BLD-Final | 9/19/2002 | 9/23/2002 | 9/23/2002 | A | PASS |
Jim Sly
|
|
|
DENNIS; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/C issued. 9/23/2002 11:54:39 AM
|
DOC - Permit Finaled | 9/23/2002 | 9/23/2002 | 9/23/2002 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 9/23/2002 11:54:48 AM
|
BLD-Energy code compliance | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 09:49:15. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 10:27:19. Contact: ###-####. ok to insulate 6/25/2002 2:22:40 PM
|
BLD-Framing/Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/19/2002 at 08:10:34. Contact: ###-####.needs foam seal package and fire blocking at fireplace chase 6/19/2002 2:25:25 PM
|
BLD-Wall cover | 5/29/2002 | 5/29/2002 | 5/29/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 06:50:02. Contact: ###-####. shear ok to cover ext need to check reto hold downs at framing 5/29/2002 11:30:39 AM
|
BLD-Wall cover | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 08:39:44. Contact: ###-####. hold downs in wrong locations nailing on panels needs tobe added 5/28/2002 2:43:06 PM
|
BLD-Foundation | 5/10/2002 | 5/10/2002 | 5/10/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 06:39:06. Contact: ###-####. WIP, also informed contractor that the plans show hold downs. Drawn in by our office, not shown on plan submittals, as required by the uniform building code, note also plans not to scale as required. 5/10/2002 11:14:07 AM
|
BLD-Footing | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PART |
Dave Hannah
|
|
|
|
BLD-Footing | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PART |
Dave Hannah
|
|
|
###-#### chris
|
CHANGE STATUS TO (ISS) | | | 5/9/2002 | | DONE |
|
|
|
|
Application received | | | 4/19/2002 | | |
|
|
|
|
Plan assigned to (PEP) | 4/19/2002 | | 4/19/2002 | | PASS |
Perry Paine
|
|
|
4/19/2002 15:30:15 PEP - activity updated through activity BLDA022 from case BLD02-00934.
|
Print Pending Permit.LaserJet4 | | | 4/19/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/19/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/19/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2002 | | |
|
|
|
|