Permit Information
Permit NumberBLD02-00955
StatusFinaled
Name MCGLOCHLIN HENRY S ET UX
Site Address 6206 W STATE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(LAUNDRY MUTT) New 1,294 sq.ft. tenant space for dog grooming in shell building that was done under BLD01-00747 per approved plans on file. Work to include a new accessible restroom, new one-hour rated tenant demising wall, new interior walls, a new interior door, interior finish, new suspended ceiling, pouring interior concrete slab, fire sprinkler work, new mechanical, new plumbing, and new electrical work. Certificate of Occupancy to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase. (PC#0256-02) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 12/2/200412/2/2004 DONE
Details
FIRE-Final Inspection12/3/200212/4/200212/4/2002APASS
DetailsTroy Cobbley
fire life/safety and fire sprinklers finaled 12/4/2002 10:43:23 AM
BLD-Final12/3/200212/4/200212/4/2002ACANC
DetailsTony Young
late pm ###-####
BLD-Final12/4/200212/4/200212/4/2002PPASS
DetailsTony Young
late pm
ok for perm. occupancy 12/4/2002 3:24:11 PM
Permanent occupancy UNPAID FEE  12/4/2002 DONE
Issued to Laundry Mutt #9463 aml
FIRE-Final Inspection12/3/200212/3/200212/3/2002PFAIL
DetailsTroy Cobbley
sprinklers are now correct but the duct smoke detector needs to have the correct type of wire installed 12/3/2002 2:48:02 PM
BLD-Final12/3/200212/3/200212/3/2002PPART
DetailsTony Young
call first to meet there ###-####
ok for temp occ. pending fire/lifesafety sign-off 12/3/2002 2:41:09 PM
FIRE-Final Inspection11/27/200211/29/200211/29/2002AFAIL
DetailsTroy Cobbley
sprinkler pendants appear to exceed the design spacing of the overhead system which they cannot due per note #6 on the fire review comments, provide a canopy for the sprinkler head missing one, provide key and cover on the knox key box and provide a test for the duct detector 11/29/2002 9:42:30 AM
BLD-Framing/Rough-in11/8/200211/8/200211/8/2002PPART
DetailsTony Young
ceiling grid -bruce--lock box on front door is 1290; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok pending trades and check south end wires at final for tightness and wires on air defussers 11/12/2002 8:38:01 AM
BLD-Framing/Rough-in10/22/200210/25/200210/25/2002AFAIL
DetailsTony Young
ceiling grid\\lock box 1290; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
c/n posted 10/25/2002 10:10:57 AM
BLD-Framing/Rough-in9/26/20029/26/20029/26/2002PPASS
DetailsJim Sly
bruce--lock box on front door- 1092; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Issue PAID IN FULL permit  7/29/2002 DONE
Telephone call  7/26/2002 DONE
left mess that permit is ready
Plan assigned to (JCB)4/25/2002 5/23/2002 PASS
DetailsJason Blais
5/23/2002 10:46:06 JCB - activity updated through activity BLDA022 from case BLD02-00955.
Routing - PLAN CHECK5/13/2002 5/23/2002 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  5/23/2002 PASS
Inspection Record Card- Bld  5/23/2002  
Print Occupancy Form  5/23/2002 DONE
Telephone call  5/23/2002 DONE
CALLED BRUCE PERMIT READY 5-23-02 ///DLD
Routing - PLUMBING5/22/20025/22/20025/22/2002 PASS
1 1/4" branch line to serve 10 tubs, wc, lav cw, all fixtures to be trapped and vented per 2000 upc.
Plan resubmittals received  5/22/2002 DONE
Received two sets of Sheets "2" via Bill Vandergrift with Plumbing's plan review. Routed to Jason Blais.
Telephone call  5/20/2002 DONE
Called contractor, Bruce Borup, concerning new Plumbing Plans required to be submitted. He said they would be coming in the next day or two.
Routing - FIRE5/9/2002 5/13/2002 PASS
Plan Review Completed(1st rev)  5/13/2002 FAIL
Routing - PLAN CHECK5/7/2002 5/9/2002 PEND
Plan review report sent and faxed to contractor. No response required. Plumbing Division has issues needing to be resolved. Plans to route to Fire Dept. for review. Then will need to be routed to Plumbing again when resubmittals received.
Routing - PLUMBING5/2/2002 5/7/2002 FAIL
please provide a plumbing plan showing a water system serving the 48 fixture units, premise protection if required, thermol expantion protection, cross connection protection to the tubs, also include venting for the waste system.
Routing - PUBLIC WORKS4/25/2002 5/2/2002 PASS
Plans ACCEPTED BY PLAN TECH  4/23/2002 DONE
First Notice4/22/20024/22/20024/22/2002 DONE
Application received  4/22/2002  
Recd Pcfee & Taken To Pln CK  4/22/2002 DONE