Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-01037
StatusFinaled
Name FRONTIER AIRLINES (TICKET COUNTER)
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(FRONTIER AIRLINES - TICKET COUNTER) This building is fire sprinklered for building area increase. To remodel a 1,039 square foot area within the existing Boise Air Terminal for a new tenant. This space is located on the first floor near the West end of the Ticket Lobby. The restrooms at this location are being demolished to make room for this tenant. Work is to include interior nonbearing walls, steel headers and trimmers at 3 new wall openings, mill work, interior finishes, and a 1-hr occupancy separation including a 1-hr roll down door all per approved drawings, engineering, and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes5/1/20025/1/20028/16/2002 DONE
done
Permanent occupancy UNPAID FEE  8/15/2002 DONE
Perm. Occ. Cert. #9297 issued 8-15-02 to Frontier Airlines.
Permanent Occupancy 7/19/20027/19/2002 DONE
Details
BLD-Final6/21/20026/21/20026/21/2002PPART
DetailsJim Storey
###-#### tom ###-#### tom fire shudder test ok.n/r for final resch. 6/21/2002 3:53:14 PM
FIRE-Final Inspection6/21/20026/21/20026/21/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 6/21/2002 4:12:27 PM
   6/21/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to plan modifications in process involving future work.
CCD 008 Plan Modification includes:
1. Space added:
a. 3,215 S.F. first floor
b. 4,161 S.F. second floor
c. 1,533 S.F. third floor
d. basement
2. Security checkpoint has been rearranged to increase number of check points.
3. Relocation of restrooms
4. Meeter/greeter lobby was added at the second floor adjacent to security checkpoint as a holding area for people waiting for passengers.
5. Rental car lobby at the first floor was expanded in the area
below the meeter/greeter lobby on the second floor.
6. A third floor mech. room was added to support the additional building area.
CCD 011 Plan Modification includes:
1. Modifications to current basement layout (under to accomodate airport storage needs & additional space needs for airport police force.
(any questions contact John Menard at ###-####)

(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
BLD-Framing/Rough-in6/12/20026/13/20026/13/2002PPASS
DetailsJim Storey
larry ###-#### fr
Override - Parcel Holds  6/12/2002  
BLD-Framing/Rough-in6/10/20026/10/20026/10/2002PPART
DetailsJim Storey
TOM ###-#### strucral steel at massonary openings wip ok. 6/10/2002 5:04:17 PM
Override - Parcel Holds  6/10/2002  
BLD-Other6/4/20026/4/20026/4/2002APASS
DetailsBill VanDegrift
Added by Inspector: 330 On 6/4/2002 11:31:06 AM plumbing demo ok
Override - Parcel Holds  5/24/2002  
Issue & PRINT to be Invoiced  5/24/2002  
(F) Reprint permit  5/24/2002  
Routing - PLAN CHECK5/22/2002 5/23/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/23/2002 PASS
Override - Parcel Holds  5/23/2002  
Inspection Record Card- Bld  5/23/2002 DONE
Print Occupancy Form  5/23/2002 DONE
Telephone call  5/23/2002 DONE
CALLED LEFT V - MESSAGE FOR DUANE PERMIT READY 5-23-02 ///DLD
Plan assigned to (CJW)5/2/2002 5/23/2002 PASS
DetailsCarl Westfall
5/23/2002 14:32:19 CJW - activity updated through activity BLDA022 from case BLD02-01037.
Routing - FIRE5/20/2002 5/22/2002 PASS
Plan Review Completed(1st rev)  5/22/2002 PASS
Plan resubmittals received  5/22/2002 DONE
Received two sets of resubmittal sheet S101 of 1 with Structural Calculations and cover letter. Routed to Carl Westfall.
Routing - PLAN CHECK5/7/2002 5/20/2002  
Failed first UBC review. UBC plan review started May 17, 2002 and finished May 20, 2002. A response from the architect was required. See the conditions list.
Routing - PUBLIC WORKS5/2/2002 5/6/2002 PASS
CHANGE STATUS TO (PND)  5/1/2002 DONE
Plans ACCEPTED BY PLAN TECH  5/1/2002 DONE
Application received  5/1/2002  
Override - Parcel Holds  5/1/2002  
Recd Pcfee & Taken To Pln CK  5/1/2002 DONE