Fee Review-notes | 4/10/2003 | 4/10/2003 | 8/10/2004 | | DONE |
|
|
|
|
DOC - Permit Finaled | 6/16/2003 | 6/16/2003 | 6/16/2003 | P | PASS |
Carl Dependahl
|
|
|
Finaled by inspector at 6/16/2003 1:47:04 PM
|
BLD-Aging Inspection | 6/10/2003 | 6/10/2003 | 6/16/2003 | | DONE |
Carl Dependahl
|
|
|
|
BLD-Aging Inspection | 4/9/2003 | 4/9/2003 | 4/9/2003 | | DONE |
Carl Dependahl
|
|
|
previously finalled..."ok for l/c". 4/9/2003 9:11:33 AM struct ok; hvac is grouped to wrong struct permit. 4/9/2003 9:17:30 AM
|
BLD-Conference | 4/9/2003 | 4/9/2003 | 4/9/2003 | P | PASS |
Carl Dependahl
|
|
|
w Linda H...mec shouldn't be grouped 4/9/2003 5:25:56 PM
|
BLD-Final | 11/4/2002 | 11/5/2002 | 11/5/2002 | A | PASS |
Carl Dependahl
|
|
|
Lee; ok for c/o (l/c) 11/5/02 11:19:58 AM
|
BLD-Final | 11/4/2002 | 11/4/2002 | 11/4/2002 | P | NR |
Carl Dependahl
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Final | 10/7/2002 | 10/8/2002 | 10/8/2002 | A | PASS |
Rick Jackson
|
|
|
###-#### robin
|
BLD-Framing/Rough-in | 8/28/2002 | 8/29/2002 | 8/29/2002 | P | PART |
Carl Dependahl
|
|
|
corridor wall ok,chk firestops at final 8/29/2002 6:08:55 PM
|
BLD-Framing/Rough-in | 8/28/2002 | 8/28/2002 | 8/28/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### screen walls at entry(s) ok; finishes at 48" opening. 8/28/2002 2:18:18 PM
|
BLD-Framing/Rough-in | 8/26/2002 | 8/27/2002 | 8/27/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### NEW SECTION CORRIDOR WALL OK. 8/27/2002 4:01:12 PM
|
BLD-Conference | 8/19/2002 | 8/20/2002 | 8/20/2002 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/19/2002 at 15:52:51. Contact: ###-####. w/ bldr, provide width req'd at ADA shower & per fig 403.5 at "pathway"; referred dead-end issue to IBC 1004.3.2.3 (50' if serves B occ.) 8/20/2002 12:27:22 PM
|
BLD-Conference | 8/20/2002 | 8/20/2002 | 8/20/2002 | A | PASS |
Carl Dependahl
|
|
|
provide width per fig 403.5 at shower and as needed at doors... 8/20/2002 2:25:21 PM
|
BLD-Conference | 8/16/2002 | 8/19/2002 | 8/19/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/16/2002 at 14:38:35. Contact: ###-####...need plan, unable to verify site as doors security locked. recall. 8/20/2002 7:45:11 AM
|
FIRE-Conference | 8/13/2002 | 8/13/2002 | 8/13/2002 | P | DONE |
Troy Cobbley
|
|
|
discussed fire alarm and fire sprinkler requirements for the addition of one door outside of the mens and womens lockers and the relocation of one door to the judges chambers 8/13/2002 1:56:02 PM
|
BLD-Conference | 8/9/2002 | 8/12/2002 | 8/12/2002 | A | PASS |
Jim Sly
|
|
|
Met with Robin....Need Min. 36" clear (Mens showers to wall) as per appr plan..... Remove part of existing walls to obtain. 8/12/2002 10:23:02 AM 8/12/2002 10:23:45 AM
|
BLD-Conference | 8/8/2002 | 8/9/2002 | 8/9/2002 | A | NR |
Carl Dependahl
|
|
|
recall for 8-12 8/9/2002 9:08:01 AM
|
BLD-Conference | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | PASS |
Carl Dependahl
|
|
|
ROBIN ; Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/28/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/26/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2002 | | DONE |
|
|
|
permit ready and fees due
|
Routing - PLAN CHECK | 5/20/2002 | | 6/26/2002 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
Plan assigned to (CJW) | 4/25/2002 | | 6/26/2002 | | PASS |
Carl Westfall
|
|
|
6/26/2002 14:21:42 CJW - activity updated through activity BLDA022 from case BLD02-00967.
|
Plan resubmittals received | | | 6/25/2002 | | DONE |
|
|
|
Received three copies of revised sheets A221T and A450T and one cover sheet. Routed to Carl W. kmm
|
Routing - PLUMBING | 5/9/2002 | | 5/17/2002 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 5/9/2002 | | |
|
|
|
Failed first UBC review.
|
Routing - FIRE | 5/6/2002 | | 5/9/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/26/2002 | | 5/6/2002 | | |
|
|
|
Failed first UBC review. UBC plan review started May 3, 2002 and finished May 5, 2002. Resubmitted drawings were required. See the conditions list. A plan review report was sent to the architect.
|
Plan resubmittals received | | | 4/26/2002 | | DONE |
|
|
|
Received two sets of Stamped/Signed resubmittal sheets P210T, P220T, P41T, M221T with transmittal. Routed to Carl Westfall.
|
Routing - PUBLIC WORKS | 4/25/2002 | | 4/26/2002 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 4/25/2002 | | DONE |
|
|
|
Mechanical/plumbing plans require stamp and signature. Bob Tikker to send in new sets. Began routing without stamped and signed plans.
|
Plans ACCEPTED BY PLAN TECH | | | 4/24/2002 | | DONE |
|
|
|
1. No site plan.
2. No key plan.
3. No building code data on front of plans.
4. Plans not fully dimensioned.
5. Mechanical, Plumbing, and Electrical plans not stamped and signed. Called Dave Logan that Plumbing should be stamped and signed. He stated he would take care of it.
5. Plumbing, Mechanical, and Electrical Plans not stamped and signed.
6. Called Dave Logan that Mechanical and Plumbing plans were not stamped and signed. He stated that he would send someone down to take care of it, so I can start routing.
|
Application received | | | 4/23/2002 | | |
|
|
|
|