Permanent occupancy UNPAID FEE | | | 11/18/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9446 issued 11-18-02 to Clovis Dental.
|
Permanent Occupancy | | 11/15/2002 | 11/15/2002 | | DONE |
|
|
|
|
BLD-Final | 11/15/2002 | 11/15/2002 | 11/15/2002 | P | PASS |
Jim Sly
|
|
|
gregg--sign off card on n entrance taped to window-call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Perm Occ. :) 11/15/2002 4:23:43 PM
|
FIRE-Final Inspection | 11/11/2002 | 11/13/2002 | 11/13/2002 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled 11/13/2002 1:17:50 PM
|
BLD-Conference | 11/11/2002 | 11/13/2002 | 11/13/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/11/2002 at 16:48:02. Contact: ###-####.
|
FIRE-Final Inspection | 11/8/2002 | 11/12/2002 | 11/11/2002 | A | CANC |
Troy Cobbley
|
|
|
greg-re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Disp set to [CANC] by a contractor via Hello! on 11/11/2002 at 16:45:31.
|
BLD-Conference | 11/8/2002 | 11/12/2002 | 11/11/2002 | A | CANC |
Jim Sly
|
|
|
greg-re-insp--call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Disp set to [CANC] by a contractor via Hello! on 11/11/2002 at 16:46:04.
|
BLD-Conference | 11/1/2002 | 11/4/2002 | 11/4/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 15:25:28. Contact: ###-####.
|
PubWorks Occupancy Approval | 11/4/2002 | 11/4/2002 | 11/4/2002 | | DONE |
|
|
|
Drainage project complete, signed Permanent Occupancy 11/4/02. R.Rokovitz
|
FIRE-Final Inspection | 10/31/2002 | 11/1/2002 | 11/1/2002 | A | FAIL |
Troy Cobbley
|
|
|
remove keyed hardware from the inner set of exit doors, provide ADA hardware on the slider doors and provide automatic shutdown for the hvac units 11/1/2002 2:20:38 PM
|
BLD-Final | 10/31/2002 | 11/1/2002 | 11/1/2002 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/31/2002 at 09:04:35. Contact: ###-####. Need all trade finals. 11/1/2002 10:02:25 AM
|
Inspection Record Card- Bld | | | 10/29/2002 | | |
|
|
|
|
Print Occupancy Form | | | 10/29/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/29/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/29/2002 | | DONE |
|
|
|
|
BLD-Wall cover | 10/21/2002 | 10/23/2002 | 10/23/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 17:51:53. Contact: ###-####. ceiling gred and lights ok to drop in panels 10/23/2002 9:59:44 AM
|
BLD-Framing/Rough-in | 10/11/2002 | 10/14/2002 | 10/14/2002 | A | FAIL |
Dave Hannah
|
|
|
###-#### suspended ceiling missing wire hanger around edges also draft stop needs to come all the down to ceiling 10/14/2002 11:14:00 AM
|
BLD-Framing/Rough-in | 8/27/2002 | 8/27/2002 | 8/27/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 10:13:49. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/22/2002 | 8/23/2002 | 8/23/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 15:44:31. Contact: ###-####. c/n on site ok to insulate 8/23/2002 4:43:17 PM
|
BLD-Foundation | 7/2/2002 | 7/3/2002 | 7/3/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by Inspector: 408 On 7/2/2002 3:41:31 PM cal ###-####
|
BLD-Foundation | 7/3/2002 | 7/3/2002 | 7/3/2002 | P | PART |
Jim Sly
|
|
|
Substantial completion of walls....(crawl). 7/4/2002 3:16:40 AM
|
BLD-Foundation | 7/2/2002 | 7/2/2002 | 7/2/2002 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/02/2002 at 05:08:18. Contact: .
|
BLD-Foundation | 7/2/2002 | 7/2/2002 | 7/2/2002 | P | NR |
Tom Arcoraci
|
|
|
|
BLD-Footing | 7/1/2002 | 7/1/2002 | 7/1/2002 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 06:00:09. Contact: ###-####.
|
BLD-Footing | 6/27/2002 | 7/1/2002 | 7/1/2002 | P | PASS |
Dave Hannah
|
|
|
CAL ###-####
|
(F) Reprint permit | | | 6/28/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/27/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/12/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/12/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2002 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 5/6/2002 | | 6/12/2002 | | PASS |
Mike Otto
|
|
|
6/12/2002 14:12:03 MLO - activity updated through activity BLDA022 from case BLD02-01055.
|
Routing - FIRE | 6/10/2002 | | 6/11/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/6/2002 | | 6/10/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/6/2002 | | DONE |
|
|
|
recieved sheets A2, A3 DR-1
|
Routing - FIRE | 5/28/2002 | | 5/30/2002 | | FAIL |
|
|
|
mediccal gases?
|
Plan Review Completed(1st rev) | | | 5/30/2002 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 5/28/2002 | | DONE |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 5/21/2002 | | 5/28/2002 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 5/16/2002 | | 5/21/2002 | | PASS |
|
|
|
increase water service to 1 1/4" to match mech design, backwater valve may be required on vacuum pump drain, r.p.required on the building water service line.
|
Routing - PLANNING | 5/15/2002 | | 5/16/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/7/2002 | | 5/15/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 5/7/2002 | | 5/7/2002 | | PASS |
|
|
|
|
Pending Assignment by JCM | 5/3/2002 | | 5/6/2002 | | DONE |
John Menard
|
|
|
5/6/2002 08:51:12 JCM - activity updated through activity BLDA174 from case BLD02-01055.
|
Plans ACCEPTED BY PLAN TECH | | | 5/3/2002 | | DONE |
|
|
|
|
First Notice | 5/2/2002 | 5/2/2002 | 5/2/2002 | | DONE |
|
|
|
|
Application received | | | 5/2/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/2/2002 | | DONE |
|
|
|
|