Second Notice BLD | 12/5/2005 | 12/5/2005 | 12/15/2005 | | DONE |
|
|
|
First Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
First Notice | | 8/15/2005 | 12/5/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/2/2005 | | DONE |
|
|
|
|
Second Notice BLD | 10/10/2005 | 10/10/2005 | 10/10/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/15/2005 | 10/10/2005 | | DONE |
|
|
|
|
BLD-Final | 8/9/2005 | 8/15/2005 | 8/15/2005 | A | PASS |
Jim Sly
|
|
|
per jim sly -needs a shell fn per george slane; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/C issued.
|
BLD-Final | 8/9/2005 | 8/15/2005 | 8/15/2005 | A | PASS |
Jim Sly
|
|
|
per George Slane reopen case and give letter of compliance.rad C/C issued. Unable to contact owner....Left C/C taped to window at jobsite.
|
DOC - Permit Finaled | 8/15/2005 | 8/15/2005 | 8/15/2005 | P | PASS |
Jim Sly
|
|
|
|
Reopen Permit (ISS) | | | 8/9/2005 | | |
|
|
|
Per George S. open permit so Jim Sly can do a Letter of Compliance.rad
|
PubWorks Occupancy Approval | 1/20/2005 | 1/20/2005 | 1/20/2005 | | DONE |
|
|
|
No final inspection, drive-by shows complete 1/20/05 R.Rokovitz
|
DOC - Permit Expired | 8/9/2004 | 8/9/2004 | 8/9/2004 | A | PASS |
Jim Sly
|
|
|
Expired by inspector at 8/9/2004 9:11:23 AM
|
DOC - Permit Expired | 8/9/2004 | 8/9/2004 | 8/9/2004 | A | PASS |
Jim Sly
|
|
|
Expired by inspector at 8/9/2004 9:11:29 AM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | DONE |
Jim Sly
|
|
|
All trades finaled....and previously Exp by JET 8/9/2004 9:10:39 AM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | DONE |
Jim Sly
|
|
|
All trades finaled...and previously Exp by JET. 8/9/2004 9:11:16 AM
|
Expired/Cancelled | | | 8/18/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/25/2002 | 9/26/2002 | 9/26/2002 | A | PASS |
Jim Sly
|
|
|
julio; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 9/12/2002 | 9/13/2002 | 9/13/2002 | A | PART |
Jim Sly
|
|
|
###-#### Roof nailing...OK, front entry trusses H2.5's drag struts installed. 9/13/2002 12:48:31 PM
|
BLD-Framing/Rough-in | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Framing/Rough-in | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Foundation | 8/5/2002 | 8/6/2002 | 8/6/2002 | A | PASS |
Jim Sly
|
|
|
JULIO ; Phone #: ###-####
|
BLD-Footing | 7/29/2002 | 7/31/2002 | 7/31/2002 | A | PASS |
Jim Sly
|
|
|
###-#### rebar insp
|
(F) Reprint permit | | | 7/17/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/16/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/2/2002 | | 7/3/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/3/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/3/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/3/2002 | | DONE |
|
|
|
permit ready and fees due
|
Plan assigned to (M_P) | 5/1/2002 | | 7/3/2002 | | PASS |
Mike Phillips
|
|
|
7/3/2002 09:39:36 M_P - activity updated through activity BLDA022 from case BLD02-00857.
|
Routing - PLANNING Land Div | 6/27/2002 | | 7/2/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 6/21/2002 | | 6/27/2002 | | PASS |
|
|
|
Building has been move West 3'-6". Review and mak e comments as needed.
|
Routing - PLAN CHECK | 5/15/2002 | | 6/21/2002 | | |
|
|
|
Routing to Planning building has ben moved.
|
Plan resubmittals received | | | 6/21/2002 | | DONE |
|
|
|
Received three copies of resubmittal sheet a1.11 with transmittal letter. Routed to
Mike Phillips
|
Routing Off Site - STRUCTURAL | 5/30/2002 | | 6/4/2002 | | PASS |
|
|
|
Contacted PDQ to take revised plans of 5/29/02 to to outside eng. kmm
Outside engineering review completed.
|
Plan resubmittals received | | | 5/29/2002 | | DONE |
|
|
|
Received one copy of resubmittal sheets S3.0, A2.11, A4.11 with comment responses and (3) copies of supplemental structural calculations. Called Erstad thornton architects that one more set of resubmittal sheets are required. Routed to Mike Phillips.
|
Plan resubmittals received | | | 5/29/2002 | | DONE |
|
|
|
Received two more sets of resubmittal plans a2.11, a4.11, s3.0. Routed to Mike Phillips.
|
Routing Off Site - STRUCTURAL | 5/9/2002 | | 5/23/2002 | | FAIL |
|
|
|
Routed resubmitted drawings received 5/14/02 to outside engineering.
Faxing copy of report to Engineer of Record.
|
Routing - PLAN CHECK | 5/9/2002 | | 5/15/2002 | | PEND |
|
|
|
Waiting for 1) Certificate of Value deleting mechanical value 2) Outside engineering review report 3) Land division to approve prior to issuing permit
|
Plan resubmittals received | | | 5/14/2002 | | DONE |
|
|
|
Received 1 One architectural response letter with clarification of change in project scope.
2. Two copies of revised sheets a2.11, a3.11, a3.12, a4.11, a5.11
3. One response letter from structural engineer.
4. Thee copies of revised structural sheets S1.0, S2.0, S3.0, S4.0, S5.0
5. Three sets of structural calculations
6. Three copies of mechancial performance specifications-includes plumbing,
HVAC and fire aprinkler information.
Routed to Mike P. kmm
|
Routing - PUBLIC WORKS | 5/8/2002 | | 5/9/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/7/2002 | | 5/8/2002 | | |
|
|
|
|
Plan Review Completed(1st rev) | | | 5/7/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 5/2/2002 | | 5/7/2002 | | PASS |
|
|
|
|
Print permit w/o conditions | | | 5/2/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 4/29/2002 | | 5/2/2002 | | FAIL |
|
|
|
Plan review completed, additional informaiton required for further review prior to issuing permit.
|
Plan assigned to (JCM) | 4/12/2002 | | 5/1/2002 | | |
John Menard
|
|
|
Reassigned to Mike Phillips to shorten review time. JCM
|
Routing - PLUMBING | 4/25/2002 | | 4/29/2002 | | PASS |
|
|
|
per plans and specs and 200 upc, plans show a 2' WATER SERVICE AND THE SPECS SHOW 5- 1 1/2" WATER SERVICES.
|
Routing Off Site - STRUCTURAL | 4/15/2002 | | 4/29/2002 | | FAIL |
|
|
|
Received a comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 4/29/2002 | | |
|
|
|
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PUBLIC WORKS | 4/16/2002 | | 4/25/2002 | | FAIL |
|
|
|
Requires Drainage Plan Revision
|
Routing - PLANNING | 4/25/2002 | | 4/25/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 4/12/2002 | | 4/15/2002 | | FAIL |
|
|
|
Need copy of recorded deed.
|
Plans ACCEPTED BY PLAN TECH | | | 4/12/2002 | | DONE |
|
|
|
Received (3) sets of plans with proposed plumbing/mechanical, (3) extra sets of civil/drainage/grading plans, storm water drainage report with drainage calcs./O&M, structural calculations, and letter from United Water.
|
Application received | | | 4/12/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/12/2002 | | |
|
|
|
|
Fee Review-notes | 4/12/2002 | 4/12/2002 | | | |
|
|
|
|