BLD-Final | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PASS |
Dave Hannah
|
|
|
c.c # 17617 issued 7/31/2002 2:18:26 PM
|
DOC - Permit Finaled | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 7/31/2002 2:18:29 PM
|
BLD-Final | 7/29/2002 | 7/30/2002 | 7/30/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### cn posted on handrails and guardrails 7/30/2002 2:56:14 PM
|
BLD-Final | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | CANC |
Dave Hannah
|
|
|
RANDY TROY ###-#### CODE # 7550; Phone #: ###-####
|
BLD-Energy code compliance | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PASS |
Steven Webb
|
|
|
TROY ###-#### OR ###-####
|
BLD-Framing/Rough-in | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PASS |
Steven Webb
|
|
|
TROY ###-#### OR ###-####
|
BLD-Framing/Rough-in | 6/6/2002 | 6/7/2002 | 6/7/2002 | P | FAIL |
Dave Hannah
|
|
|
randy ###-#### or troy- ###-#### c/n on site ok to insulate 6/7/2002 1:41:03 PM
|
BLD-Framing/Rough-in | 5/21/2002 | 5/23/2002 | 5/23/2002 | P | PART |
Steven Webb
|
|
|
shear wall \\###-#### C/N posted --Ext. shear ok--cripple walls need to be 2" X 6" to comply with 97 UBC 2320.11.5 (at least the same size as the stud above) and cripple walls exceeds 14" in height--wall bracing required--Check at framing. 5/23/2002 2:47:51 PM
|
BLD-Foundation | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PART |
Dave Hannah
|
|
|
###-#### MANA work in progress rebar and wall lines marked checked setbacks all look ok 5/2/2002 9:47:33 AM
|
BLD-Footing | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PART |
Steven Webb
|
|
|
ft mana- ###-#### wip-75% ready at time of inspection. 5/1/2002 3:16:13 PM
|
Issue PAID IN FULL permit | | | 4/29/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/8/2002 | | 4/19/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 4/18/2002 | | 4/19/2002 | | PASS |
Steve Munroe
|
|
|
4/19/2002 08:22:55 SAM - activity updated through activity BLDA022 from case BLD02-00750.
|
Print Pending Permit.LaserJet4 | | | 4/19/2002 | | |
|
|
|
|
Plan Review Report | | | 4/19/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/19/2002 | | DONE |
|
|
|
|
Telephone call | | | 4/19/2002 | | DONE |
|
|
|
|
Pending Assignment by DJO | 4/3/2002 | | 4/18/2002 | | DONE |
Dan Overy
|
|
|
4/18/2002 15:27:31 SAM - activity updated through activity BLDA183 from case BLD02-00750.
|
Routing - PUBLIC WORKS | 4/8/2002 | | 4/8/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 4/3/2002 | | 4/5/2002 | | PASS |
|
|
|
|
Application received | | | 4/3/2002 | | |
|
|
|
|