BLD-Final | 8/21/2002 | 8/22/2002 | 8/22/2002 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### C/C issued. 8/22/2002 11:36:50 AM
|
DOC - Permit Finaled | 8/22/2002 | 8/22/2002 | 8/22/2002 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 8/22/2002 11:36:58 AM
|
BLD-Final | 8/20/2002 | 8/20/2002 | 8/20/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 11:02:50. Contact: ###-####. C/N 8/20/2002 1:40:49 PM
|
BLD-Energy code compliance | 6/14/2002 | 6/17/2002 | 6/17/2002 | A | PASS |
Jim Sly
|
|
|
justin ###-#### energy code FRAME OK. 6/17/2002 2:22:19 PM
|
BLD-Framing/Rough-in | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | FAIL |
Jim Sly
|
|
|
JUSTIN ###-#### C/N also check lateral bracing trusses above Master Bed. 6/14/2002 10:42:35 AM
|
BLD-Framing/Rough-in | 6/10/2002 | 6/11/2002 | 6/11/2002 | P | FAIL |
Jim Sly
|
|
|
JUSTAN ###-#### C/N 6/11/2002 3:58:13 PM
|
BLD-Framing/Rough-in | 5/28/2002 | 5/29/2002 | 5/29/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### justin C/N posted. 5/29/2002 12:08:05 PM
|
BLD-Framing/Rough-in | 5/29/2002 | 5/29/2002 | 5/29/2002 | P | PART |
Jim Sly
|
|
|
shear wall --justin ###-#### Shear Pass....Still need int. panels. C/N ..Non complying winders. 5/29/2002 2:19:42 PM
|
BLD-Foundation | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PART |
Jim Sly
|
|
|
steve ###-####--found wall
|
BLD-Footing | 4/30/2002 | 4/30/2002 | 4/30/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 06:37:09. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 4/19/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 4/5/2002 | | 4/18/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 4/17/2002 | | 4/18/2002 | | PASS |
Steve Munroe
|
|
|
4/18/2002 08:10:54 SAM - activity updated through activity BLDA022 from case BLD02-00733.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2002 | | |
|
|
|
|
Telephone call | | | 4/18/2002 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Plan Reviewer's activity | | | 4/17/2002 | | PEND |
|
|
|
4/17/02 15:10 I called and talked to Justin. He is going to have the truss company fax me a attic truss profile and engineering for the attic girder trusses. I also asked him about the framing / beams over the entry carrying the plant shelf. He will call me back on that.
|
Plan Review Report | | | 4/17/2002 | | |
|
|
|
|
Pending Assignment by DJO | 4/2/2002 | | 4/17/2002 | | DONE |
Dan Overy
|
|
|
4/17/2002 08:14:35 SAM - activity updated through activity BLDA183 from case BLD02-00733.
|
Routing - PUBLIC WORKS | 4/3/2002 | | 4/5/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 4/2/2002 | | 4/3/2002 | | PASS |
|
|
|
|
Application received | | | 4/2/2002 | | |
|
|
|
|