 | 5/7/2002 | | PASS |
|
|
|
Send back to Planning-Land Div.
|
Routing - FIRE | 4/26/2002 | 5/1/2002 | 5/1/2002 | | FAIL |
Bill Alexander
|
|
|
1. Hydrant location of water flow not provided.
2. F.D. access not provided/shown.
|
Plan Review Completed(1st rev) | | | 5/1/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/18/2002 | | 4/26/2002 | | FAIL |
|
|
|
Had meeting with architect on 4/25 went over corrections plus list mailed to architect. MLO
|
Routing - PLUMBING | 4/10/2002 | | 4/18/2002 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PLANNING | 4/10/2001 | | 4/10/2002 | | PASS |
|
|
|
Approve per conditions of approval of CUP01-00027.
|
Routing - PUBLIC WORKS | 4/3/2002 | | 4/10/2002 | | FAIL |
|
|
|
Requires drainage plan revision O&M manual and geotech report. All per Brian M. kmm
|
Routing - PLANNING Land Div | 3/29/2002 | | 4/3/2002 | | FAIL |
|
|
|
Need to receive 1) a copy of the recorded Record of Survey, 2) recorded copies of the new deeds showing the adjusted parcels and 3) the new parcel # for the adjusted parcel. Routed to Public Works. (blc)
|
First Notice | 3/29/2002 | 3/29/2002 | 3/29/2002 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/29/2002 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/29/2002 | | |
|
|
|
|
Application received | | | 3/29/2002 | | |
|
|
|
|