BLD-Final | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 16:38:56. Contact: ###-####. C. of C. #23313 issued. 8/28/2002 12:03:48 PM
|
DOC - Permit Finaled | 8/28/2002 | 8/28/2002 | 8/28/2002 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 8/28/2002 12:03:54 PM
|
BLD-Framing/Rough-in | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 10:14:29. Contact: 08660768.Back porch modification--ok to finish--re-submitted to plan review--ok by Dan Overy. 7/10/2002 4:42:14 PM
|
BLD-Energy code compliance | 6/27/2002 | 6/28/2002 | 6/28/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 10:22:51. Contact: ###-####. Energy ok to cover house--framer was building covered structural patio at rear of house--not on plans--wrote C/N which stated no cover or pouring of concrete prior to securing permit and getting inspection. 6/28/2002 2:58:02 PM
|
BLD-Framing/Rough-in | 6/25/2002 | 6/26/2002 | 6/26/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 16:24:46. Contact: ###-####. C/N--Ok to insulate PENDING mechanical r.i. 6/26/2002 3:43:16 PM
|
BLD-Framing/Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/19/2002 at 08:47:13. Contact: ###-####. Shear-C/N--Missing holdowns--Retrofit prior to framing inspection. Ok to cover exterior. 6/19/2002 3:36:55 PM
|
BLD-Framing/Rough-in | 6/17/2002 | 6/18/2002 | 6/18/2002 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 11:34:21. Contact: ###-####.C/N posted--No approved plans on site. 6/18/2002 3:28:32 PM
|
BLD-Foundation | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PART |
Steven Webb
|
|
|
###-#### jerry found wip 5/23/2002 3:30:39 PM
|
BLD-Footing | 5/21/2002 | 5/22/2002 | 5/22/2002 | A | PASS |
Steven Webb
|
|
|
JERRY ###-####
|
Issue PAID IN FULL permit | | | 5/16/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/15/2002 | | |
|
|
|
|
Telephone call | | | 5/15/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 4/24/2002 | | 5/15/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 5/3/2002 | | 5/15/2002 | | PASS |
Steve Munroe
|
|
|
5/15/2002 09:32:07 SAM - activity updated through activity BLDA022 from case BLD02-00948.
|
Plan Reviewer's activity | | | 5/6/2002 | | PEND |
|
|
|
5/6/02 8:30 I called and talked to Brian with Gowanwood. I let him know that I need the cover letter for the suplied engineering plus engineering for the front wall do to overheight walls. He told me that he will call Mark McNeilly and than one of them will call me back. Plan review is finished and on hold till I recieve new engineering.
|
Print Pending Permit.LaserJet4 | | | 5/6/2002 | | |
|
|
|
|
Plan Review Report | | | 5/6/2002 | | |
|
|
|
|
Pending Assignment by DJO | 4/22/2002 | | 5/3/2002 | | DONE |
Dan Overy
|
|
|
5/3/2002 15:31:39 SAM - activity updated through activity BLDA183 from case BLD02-00948.
|
Routing - PUBLIC WORKS | 4/23/2002 | | 4/24/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 4/22/2002 | | 4/23/2002 | | PASS |
|
|
|
|
Application received | | | 4/22/2002 | | |
|
|
|
|