BLD-Final | 5/19/2003 | 5/19/2003 | 5/19/2003 | P | PASS |
Dave Hannah
|
|
|
dewayne; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c.c # 22919 issued 5/19/2003 2:30:11 PM
|
DOC - Permit Finaled | 5/19/2003 | 5/19/2003 | 5/19/2003 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 5/19/2003 2:30:13 PM
|
BLD-Framing/Rough-in | 12/23/2002 | 12/23/2002 | 12/23/2002 | P | PASS |
Dave Hannah
|
|
|
dwayne ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 12/23/2002 | 12/23/2002 | 12/23/2002 | P | PASS |
Dave Hannah
|
|
|
dwayne ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Conference | 12/20/2002 | 12/20/2002 | 12/20/2002 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Conference | 12/20/2002 | 12/20/2002 | 12/20/2002 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | FAIL |
Dave Hannah
|
|
|
dwayne ; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliec/n on site ok to insulate 12/20/2002 1:40:26 PM
|
BLD-Framing/Rough-in | 12/19/2002 | 12/19/2002 | 12/19/2002 | P | NR |
Jim Storey
|
|
|
###-#### ###-####previous c/n not complet/ engery sealants not installed/ floor joist not blk. at cantalever no insp performed. 12/19/2002 3:32:34 PM
|
BLD-Framing/Rough-in | 12/11/2002 | 12/12/2002 | 12/12/2002 | A | PART |
Dave Hannah
|
|
|
SHEAR; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok to cover ext check retro hold down at framing 12/12/2002 10:03:17 AM
|
BLD-Framing/Rough-in | 12/11/2002 | 12/11/2002 | 12/11/2002 | P | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung need to restaple areas that staple have been over shot need to add blocking in areas that blocking is missing need to retro fit hold down west side of front door were side lite was added in panel this was a shear wall inspection only c/n posted 12/11/2002 4:09:16 PM
|
BLD-Foundation | 11/19/2002 | 11/19/2002 | 11/19/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/19/2002 at 07:31:20. Contact: ###-####. work in progress 90% completed 11/19/2002 6:56:56 PM
|
BLD-Footing | 11/18/2002 | 11/18/2002 | 11/18/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/18/2002 at 07:05:11. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 11/14/2002 | | DONE |
|
|
|
|
Telephone call | | | 10/28/2002 | | DONE |
|
|
|
brian came in & said he would pickup permit by wed the 30th..did not want to resubmit...
|
Telephone call | | | 10/24/2002 | | DONE |
|
|
|
left mess for brian that permit needs to be picked up
|
Inspection Record Card- Bld | | | 5/2/2002 | | DONE |
|
|
|
|
Telephone call | | | 5/2/2002 | | DONE |
|
|
|
CALLED LEFT V-MESSAGE " BRIAN" PLANS READY 5-2-02 ///DLD
|
Plan assigned to (DJO) | 5/1/2002 | 5/1/2002 | 5/1/2002 | | PASS |
Dan Overy
|
|
|
5/1/2002 16:23:38 DJO - activity updated through activity BLDA022 from case BLD02-00878.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/1/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 5/1/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/1/2002 | | |
|
|
|
|
Application received | | | 4/15/2002 | | |
|
|
|
|
Routing - PLANNING | 4/15/2002 | | 4/15/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/15/2002 | | 4/15/2002 | | PASS |
|
|
|
|
Pending Assignment by DJO | 4/15/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 4/16/2002 | | | | |
|
|
|
|