Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-01010
StatusFinaled
Name SANDMEYER TAMARA C
Site Address 3214 N ACRE LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Sandcastles Learning Center * Remodel of existing building including additions of 1088 sq. ft. on the first floor for classrooms and office space and 890 sq. ft. on the second floor used for storage. Includes HVAC, plumbing and electrical upgrades. All work is per approved plans, attachments and field inspection CUP02-00005 CVA02-00010
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/28/2011  
Permit Ready to Issue  8/31/2009 CANC
Case Summary (BLD)  8/31/2009 DONE
VOIDED CHANGE STATUS  8/31/2009 DONE
Wrong action highlighted.
CHANGE STATUS TO (FNL)  8/31/2009 DONE
Case Summary (BLD)  4/25/2008  
Permanent occupancy UNPAID FEE  10/23/2002 DONE
Perm Occ #9418 To Sandcastles learning Center
Permanent Occupancy 10/11/200210/11/2002 DONE
Details
BLD-Final10/10/200210/11/200210/11/2002APASS
DetailsTom Arcoraci
###-#### ok for perm occ 10/11/2002 12:07:21 PM
Code Occupancy Approval9/17/20029/16/20029/16/2002ADONE
DetailsCarol Montgomery
Meets approval with CU.
BLD-Final8/28/20028/29/20028/29/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/28/2002 at 16:13:32. Contact: ###-####. ok for temp cn issued for some handrails and missing door 8/29/2002 10:05:28 AM
FIRE-Final Inspection8/29/20028/29/20028/29/2002APASS
DetailsTroy Cobbley
Life/safety items OK but exterior door hardware needs to be changed to approved type and verified by structural inspector
Temporary occupancy  8/29/2002 DONE
Temp. occ. Cert. #4855 issued 8-29-02 to the Sandcastles Learning Center.
PubWorks Occupancy Approval8/28/20028/28/20028/28/2002 DONE
Project complete, signed Permanent Occupancy 08/27/02. R.Rokovitz
BLD-Framing/Rough-in7/17/20027/18/20027/18/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/17/2002 at 19:23:18. Contact: ###-####.
BLD-Framing/Rough-in7/16/20027/17/20027/17/2002AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/16/2002 at 08:43:38. Contact: ###-####. CN POSTED 7/17/2002 11:08:33 AM
BLD-Framing/Rough-in7/16/20027/16/20027/16/2002PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/16/2002 at 08:39:25. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/16/2002 at 08:42:09.
BLD-Framing/Rough-in7/8/20027/9/20027/9/2002ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/08/2002 at 11:43:40. Contact: ###-####.went over framing beams and old hand stack all looks ok 7/9/2002 11:20:14 AM
BLD-Foundation6/13/20026/13/20026/13/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/13/2002 at 06:29:18. Contact: ###-####.
BLD-Footing6/11/20026/12/20026/12/2002APASS
DetailsTom Arcoraci
###-#### chuck
PLANS/APPL TAKEN TO FRONT DESK  6/10/2002 DONE
Inspection Record Card- Bld  6/10/2002  
Print Occupancy Form  6/10/2002  
Telephone call  6/10/2002 DONE
talked to steve to verify plans are ready
Issue PAID IN FULL permit  6/10/2002 DONE
Routing - PLAN CHECK5/31/2002 6/10/2002 PASS
Plan assigned to (MLO)4/29/2002 6/10/2002 PASS
DetailsMike Otto
6/10/2002 09:21:38 MLO - activity updated through activity BLDA022 from case BLD02-01010.
Meeting  6/7/2002 DONE
meeting in field with inspector T. Arcoraci and Mike Otto and owner Tami Sandymeyer to review roof framing. Owner will provide as built drawing of roof framing with truss drawings which are stamped and signed by the architect and or engineer for the single story portions of the building.
Plan resubmittals received  6/7/2002 DONE
sheets A3.0 and A5.0
Plan resubmittals received  6/5/2002 DONE
Received two copies of revised sheets, A2.0, A4.0, and calcs. Routed to Mike O. kmm
Routing - PUBLIC WORKS5/30/2002 5/31/2002 PASS
Routing - PLAN CHECK5/28/2002 5/29/2002 FAIL
met with architect went over corrections. MLO
Telephone call  5/28/2002 DONE
received call from owner for a foundation permit. Told owner that foundation permits only issued to new buildings and that the structural design for the project failed the review. MLO
Plan resubmittals received  5/24/2002 DONE
Received revised sheets T1.0, A3.0, A4.0, A5.0, A5.2, and one copy of cover letter, one copy of response letter and information from Trus Joist. Routed to Mike O. kmm
Routing - PUBLIC WORKS5/17/20025/17/20025/21/2002 FAIL
Requires Drainage plan revision Plans sent back to plan review
Plan Review Completed(1st rev)  5/17/2002 FAIL
Routing - FIRE5/15/2002 5/17/2002 PASS
Routing - PLAN CHECK5/7/2002 5/15/2002 FAIL
corrections faxed and mailed to architect
Plan resubmittals requested  5/15/2002 DONE
UBC Corrections
Routing - PLUMBING5/3/2002 5/7/2002 CANC
no review required for non medical, food service or non hazardous T.I..
Routing - PLANNING5/1/2002 5/3/2002 PASS
CHANGE STATUS TO (PND)  5/3/2002 DONE
I issued the wrong permit it should have been bld02-01013
Routing - PUBLIC WORKS4/30/2002 5/1/2002 FAIL
Requires drainage plan revision.
Routing - PLANNING Land Div4/29/2002 4/30/2002 PASS
Plan routing begun/NEW & ADDTN  4/29/2002 DONE
Plans ACCEPTED BY PLAN TECH  4/29/2002 DONE
First Notice4/26/20024/26/20024/26/2002 DONE
Application received  4/26/2002 PASS
Recd Pcfee & Taken To Pln CK  4/26/2002 DONE