Case Summary (BLD) | | | 11/13/2015 | | DONE |
|
|
|
|
Fee Review-notes | 7/23/2003 | 7/23/2003 | 7/23/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
Permanent occupancy | | | 11/20/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9449 issued 11-20-02 to Fisher Chiropractic.
|
BLD-Final | 10/11/2002 | 10/11/2002 | 10/11/2002 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson ok for perm occ 10/11/2002 3:52:34 PM
|
Permanent Occupancy | | 10/11/2002 | 10/11/2002 | | DONE |
|
|
|
|
BLD-Other | 8/1/2002 | 8/2/2002 | 8/2/2002 | A | CANC |
Tom Arcoraci
|
|
|
LANDING AND HAND RAILS ###-#### CHRIS
|
BLD-Other | 8/2/2002 | 8/2/2002 | 8/2/2002 | P | PASS |
Tom Arcoraci
|
|
|
LANDING AND HAND RAILS ###-#### CHRIS
|
BLD-Final | 8/2/2002 | 8/2/2002 | 8/2/2002 | P | PART |
Tom Arcoraci
|
|
|
ok for temp occ cn posted
|
BLD-Conference | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | PASS |
Tom Arcoraci
|
|
|
handrail consult ###-#### chris
|
Code Occupancy Approval Temp | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | FAIL |
Scott M.Brown
|
|
|
NEEDS TO BOND FOR PARKING IMPROVEMENT AND CLEAN UP $440.00 7/29/2002 4:13:34 PM
|
BLD-Final | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | NR |
Tom Arcoraci
|
|
|
Temp. only\\###-####
|
FIRE-Final Inspection | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 7/26/2002 1:58:06 PM
|
BLD-Framing/Rough-in | 7/19/2002 | 7/19/2002 | 7/19/2002 | P | PART |
Tom Arcoraci
|
|
|
CHRIS ###-#### ok to cover old garage 7/19/2002 3:27:42 PM
|
BLD-Framing/Rough-in | 7/15/2002 | 7/15/2002 | 7/15/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 09:38:57. Contact: ###-####. ok to cover walls of old garage 7/15/2002 4:07:25 PM
|
BLD-Footing | 6/28/2002 | 6/28/2002 | 6/28/2002 | P | PASS |
Tom Arcoraci
|
|
|
ft insp- chris- ###-####
|
BLD-Framing/Rough-in | 6/28/2002 | 6/28/2002 | 6/28/2002 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 6/28/2002 3:53:57 PM ok for bath room and basement cover
|
Issue PAID IN FULL permit | | | 5/22/2002 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 4/15/2002 | 4/29/2002 | 5/17/2002 | | PASS |
Dan Stuart
|
|
|
5/17/2002 10:21:53 DRS - activity updated through activity BLDA022 from case BLD02-00820.
|
Routing - PLAN CHECK | 5/7/2002 | | 5/17/2002 | | PASS |
|
|
|
Requested submittals received and inserted into or attached to plans. Approved as noted on plans and all attached plan review comments, engineering & clarification details also attached to plans.
|
Plan resubmittals received | | | 5/17/2002 | | DONE |
|
|
|
Received 8-1/2" x 11" plan sheet declaring the second floor framing to be 2" x 8" throughout instead of 2 x 6 on the west half.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2002 | | PASS |
|
|
|
To permit desk to issue.
|
Inspection Record Card- Bld | | | 5/17/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/17/2002 | | DONE |
|
|
|
|
Telephone call | | | 5/17/2002 | | DONE |
|
|
|
CALLED LEFT V MESSAGE PERMIT REASY 5-17-02///DLD
|
Plan resubmittals received | | | 5/16/2002 | | DONE |
|
|
|
Received two copies of supplemental structural calculations for 2x 6 members and 2x 8 members. Routed to Dan S. kmm
|
Telephone call | | | 5/13/2002 | | DONE |
|
|
|
Called AHJ to talk with Keith Jones concerning the floor joist sizes & loads designed for. He has not had an opportunity to review the designs done by Riley or review which joist details are correct. He will review his files & discuss with Margie and provide response and design data through her.
|
Plan resubmittals requested | | | 5/10/2002 | | |
|
|
|
Resubmittals & response of 5/9/02 are incomplete. It is unclear what the existing floor joist sizes are based on this plan submittal and if they are 2 x 6 as indicated there are structural concerns. The re-submitted plans did not address the additional dead load of 20 psf required under section 1606 UBC for office uses where partion locations are subject to change.Margie will review with tenant and structural engineering and provide corrections.
|
Telephone call | | | 5/10/2002 | | DONE |
|
|
|
Talked with Margie Kennedy on phone to discuss plans submitted and the optional restroom floor plan layout. The installation of the existing sink to a new location would not comply with CABO/ANSI A117.1-92, Section 4.20 for minimum sink projection from wall to allow accessible use. Not moving the existing walls to comply with details on submitted plans and installing the sink correctly would cause the sink to infringe into the minimum maneuverability area required. It appears that the east end restroom wall needs to be moved as indicated to meet the minimum code requirements.
The resubmitted plans also indicate 2 x 6 floor joists in places originally indicating 2 x 8's and they no longer comply with the engineering provided from AHJ. This matter needs to be resolved and the additional 20 psf dead load called for in section 1606.2 of UBC is required for office use design and not optional. This also needs to be addressed by the structural engineer.
|
Plan resubmittals received | | | 5/9/2002 | | DONE |
|
|
|
Received two copies of revised sjeets A2.0 and A2.1, one copy of response letter, colored elevation, optional bathroom design. Routed to Dan S. kmm
|
Plan Review Completed(1st rev) | | | 5/7/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 5/1/2002 | | 5/7/2002 | | PASS |
|
|
|
aproved without written comment
|
Routing - PLAN CHECK | 4/23/2002 | | 5/1/2002 | | FAIL |
|
|
|
Resubmittals required. Routing to fire code analyst for review while awaiting architects response.
|
Plan resubmittals requested | | | 5/1/2002 | | FAIL |
|
|
|
Copy of corrections faxed to Margie. Copy of corrections and general comments mailed to Margie.
|
Routing - PLANNING | 4/19/2002 | | 4/23/2002 | | PASS |
|
|
|
Approved per CZC02-15.
|
Routing - PUBLIC WORKS | 4/15/2002 | | 4/18/2002 | | PASS |
|
|
|
|
First Notice | 4/9/2002 | 4/9/2002 | 4/9/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/9/2002 | | DONE |
|
|
|
|
Application received | | | 4/9/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2002 | | DONE |
|
|
|
|