DOC - Permit Expired | | | 8/2/2006 | | DONE |
|
|
|
|
BLD-Aging Inspection | 7/26/2006 | 7/26/2006 | 7/26/2006 | | CANC |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 5/23/2006 | 5/23/2006 | 5/23/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 3/23/2006 | 3/23/2006 | 3/23/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 3/23/2006 | 3/23/2006 | 3/23/2006 | A | DONE |
Mike Jordan
|
|
|
Was expired perviously.
|
Expired/Cancelled | | | 8/18/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/6/2002 7:54:21 AM Ok to cover wall to roof deck/joist straps. Called Brian ###-#### and informed ok.5/6/2002 12:07:54 PM 5/6/2002 12:10:40 PM
|
BLD-Framing/Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/3/2002 6:39:40 PM Talked with engineer he has done a field reveiw, the hols hove been drilled and bolts have not been placed, Now I have driven from a job site to verify the placement of these bolts, they are in, but the nut can not be tightened untill the epoxy has dried, I have left a c/n to not cover untillI have re-inspected. The roofer had informed me he was planning on covering these. I called contractor back , and told him this , and when I was leaving rapid resonce was at site i informeed them of the correction I had placed. NOTE: THIS WAS NOT A CALLED IN INSPECTION. 5/3/2002 6:52:35 PM
|
BLD-Framing/Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/3/2002 6:41:13 PM The roof straps do not have the correct bolt, needs hilti epoy, also the existing straps need blocking under, called engineer, contractor on site, also talked with framer, The engineer will address a fix. C/n given to contractor.Note prior entry this am was a mistake, should be cancelled this is correct..3/2002 6:45:21 PM 5/3/2002 6:45:52 PM 5/3/2002 6:46:47 PM
|
BLD-Framing/Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/2/2002 4:37:18 PM . went over job with plan reveiw. 5/3/2002 3:20:19 PM
|
CHANGE STATUS TO (ISS) | | | 5/3/2002 | | DONE |
|
|
|
already pd fees changed status to issued/mls
|
BLD-Framing/Rough-in | 4/26/2002 | 5/2/2002 | 5/2/2002 | P | PART |
Russ Owen
|
|
|
late pm Kenny ###-#### New roof trusses are in place, The cmu wall to top cord of truss straps are not in place, also roof nailing not yet complete, will recall for am. 5/2/2002 4:35:41 PM 5/2/2002 4:36:52 PM
|
Issue PAID IN FULL permit | | | 4/26/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2002 | | PASS |
|
|
|
|
Application received | | | 4/26/2002 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/26/2002 | | DONE |
|
|
|
REVIEWED ORIGINAL PLANS, DISCUSSED ISSUANCE OF PERMIT WITH JENNIFER GILLIAND, MARLENE SOUTHARD, DAVE MILLER & BILL ALEXANDER.
|
Plan assigned to (R_H) | 4/26/2002 | | 4/26/2002 | | |
|
|
|
|
Case Summary (BLD) | | | 4/26/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2002 | | DONE |
|
|
|
|