Case Summary (BLD) | | | 6/28/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 8/31/2009 | | CANC |
|
|
|
|
Case Summary (BLD) | | | 8/31/2009 | | DONE |
|
|
|
|
VOIDED CHANGE STATUS | | | 8/31/2009 | | DONE |
|
|
|
Wrong action highlighted.
|
CHANGE STATUS TO (FNL) | | | 8/31/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/25/2008 | | |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 10/23/2002 | | DONE |
|
|
|
Perm Occ #9418 To Sandcastles learning Center
|
Permanent Occupancy | | 10/11/2002 | 10/11/2002 | | DONE |
|
|
|
|
BLD-Final | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok for perm occ 10/11/2002 12:07:21 PM
|
Code Occupancy Approval | 9/17/2002 | 9/16/2002 | 9/16/2002 | A | DONE |
Carol Montgomery
|
|
|
Meets approval with CU.
|
BLD-Final | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 16:13:32. Contact: ###-####. ok for temp cn issued for some handrails and missing door 8/29/2002 10:05:28 AM
|
FIRE-Final Inspection | 8/29/2002 | 8/29/2002 | 8/29/2002 | A | PASS |
Troy Cobbley
|
|
|
Life/safety items OK but exterior door hardware needs to be changed to approved type and verified by structural inspector
|
Temporary occupancy | | | 8/29/2002 | | DONE |
|
|
|
Temp. occ. Cert. #4855 issued 8-29-02 to the Sandcastles Learning Center.
|
PubWorks Occupancy Approval | 8/28/2002 | 8/28/2002 | 8/28/2002 | | DONE |
|
|
|
Project complete, signed Permanent Occupancy 08/27/02. R.Rokovitz
|
BLD-Framing/Rough-in | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 19:23:18. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 08:43:38. Contact: ###-####. CN POSTED 7/17/2002 11:08:33 AM
|
BLD-Framing/Rough-in | 7/16/2002 | 7/16/2002 | 7/16/2002 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 08:39:25. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/16/2002 at 08:42:09.
|
BLD-Framing/Rough-in | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 11:43:40. Contact: ###-####.went over framing beams and old hand stack all looks ok 7/9/2002 11:20:14 AM
|
BLD-Foundation | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 06:29:18. Contact: ###-####.
|
BLD-Footing | 6/11/2002 | 6/12/2002 | 6/12/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### chuck
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/10/2002 | | |
|
|
|
|
Print Occupancy Form | | | 6/10/2002 | | |
|
|
|
|
Telephone call | | | 6/10/2002 | | DONE |
|
|
|
talked to steve to verify plans are ready
|
Issue PAID IN FULL permit | | | 6/10/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/31/2002 | | 6/10/2002 | | PASS |
|
|
|
|
Plan assigned to (MLO) | 4/29/2002 | | 6/10/2002 | | PASS |
Mike Otto
|
|
|
6/10/2002 09:21:38 MLO - activity updated through activity BLDA022 from case BLD02-01010.
|
Meeting | | | 6/7/2002 | | DONE |
|
|
|
meeting in field with inspector T. Arcoraci and Mike Otto and owner Tami Sandymeyer to review roof framing. Owner will provide as built drawing of roof framing with truss drawings which are stamped and signed by the architect and or engineer for the single story portions of the building.
|
Plan resubmittals received | | | 6/7/2002 | | DONE |
|
|
|
sheets A3.0 and A5.0
|
Plan resubmittals received | | | 6/5/2002 | | DONE |
|
|
|
Received two copies of revised sheets, A2.0, A4.0, and calcs. Routed to Mike O. kmm
|
Routing - PUBLIC WORKS | 5/30/2002 | | 5/31/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/28/2002 | | 5/29/2002 | | FAIL |
|
|
|
met with architect went over corrections. MLO
|
Telephone call | | | 5/28/2002 | | DONE |
|
|
|
received call from owner for a foundation permit. Told owner that foundation permits only issued to new buildings and that the structural design for the project failed the review. MLO
|
Plan resubmittals received | | | 5/24/2002 | | DONE |
|
|
|
Received revised sheets T1.0, A3.0, A4.0, A5.0, A5.2, and one copy of cover letter, one copy of response letter and information from Trus Joist. Routed to Mike O. kmm
|
Routing - PUBLIC WORKS | 5/17/2002 | 5/17/2002 | 5/21/2002 | | FAIL |
|
|
|
Requires Drainage plan revision Plans sent back to plan review
|
Plan Review Completed(1st rev) | | | 5/17/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 5/15/2002 | | 5/17/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/7/2002 | | 5/15/2002 | | FAIL |
|
|
|
corrections faxed and mailed to architect
|
Plan resubmittals requested | | | 5/15/2002 | | DONE |
|
|
|
UBC Corrections
|
Routing - PLUMBING | 5/3/2002 | | 5/7/2002 | | CANC |
|
|
|
no review required for non medical, food service or non hazardous T.I..
|
Routing - PLANNING | 5/1/2002 | | 5/3/2002 | | PASS |
|
|
|
|
CHANGE STATUS TO (PND) | | | 5/3/2002 | | DONE |
|
|
|
I issued the wrong permit it should have been bld02-01013
|
Routing - PUBLIC WORKS | 4/30/2002 | | 5/1/2002 | | FAIL |
|
|
|
Requires drainage plan revision.
|
Routing - PLANNING Land Div | 4/29/2002 | | 4/30/2002 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 4/29/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/29/2002 | | DONE |
|
|
|
|
First Notice | 4/26/2002 | 4/26/2002 | 4/26/2002 | | DONE |
|
|
|
|
Application received | | | 4/26/2002 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/26/2002 | | DONE |
|
|
|
|