BLD-Final | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 07:34:02. Contact: ###-####.
|
DOC - Permit Finaled | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | PASS |
Jim Storey
|
|
|
Finaled by inspector at 7/9/2002 4:38:41 PM
|
BLD-Energy code compliance | 6/4/2002 | 6/4/2002 | 6/4/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 10:20:00. Contact: ###-####.insulation ok. 6/4/2002 3:13:16 PM
|
BLD-Framing/Rough-in | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 08:50:19. Contact: ###-####. ok to insulate 6/3/2002 4:57:29 PM
|
BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | A | FAIL |
Jim Storey
|
|
|
1. table 23 nailling schedule nail bottom wall plate to mud sill plate with 16p nails at 16 inches oc.
2. north side of garage door header not supported at king stud and trimer to foundation.
|
BLD-Wall cover | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PASS |
Jim Storey
|
|
|
sheer ok
|
BLD-Foundation | 5/3/2002 | 5/7/2002 | 5/7/2002 | A | DONE |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 12:30:51. Contact: ###-####. Scheduled by a walls placed with out insp / back fill in place.contractor via Hello! on 05/03/2002 at 12:30:51. Contact: ###-####. 5/7/2002 8:43:12 AM
|
BLD-Footing | 5/3/2002 | 5/6/2002 | 5/6/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 12:30:08. Contact: ###-####. wip rebar on truck 5/6/2002 11:08:55 AM
|
Plan assigned to (DJO) | 4/26/2002 | 4/26/2002 | 5/1/2002 | | PASS |
Dan Overy
|
|
|
5/1/2002 11:59:49 DJO - activity updated through activity BLDA022 from case BLD02-00844.
|
Plan Reviewer's activity | | | 5/1/2002 | | DONE |
|
|
|
received revised plans and tall wall engineering. plans still incorrect with rebar and shear call-outs. have red-lined and issued.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2002 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2002 | | DONE |
|
|
|
CALLED LEFT V-MESSAGE WITH LOIS PLANS READY 5-1-02///DLD
|
Issue PAID IN FULL permit | | | 5/1/2002 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 4/26/2002 | | PEND |
|
|
|
have called both designer and contractor about errors on plans. boise city conditions called out incorrectly, re-inforcing schedules wrong. engineering will be required for tall walls at stair core.
|
Print Pending Permit.LaserJet4 | | | 4/26/2002 | | PEND |
|
|
|
|
Plan Review Report | | | 4/26/2002 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/25/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 4/17/2002 | 4/17/2002 | 4/17/2002 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 4/17/2002 | | 4/17/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 4/11/2002 | | 4/15/2002 | | PASS |
|
|
|
routed to Dave to check for legal land division
|
Application received | | | 4/11/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 4/15/2002 | 4/15/2002 | | | FAIL |
|
|
|
waiting for deeds-will bring in or fax
|
Pending Assignment by DJO | 4/11/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 4/17/2002 | | | | |
|
|
|
|