Print Statement | | | 6/29/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/29/2004 | | DONE |
|
|
|
|
BLD-Final | 1/27/2003 | 1/28/2003 | 1/28/2003 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
DOC - Permit Finaled | 1/28/2003 | 1/28/2003 | 1/28/2003 | A | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 1/28/2003 10:18:14 AM
|
BLD-Energy code compliance | 10/24/2002 | 10/25/2002 | 10/25/2002 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung call first please
|
BLD-Framing/Rough-in | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | PASS |
Tom Arcoraci
|
|
|
call 1 hr prior to going Al ###-#### ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Framing/Rough-in | 10/21/2002 | 10/21/2002 | 10/21/2002 | P | FAIL |
Tom Arcoraci
|
|
|
call 1hr prior to going; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung cn posted 10/21/2002 3:20:29 PM
|
BLD-Framing/Rough-in | 10/16/2002 | 10/17/2002 | 10/17/2002 | A | NR |
Tom Arcoraci
|
|
|
CALL FIRST 1HR PRIOR TO GOING; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung called at 9 am no one there at 10 am elec rough fail10/17/2002 10:01:05 AM 10/17/2002 10:02:46 AM
|
BLD-Framing/Rough-in | 10/2/2002 | 10/2/2002 | 10/2/2002 | P | FAIL |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung eng to ispect and ok see correction notice 10/2/2002 2:52:55 PM
|
BLD-Framing/Rough-in | 9/30/2002 | 10/1/2002 | 10/1/2002 | A | FAIL |
Dave Hannah
|
|
|
al or cell ###-####--shear ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie no city aproved plans on site 10/1/2002 10:17:55 AM
|
BLD-Framing/Rough-in | 10/1/2002 | 10/1/2002 | 10/1/2002 | P | CANC |
Dave Hannah
|
|
|
re-insp al -shear panel ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 7/24/2002 | 7/24/2002 | 7/24/2002 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 16:29:27. Contact: ###-####. tomany correction have engineer out to approve c/n given to contractor. 7/18/2002 11:57:10 AM
|
BLD-Grading Inspection | 7/17/2002 | 7/17/2002 | 7/17/2002 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer.
|
BLD-Footing | 7/9/2002 | 7/10/2002 | 7/9/2002 | A | CANC |
Tom Arcoraci
|
|
|
ft insp -###-#### chris called to canc not ready yet will call when ready7-9-02///dld
|
BLD-Footing | 7/3/2002 | 7/8/2002 | 7/8/2002 | A | CANC |
Russ Owen
|
|
|
CHRIS ###-####
|
BLD-Footing | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | CANC |
Tom Arcoraci
|
|
|
chris ###-####. 7/8/2002 11:16:56 AM not at work 7/15/2002 7:37:01 AM
|
BLD-Footing | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | NR |
Jim Storey
|
|
|
chris ###-####. 7/8/2002 11:16:56 AM need letter from engineer of site inspection to verify soil and footing configuration. 7/8/2002 4:54:31 PM
|
Plan assigned to (DJO) | 6/28/2002 | 6/28/2002 | 7/3/2002 | | PASS |
Dan Overy
|
|
|
7/3/2002 11:42:00 DJO - activity updated through activity BLDA022 from case BLD02-00795.
|
Plan Reviewer's activity | | | 7/3/2002 | | DONE |
|
|
|
revisions received. only one approved set is being issued due to amount of red lining.
|
Case Summary (BLD) | | | 7/3/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 7/3/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/3/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/3/2002 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Issue PAID IN FULL permit | | | 7/3/2002 | | DONE |
|
|
|
|
Pending Assignment by DJO | 4/8/2002 | | 7/2/2002 | | DONE |
Dan Overy
|
|
|
7/2/2002 08:00:25 DJO - activity updated through activity BLDA169 from case BLD02-00795.
|
Plan Reviewer's activity | | | 7/1/2002 | | PEND |
|
|
|
continued review. beam schedule numbers are not incorporated to framing plans. it also appears that plans have been modified as beam span in basement area has been increased. have contacted both the contractor and engineer. revisions will be submitted.
|
Plan Reviewer's activity | | | 6/28/2002 | | PEND |
|
|
|
started review 6/28/02. called contractor about roof framing. truss layout faxed from roberts truss. will continue review monday.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/28/2002 | | PEND |
|
|
|
|
Routing - FIRE | 6/12/2002 | | 6/13/2002 | | DONE |
|
|
|
No fire sprinklers required.
|
Routing - PLANNING | 6/11/2002 | 6/11/2002 | 6/11/2002 | | PASS |
|
|
|
Revised site plan
|
Routing - PUBLIC WORKS GRADING | 6/6/2002 | 6/6/2002 | 6/11/2002 | | PASS |
Rita DeYoung
|
|
|
Plan revised, routed back to Terry. Revised plan approved
|
Telephone call | | | 4/25/2002 | | DONE |
|
|
|
Called and left Al a message on his mobile phone reminding him that I have these plans on hold and that he needs to come in to redline the driveway.
|
Routing - PLANNING | 4/10/2002 | | 4/23/2002 | | FAIL |
|
|
|
Need to adjust driveway. Vreeland will be in to Redlilne this afternoon.
|
Routing - PLANNING Land Div | 4/22/2002 | 4/22/2002 | 4/22/2002 | | PASS |
|
|
|
Approved. Provided Warranty Deed recorded in December 15, 1956.
|
Routing - PLANNING Land Div | 4/15/2002 | 4/15/2002 | 4/16/2002 | | FAIL |
|
|
|
waiting for deeds - Al will bring in or fax to David Abo
|
Routing - PUBLIC WORKS | 4/10/2002 | | 4/10/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 4/8/2002 | | 4/10/2002 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter attached to plans.
|
Application received | | | 4/8/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 6/13/2002 | | | | |
|
|
|
|