Fee Review-notes | 7/23/2003 | 7/23/2003 | 7/23/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
Permanent occupancy | | | 11/4/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9428 issued 11-4-02 to St. Al's MOB #6, Sleep Lab.
|
BLD-Final | 9/25/2002 | 9/26/2002 | 9/26/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/25/2002 at 11:38:52. Contact: ###-####.
|
Permanent Occupancy | | 9/26/2002 | 9/26/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 9/25/2002 10:25:41 AM
|
FIRE-Final Inspection | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | FAIL |
Troy Cobbley
|
|
|
the clip in supports for the sprinkler heads still are not clipped onto the t-bar correctly 9/24/2002 9:34:03 AM
|
BLD-Framing/Rough-in | 7/15/2002 | 7/16/2002 | 7/16/2002 | P | PART |
Tom Arcoraci
|
|
|
DOUG ###-#### 7/16/2002 12:25:07 PM
|
BLD-Framing/Rough-in | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PART |
Russ Owen
|
|
|
doug- ###-#### r/i Ok to rock 1 side only. 7/9/2002 1:14:45 PM
|
Issue PAID IN FULL permit | | | 6/18/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/17/2002 | 6/17/2002 | 6/17/2002 | | PASS |
|
|
|
Attached mechanical engineers & architect response & new plan sheets to original submittals and routed to permit desk to issue. Approved as noted and per attached plan review comments of reviewing agencies as part of the approved plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2002 | | PASS |
|
|
|
To permit desk to issue.
|
Print Occupancy Form | | | 6/17/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/17/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/17/2002 | | DONE |
|
|
|
permit ready and fees due
|
Plan assigned to (DRS) | 4/9/2002 | | 6/17/2002 | | PASS |
Dan Stuart
|
|
|
6/17/2002 14:01:07 DRS - activity updated through activity BLDA022 from case BLD02-00745.
|
Plan resubmittals received | | | 6/17/2002 | | DONE |
|
|
|
Received 8-1/2" x 11" detail sheet from Bob Ticker, mechanical engineer indicating compliance with section 410 UBC for medical gas room with 1-hour wall & 1-hour door plus ventilation per code. attached to plans with note to inspector to verify.
|
Telephone call | | | 6/14/2002 | | DONE |
|
|
|
Called Sam burrows, architect, to find out if he had copy of the original shell & core sheet that shows the medical gas room. Sam will look at his plans and provide copies or have mechanical engineer do so.
|
Plan resubmittals received | | | 6/11/2002 | | DONE |
|
|
|
Received two copies of revised sheets A-2 & A-4, two Mech. review comment responses for items 4,5,6, & 7 and two copies of electrical review comment responses for items 9, 9 & 10. Routed to Dan S. kmm
|
Telephone call | | | 5/31/2002 | | DONE |
|
|
|
Call to LCA to talk with Sam Burrows concerning plan deficiencies. Sam out of office until Monday, June 3.
|
Routing - PLAN CHECK | 5/23/2002 | | 5/31/2002 | | FAIL |
|
|
|
Resubmittals presented on 5/30/02 addressed only plan review comment #! in a satisfactory manner. Conditions #2 & #3 were only partially addressed. Walls were relocated to meet clear floor space requirements of accessibility but the original wall & fixture locations were left on the plan with the new walls, etc. drawn over the existing. Original dimensions that were wron originally were left on the plans without corrections so the layout & dimensions do not match. The overall plans are incompletely dimensioned within the rooms to provide proper layout to meet the architects and owners intent and to assist in code verification compliance. Conditions #4 thru #10 were not addressed in the resubmittal. Fax to architect stating the deficiencies still outstanding.
|
Plan resubmittals received | | | 5/30/2002 | | DONE |
|
|
|
Received two copies of revised sheets A-2, A-4. Routed to Dan S. kmm
|
Routing - PLAN CHECK | 4/18/2002 | | 5/23/2002 | | FAIL |
|
|
|
Resubmittals required. Copy faxed & mailed to architect.Plans to fire code analyst for review.
|
Routing - FIRE | 5/23/2002 | | 5/23/2002 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 5/23/2002 | | FAIL |
|
|
|
|
Plan Review Completed(1st rev) | | | 5/23/2002 | | FAIL |
|
|
|
|
Routing - PLUMBING | 4/10/2002 | | 4/18/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/9/2002 | | 4/10/2002 | | PASS |
|
|
|
|
First Notice | 4/2/2002 | 4/2/2002 | 4/2/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/2/2002 | | DONE |
|
|
|
|
Application received | | | 4/2/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/2/2002 | | |
|
|
|
|