Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-00751
StatusFinaled
Name VOYLES ALLAN E
Site Address 420 S ORCHARD ST
Project NameLIFE'S DOORS HOSPICE
Customer Number 
ePlanReviewNo
Description
LIFE'S DOORS HOSPIC - TO CONSTRUCT A NEW 10,500 SQUARE FOOT, ONE STORY, METAL FRAMED OFFICE BUILDING AND RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH#02-00009/PC#213-02/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/23/20037/23/20037/23/2003 DONE
Additional values from subcontractors.
Permanent occupancy  1/21/2003 DONE
Perm. Occ. Cert. #9533 issued 1-21-03 to Life's Door Hospice.
BLD-Final1/14/20031/15/20031/15/2003APASS
DetailsTom Arcoraci
###-#### ok for perm occ per approved plans 1/15/2003 9:51:54 AM
Permanent Occupancy 1/15/20031/15/2003 DONE
Details
PubWorks Occupancy Approval12/12/200212/12/200212/12/2002 DONE
Drainage project complete, signed permanent occupancy 12/12/02. G.Fitts
BLD-Final12/11/200212/12/200212/12/2002ACANC
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
FIRE-Conference12/11/200212/12/200212/12/2002APASS
DetailsTroy Cobbley
fire life safety finaled 12/12/2002 8:39:07 AM
BLD-Final12/12/200212/12/200212/12/2002PPART
DetailsTom Arcoraci
ok for temp occ flush bolts not allowed at rear double doors 2 sets 12/12/2002 3:13:32 PM
Temporary occupancy  12/12/2002 DONE
Temp. Occ. Cert. #4903 issued 12-12-02 to Life's Doors Hospice.
FIRE-Final Inspection12/11/200212/11/200212/11/2002PFAIL
DetailsTroy Cobbley
repair the exit signs and test the duct smoke detectors 12/11/2002 3:02:52 PM
FIRE-Final Inspection12/11/200212/11/200212/11/2002PFAIL
DetailsTroy Cobbley
repair the exit signs and test the duct smoke detectors 12/11/2002 3:02:52 PM
Code Occupancy Approval  12/11/2002 PASS
ALL LANDSCAPE AND PARKING IN AS REQUIRED FINAL SIGNED OFF.
BLD-Other12/2/200212/2/200212/2/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/02/2002 at 08:32:54. Contact: ###-####. grid ok 12/2/2002 3:37:07 PM
FIRE-Conference11/6/200211/7/200211/7/2002ADONE
DetailsTroy Cobbley
spoke with the contractor about curb painting, fire extinguisher placement and door hardware. 11/7/2002 9:42:00 AM
BLD-Conference11/5/200211/6/200211/6/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/05/2002 at 13:40:37. Contact: ###-####. panic latch on gate 11/6/2002 9:34:15 AM
BLD-Other11/5/200211/6/200211/6/2002AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/05/2002 at 13:42:08. Contact: ###-####. cn posted 11/6/2002 9:34:37 AM
BLD-Framing/Rough-in10/9/200210/10/200210/10/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/09/2002 at 17:44:11. Contact: ###-####. ok insul ext walls hd may be mis placed in north ext wall 10/10/2002 2:07:56 PM
BLD-Framing/Rough-in10/7/200210/7/200210/7/2002PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/07/2002 at 09:32:57. Contact: ###-####. ok tocover ext 10/7/2002 1:54:44 PM
BLD-Framing/Rough-in9/24/20029/24/20029/24/2002PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/24/2002 at 11:02:35. Contact: ###-####. wip ok to cover partial ext walls 9/24/2002 3:01:49 PM
BLD-Footing8/14/20028/14/20028/14/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 08/14/2002 at 10:09:27. Contact: ###-####. done by mti 8/14/2002 4:38:36 PM
BLD-Footing8/13/20028/13/20028/13/2002PPASS
DetailsTom Arcoraci
###-#### SHANE pending mti 8/13/2002 4:17:10 PM
BLD-Footing8/12/20028/12/20028/12/2002PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/12/2002 at 07:30:12. Contact: ###-####. pending mti 8/12/2002 3:53:36 PM
(F) Reprint permit  6/19/2002  
Print Occupancy Form  6/18/2002 DONE
Inspection Record Card- Bld  6/18/2002 DONE
Telephone call  6/18/2002 DONE
permit ready and need ACHD
Issue PAID IN FULL permit  6/18/2002  
Routing - PLAN CHECK6/14/2002 6/17/2002 PASS
Plan resubmittals received  6/17/2002 DONE
Received two sets of resubmittal sheets SD-1.1 and SD-1.2 with transmittal. Routed to John Menard.
