DOC - Permit Finaled | 6/16/2004 | 6/16/2004 | 6/16/2004 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 6/16/2004 12:14:46 PM
|
BLD-Conference | 6/9/2004 | 6/15/2004 | 6/15/2004 | P | PASS |
Tony Young
|
|
|
Ron or Jim, need to verify final letter for s. i.
letter recieved 6/16/2004 12:14:44 PM
|
BLD-Final | 6/9/2004 | 6/9/2004 | 6/9/2004 | P | PART |
Tony Young
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
all ok,, just need final letter from engineer on special inspections as per the permit states,, ok to move in if needed 6/9/2004 3:59:37 PM
|
BLD-Grading Inspection | 6/4/2004 | 6/4/2004 | 6/4/2004 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
BLD-Wall cover | 9/9/2003 | 9/10/2003 | 9/10/2003 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/9/2003 at 7:59:03 AM. Contact: ###-####.
energy code ok 9/10/2003 10:41:18 AM
|
BLD-Framing/Rough-in | 8/29/2003 | 9/4/2003 | 9/4/2003 | P | PASS |
Dave Hannah
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Marc Lileks 9/4/2003 8:41:02 PM
|
BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 1:33:22 PM. Contact: ###-####.
main room rafters ok to cover 8/7/2003 3:48:14 PM
|
BLD-Framing/Rough-in | 5/29/2003 | 5/30/2003 | 5/30/2003 | A | PART |
Tony Young
|
|
|
ron shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok to cover mech. room and garage fronts 5/30/2003 9:57:08 AM
|
BLD-Framing/Rough-in | 5/20/2003 | 5/22/2003 | 5/22/2003 | A | PART |
Tony Young
|
|
|
ron ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ext. shear ok 5/22/2003 11:59:26 AM
|
BLD-Framing/Rough-in | 5/2/2003 | 5/5/2003 | 5/5/2003 | A | PART |
Tony Young
|
|
|
ron shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
conf. only, nailing ok so far 5/5/2003 1:31:04 PM
|
BLD-Framing/Rough-in | 5/5/2003 | 5/5/2003 | 5/5/2003 | P | CANC |
Tony Young
|
|
|
ron ###-####,, shear
|
BLD-Grading Inspection | 3/26/2003 | 3/26/2003 | 3/26/2003 | | PASS |
Rita DeYoung
|
|
|
Received engineer's certification of the footing subgrade
|
BLD-Conference | 10/18/2002 | 10/21/2002 | 10/21/2002 | A | DONE |
Steven Webb
|
|
|
slab insul
|
BLD-Conference | 10/17/2002 | 10/18/2002 | 10/18/2002 | A | NR |
Carl Dependahl
|
|
|
energy code for foundation wall ###-#### call to meet there...recall when ready 10/18/02 2:43:19 PM
|
BLD-Footing | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | PART |
Tony Young
|
|
|
###-####
garage ftgs, ok 10/11/2002 11:03:07 AM
|
BLD-Foundation | 9/27/2002 | 9/30/2002 | 9/30/2002 | A | PART |
Dave Hannah
|
|
|
DONNY; Phone #: ###-#### Internet Inspection Request from: Darla Downs front section 9/30/2002 11:23:31 AM
|
BLD-Footing | 9/13/2002 | 9/16/2002 | 9/16/2002 | A | PART |
Tony Young
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wip on main floor ftgs, pending soil rpt 9/16/2002 10:28:26 AM
|
BLD-Foundation | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | PART |
Tony Young
|
|
|
donny ; Phone #: ###-####
basement wall and retaining wall, wip 8/13/2002 11:20:30 AM
|
BLD-Footing | 7/24/2002 | 7/25/2002 | 7/25/2002 | P | PART |
Tony Young
|
|
|
ft insp don ###-####
basement ftgs, ok pending s. i. report 7/25/2002 3:19:30 PM
|
BLD-Footing | 7/16/2002 | 7/17/2002 | 7/17/2002 | A | PART |
Dave Hannah
|
|
|
donnie ; Phone #: ###-#### lower ftg between piers 7/17/2002 11:09:04 AM
|
BLD-Grading Inspection | 7/17/2002 | 7/17/2002 | 7/17/2002 | | PASS |
Rita DeYoung
|
|
|
Subgrade for two piers at rear of house has been approved by the geotechnical engineer.
|
BLD-Footing | 7/10/2002 | 7/15/2002 | 7/15/2002 | A | PART |
Tony Young
|
|
|
donny- ###-#### ft
2 cololms at rear,, mti soil eng. on site and s.i. onsite for steel and concrete,,, all pending report 7/15/2002 11:25:59 AM
|
BLD-Footing | 7/9/2002 | 7/12/2002 | 7/10/2002 | A | CANC |
Tony Young
|
|
|
###-####--cancel per donny
|
BLD-Footing | 7/9/2002 | 7/11/2002 | 7/10/2002 | A | CANC |
Tony Young
|
|
|
###-####---cancel per donny
|
Issue PAID IN FULL permit | | | 6/20/2002 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 6/6/2002 | 6/6/2002 | 6/7/2002 | | PASS |
Dan Overy
|
|
|
6/7/2002 10:38:17 DJO - activity updated through activity BLDA022 from case BLD02-01026.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/7/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 6/7/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/7/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Inspection Record Card- Bld | | | 6/7/2002 | | |
|
|
|
|
Print Occupancy Form | | | 6/7/2002 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/6/2002 | | |
|
|
|
|
Routing - FIRE | 5/17/2002 | | 5/20/2002 | | DONE |
|
|
|
Automatic fire sprinklers are required. System shall be designed to NFPA 13D plus dry sidewall sprinklers installed in the garage along the wall (or floor) common to the garage and the heated space, spaced according to the sprinkler listing requirements.
|
Routing - PLANNING | 5/7/2002 | | 5/17/2002 | | PASS |
|
|
|
|
Telephone call | | | 5/8/2002 | | DONE |
|
|
|
Talked to Mark Wilson (architect) about projection in rear setback. Faxed copy of plat and copies of two ordinance sections.
|
Telephone call | | | 5/8/2002 | | DONE |
|
|
|
Talked to Jim Glancey (architect) about encroachment into rear setback.
|
Routing - PLANNING | 5/1/2002 | | 5/7/2002 | | FAIL |
|
|
|
Deck and eves are encroaching in rear setback. Called and talked to Mrs. DeBlasio. Mr DeBlasio is out of town this week. She said I could call the architect.
|
Routing - PUBLIC WORKS | 5/1/2002 | | 5/1/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 4/30/2002 | | 5/1/2002 | | PASS |
Rita DeYoung
|
|
|
Approved as category 3 with conditions of apporoval in letter attached to plans.
|
Application received | | | 4/30/2002 | | |
|
|
|
|
Pending Assignment by DJO | 4/30/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 5/20/2002 | | | | |
|
|
|
|