Permit Information
Permit NumberBLD02-01061
StatusFinaled
Name PENTALON CONSTRUCTION, INC.
Site Address 8553 W FAIRVIEW
Project NameASPEN SPRINGS APARTMENTS
Customer Number 
ePlanReviewNo
Description
(Building #10 Type D Section 1) * A two hour area separation wall will be constructed to divide this building into two separate buildings. * To construct a new 12,270 sq.ft. two story with a basement, 12 unit apartment building. The basement is approximately 4,228 sq.ft. and the first and second floor are approximately 4,021 sq.ft each. All construction is per the approved plans and attached comment list. Work to include on site landscaping and parking lot. Refer to BLD 02-02711 for other side of area separation wall.MJP DRH02-00005 CUP01-00164 PC#274-02
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes5/2/20025/2/20028/10/2004 DONE
First Notice 4/2/20044/2/2004 DONE
Permanent occupancy  4/2/2004 DONE
Perm. Occ. Cert. # 10067 issued 4-2-04 to the Aspen Springs Apts., Bldg. #10, Sec. 1.
Permanent Occupancy 4/1/20044/1/2004 DONE
Details
Permanent Occupancy 4/1/20044/1/2004 DONE
Details
BLD-Final4/1/20044/1/20044/1/2004PPASS
DetailsJim Sly
chris; Phone #: ###-#### Internet Inspection Request from: Darla Downs OK for Perm Occ. :) 4/1/2004 5:40:09 PM
Code Occupancy Approval  4/1/2004 PASS
FINAL SIGNED OFF
FIRE-Alarm Testing2/9/20042/10/20042/10/2004APASS
DetailsTroy Cobbley
fire life safety and fire alarm finaled 2/10/2004 12:36:55 PM
FIRE-Alarm Testing2/5/20042/5/20042/5/2004PCANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 2/5/2004 at 9:40:54 AM. Contact: ###-####.
BLD-Final1/20/20041/20/20041/20/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 1/20/2004 at 11:17:26 AM. Contact: ###-####. OK for Perm Occ. 1/20/2004 3:48:48 PM
BLD-Framing/Rough-in11/14/200311/14/200311/14/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/14/2003 at 10:00:22 AM. Contact: ###-####. 11/14/2003 2:50:55 PM
BLD-Energy code compliance11/13/200311/13/200311/13/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/13/2003 at 9:39:49 AM. Contact: ###-####.
BLD-Energy code compliance11/11/200311/12/200311/12/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/11/2003 at 8:39:31 AM. Contact: ###-####. selected units. 11/12/2003 11:21:31 AM
BLD-Framing/Rough-in11/10/200311/10/200311/10/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/10/2003 at 8:14:09 AM. Contact: ###-####.
BLD-Framing/Rough-in9/9/20039/10/20039/10/2003AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/9/2003 at 1:16:41 PM. Contact: ###-####. extend 2hr wall thru soffit to fascia. 9/10/2003 12:27:38 PM
BLD-Framing/Rough-in9/4/20039/4/20039/4/2003PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/4/2003 at 9:27:48 AM. Contact: ###-####. Need retro fit HDs at N wall. 9/4/2003 3:30:20 PM
BLD-Framing/Rough-in7/31/20038/1/20038/1/2003APART
DetailsRuss Owen
BLD-Framing/Rough-in7/30/20037/31/20037/31/2003ACANC
DetailsRuss Owen
out of time 7/31/2003 6:55:05 PM
Override - Parcel Holds  7/30/2003  
Inspection Record Card- Bld  4/16/2003  
Print Occupancy Form  4/16/2003  
Case Summary (BLD)  3/31/2003  
BLD-Foundation3/17/20033/19/20033/19/2003APART
DetailsRuss Owen
VINCENT; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing3/11/20033/12/20033/12/2003APART
DetailsRuss Owen
###-####
BLD-Aging Inspection3/11/20033/11/20033/11/2003 CANC
DetailsRuss Owen
work is in progress. 3/17/2003 9:42:28 AM
Issue PAID IN FULL permit  12/10/2002 DONE
Inspection Record Card- Bld  11/22/2002  
Print Occupancy Form  11/22/2002 DONE
Routing - PLAN CHECK11/14/2002 11/15/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/15/2002 DONE
Print Pending Permit.LaserJet4  11/15/2002 DONE
Case Summary (BLD)  11/15/2002 DONE
Plan assigned to (M_P)5/3/2002 11/15/2002 PASS
DetailsMike Phillips
11/15/2002 10:58:07 M_P - activity updated through activity BLDA022 from case BLD02-01061.
Routing - FIRE11/14/2002 11/14/2002 PASS
DetailsBill Alexander
Routing - FIRE11/6/2002 11/8/2002 FAIL
DetailsBill Alexander
Hydrant locations have problems with obstructions (carports, parking) and need updated due to FD access modifications. Water supply is questionable due to the location of certificate. Fire loop is found to be 4" and minimum allowed is 6".
Routing - PLAN CHECK10/23/2002 11/6/2002  
Routing to fire.
Plan resubmittals received  10/31/2002 DONE
Received three sets of resubmittal sheets CS1, A02, A03, A04, A05, A06, A08, A10, A33, with cover letter. Routed to Mike Phillips.