PLANS/APPL TAKEN TO FRONT DESK  6/17/2002 PASS
Plan assigned to (JCM)4/3/2002 6/17/2002 PASS
DetailsJohn Menard
6/17/2002 13:57:25 JCM - activity updated through activity BLDA022 from case BLD02-00751.
Routing - PLANNING Land Div6/14/20026/14/20026/14/2002 PASS
Routing - FIRE6/7/2002 6/13/2002 PASS
Plan resubmittals received  6/13/2002 DONE
Received two copies of revised traffic bollard. Put with plans. kmm
Routing - PLAN CHECK6/7/2002 6/7/2002 PASS
Plan Reviewer's activity  6/7/2002 PASS
reviewed and approved the resubmitted plan sheets as drawn with attached comment list. JCM
Routing - PUBLIC WORKS5/21/2002 6/7/2002 PASS
Routing Off Site - STRUCTURAL6/4/2002 6/5/2002 PASS
contacted PDQ to take resubmitted plans of 5/29/02 to outside eng. kmm Received a fax from the consulting structural engineer approving the resubmitted structural documents. JCM
Plan resubmittals received  6/5/2002 DONE
Received five copies of civil sheets C1.0, C1.1, C1.2, C1.3, C1.4, C1.5, C1.6, C1.7. Routed to John M. kmm John had me route to Brian M. kmm
Plan resubmittals received  5/30/2002 DONE
Received two sets of resubmittal sheets SD-1.1, SD-1.2, S1.1, S2.1, S5.1, A-1.0, A-3.0, A-5.0, A-5.1, A-5.2, A5.3, A-5.4, A-5.5, A-5.6, A-5.7, E2.1L with letter from Stapley Engineering and comment letter. Routed to John Menard.
Routing - PLAN CHECK4/29/2002 5/21/2002  
Routing - FIRE4/22/2002 4/25/2002 FAIL
WATER, HYDRANT
Plan Review Completed(1st rev)  4/25/2002 FAIL
Routing - PLAN CHECK4/25/2002 4/25/2002  
Plan resubmittals requested  4/22/2002  
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Routing - PLAN CHECK4/18/2002 4/22/2002 FAIL
Routing - PLUMBING4/15/2002 4/18/2002 PASS
revise civil sewer drawings to match plumbing, cleanout required every 100", additional cross connection protection may be required at the wash area.
Routing Off Site - STRUCTURAL4/3/2002 4/18/2002 FAIL
Contacted PDQ to take plans to outside eng. kmm
Plan resubmittals requested  4/18/2002  
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING4/12/2002 4/15/2002 PASS
Approved per DRH02-9.
Routing - PUBLIC WORKS4/5/2002 4/12/2002 FAIL
Requries street light plan per Bill Colson. Requires other information per Brian M. kmm
Routing - PLANNING Land Div4/3/2002 4/5/2002 FAIL
Return to Land division for review after routed to everyone else. (blc)
Application received  4/3/2002  
Plans ACCEPTED BY PLAN TECH  4/3/2002 DONE
Plan routing begun/NEW & ADDTN  4/3/2002 DONE