DOC - Permit Finaled | 9/4/2002 | 9/4/2002 | 9/4/2002 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 9/4/2002 11:33:27 AM
|
BLD-Final | 9/3/2002 | 9/3/2002 | 9/3/2002 | P | PASS |
Dave Hannah
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie this project has been reveiwed in the field by perry pain of plan reveiw george slane inspection superviser and my self this project is being finaled as per permit as non habitable space no access to house from this space is allowed 9/4/2002 11:33:09 AM
|
BLD-Final | 8/13/2002 | 8/13/2002 | 8/13/2002 | P | CANC |
Russ Owen
|
|
|
###-#### ROBERT . 8/13/2002 4:13:51 PM.This room does not meet code, A permit shold have never been issued as there is no plans and the so called existing patio is non conforming,also no footings this structure sits on blocks, no lateral support. Also not it is fully insulated and will be completly drywalled ? 8/13/2002 4:34:49 PM
|
BLD-Final | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### ROBERT this project was built with out a permit home owner has covered both the inside and out roof is over built on to exst roof and there is no foundation under addition it is setting on blocks home owner is going to think over what he wants to do 4/8/2002 3:54:53 PM
|
(F) Reprint permit | | | 4/8/2002 | | |
|
|
|
|
Plan assigned to (PEP) | 4/5/2002 | 4/5/2002 | 4/5/2002 | | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 4/5/2002 | | DONE |
|
|
|
|
Inspector's copy Bld permit | | | 4/5/2002 | | DONE |
|
|
|
|
Issue & PRINT permit | | | 4/5/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2002 | | DONE |
|
|
|
|
Application received | | | 4/5/2002 | | |
|
|
|
|