Routing - FIRE10/17/2002 10/22/2002 FAIL
DetailsBill Alexander
Lack response to items #2, #3 and #5 review dated 06/6/2002 and now 10/22/2002.Turn radius (access) problems with building #10.
Routing - PLAN CHECK10/3/2002 10/17/2002 PEND
10/17/02 * Waiting for others to approve prior to issuing permit.
Routing - PUBLIC WORKS10/4/2002 10/15/2002 PASS
Approved as change with fire department requirements.
Routing - PLANNING9/27/2002 10/3/2002 PASS
Approved per DRH02-5 and as noted on plans.
Routing - PLANNING Land Div9/25/2002 9/27/2002 PASS
Approved. ROS 2842. Parcel is 13.1 acres in size. Parcels over 5 acres are exempt from subdivision requirements.
Plan resubmittals received  9/24/2002 DONE
Received three copies of revised struct. calcs., sheets A03, A04, A05, A06, A08, A10, A12, A20, A21, A22, A23, A24, A25, A26, A27, P-1, M02, E02, L01. and five copies of revised sheets C-1.0, C-2.0, C-2.1, C-2.2, C-3.0, C-3.1, C-3.2, C-4.0, C-4.1, C-4.2, C-4.3, C-5.0, C-5.1, C-5.2, C-6.0. Had client put into plans. kmm
Routing Off Site - STRUCTURAL7/23/2002 7/30/2002 PASS
Contacted Pdq to take revised plans of 7/23/02 to outside eng. kmm
Plan resubmittals received  7/25/2002 DONE
Received comment letter by fax. Routed to Mike Phillips.
Routing - PLAN CHECK7/8/2002 7/25/2002  
Plan resubmittals received  7/23/2002 DONE
Received three copies of revised sheets A15, A16, A17, A18, A19, A20, A21, A22, A23, A24, A25, A26, A27, A28, A29, A30, A32, A34, M01, M02, M03, response letter and revised tructural calculations. Routed two copies to Mike P, and one copy to outside eng. kmm
Routing Off Site - STRUCTURAL6/27/2002 7/11/2002 FAIL
contacted PDQ to take revised plans or 6/27/02 to outside eng. kmm
Second review failed faxed comments to architect.
Plan resubmittals received  7/8/2002 DONE
Received two copies of resubmittal Sheet No. 1. Routed to Mike Phillips.
Routing - PLUMBING7/8/2002 7/8/2002 PASS
VENT ALL FIXTURES, COLD WATER BRANCH SERVING 2 BATH UNITS MUST BE 1".
Routing - PLAN CHECK6/26/2002 7/8/2002 FAIL
7/1/02 * Second review failed. Sent comments to architect requesting additional information for further review.
Plan resubmittals received  6/27/2002 DONE
Received three copies of structural calcs, sheets SO1, CS1, A01, A02, A03, A04, A05, A06, A08, A09, A10, A11, A15, A14, A17, A18, A21, A22, A25, A26, A31, A32, A33, A34, A35, A36, M01, M02, M03. Routed two copies to Mike P and one copy to outside eng. kmm
Routing - PUBLIC WORKS6/20/20026/18/20026/25/2002 PASS
Send to PW
Routing - PLAN CHECK6/17/2002 6/20/2002  
Routing - PUBLIC WORKS6/10/2002 6/17/2002 FAIL
Requires drainage plan revisions. Per Brian Murphy
Routing - PLAN CHECK6/6/2002 6/10/2002  
Routing - FIRE6/3/20026/6/20026/6/2002 FAIL
DetailsBill Alexander
Reference attached and faxed notes 06/06/2002.
Plan Review Completed(1st rev)  6/6/2002 DONE
Routing - PLUMBING6/3/2002 6/3/2002 FAIL
see bld02-01060
Routing - PLAN CHECK6/3/2002 6/3/2002  
Routing to fire
Plan resubmittals received  5/31/2002 DONE
Received two sets of resubmittal sheets C-1.0, C-2.0, C-2.1, C-2.2, C-3.0, C-3.1, C-3.2, C-4.0, C-4.1, C-4.2, C-4.3, C-5.0, C-5.1, C-5.2, C-6.0. Routed to Mike Phillips.
Routing - PLANNING5/24/2002 5/31/2002 FAIL
Approved as per CUP01-00164 (Dave Abo).
Plans do not comply with Design Review, DRH02-00005; please note conditions 1d, 1e and 2 (Martin Santoyo).
Routing - PLAN CHECK5/20/2002 5/24/2002 FAIL
Plan review completed, sent correction report to architect requesting additional information for further review prior to issuing permit.
Routing - PUBLIC WORKS5/10/2002 5/20/2002 FAIL
Requires revisions per Brian M. kmm
Routing Off Site - STRUCTURAL5/9/2002 5/15/2002 FAIL
contacted pdq to take plans to outside eng. kmm
Additional review required by outside engineering firm .
Routing - PLANNING Land Div5/9/2002 5/10/2002 FAIL
requested deed/legal decription
Plans ACCEPTED BY PLAN TECH  5/9/2002 DONE
Plan routing begun/NEW & ADDTN  5/9/2002 DONE
Plans ACCEPTED BY PLAN TECH  5/3/2002 PEND
Requires stamped and signed structural sheets. Contacted Scott McDonald of this need. kmm
Application received  5/2/2002  
Recd Pcfee & Taken To Pln CK  5/2/2002 DONE
Routing - PLAN CHECK11/12/2002