Permit Information
Permit NumberBLD02-01069
StatusFinaled
Name PENTALON CONSTRUCTION, INC.
Site Address 8521 W FAIRVIEW
Project NameASPEN SPRINGS APARTMENTS
Customer Number 
ePlanReviewNo
Description
Building 2 Type B Section 1) * A two hour area separation wall will be constructed to divide this building into two separate buildings. * To construct a new 10,132 sq.ft. two story with a basement, 12 unit apartment building. The basement is approximately 3,516 sq.ft. and the first and second floor are approximately 3,308 sq.ft each. All construction is per the approved plans and attached comment list. Work to include on site landscaping and parking lot. Refer to BLD 02-02719 for other side of area separation wall. MJPDRH02-00005 CUP01-00164 PC#282-02
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes5/2/20025/2/20028/10/2004 DONE
First Notice 1/23/20041/23/2004 DONE
Permanent Occupancy 12/2/200312/2/2003 DONE
Details
BLD-Final12/2/200312/2/200312/2/2003 DONE
final ok for perm. occ./Jim
Permanent occupancy  12/2/2003 DONE
Perm. Occ. Cert. # 9891 issued 12-2-03 to the Aspen Springs Apts.
BLD-Final10/16/200310/16/200310/16/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/16/2003 at 9:25:38 AM. Contact: ###-####. C/N Need Perm Occ from Fire.....Struct OK after that. OK for Temp Occ. 10/16/2003 1:36:10 PM
Temporary occupancy  10/16/2003 DONE
Temp. Occ. Cert. #5012 issued 10-16-03 to the Aspen Springs Apartments.
BLD-Final10/13/200310/13/200310/13/2003PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/13/2003 at 9:30:53 AM. Contact: ###-####.
FIRE-Final Inspection10/10/200310/10/200310/10/2003PPART
DetailsTroy Cobbley
Temp occupancy given until the NAC panel for the fire alarm system can be replaced
FIRE-Final Inspection10/8/200310/8/200310/8/2003PFAIL
DetailsTroy Cobbley
Life safety is ok but need to final fire alarm 10/8/2003 3:34:45 PM
FIRE-Final Inspection10/6/200310/6/200310/6/2003PFAIL
DetailsTroy Cobbley
no fire extinguishers installed, door hinges not adjusted, smoke detectors not tested 10/6/2003 3:28:23 PM
BLD-Framing/Rough-in8/1/20038/4/20038/4/2003APART
DetailsRuss Owen
vincent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. gyp crete ok. 8/6/2003 12:48:59 PM gyp crete ok. 8/6/2003 12:49:09 PM
BLD-Framing/Rough-in7/11/20037/11/20037/11/2003PPASS
DetailsRuss Owen
ok to drywall. 7/11/2003 3:44:31 PM
BLD-Energy code compliance7/10/20037/10/20037/10/2003PPART
DetailsRuss Owen
VINCENT ###-#### VINCENT ###-#### Posetd c/ for fire wall continuity plans lack adequate detailing and I have went over areas with contractor trhat I have now found. Note: most problems on this job are due to inadequate plans. 7/10/2003 6:02:29 PM
Override - Parcel Holds  7/10/2003  
BLD-Framing/Rough-in7/8/20037/8/20037/8/2003PPART
DetailsRuss Owen
###-####Ok to insulate only prior c/n neededs to be addressed which is on site at trailer. 7/9/2003 12:14:44 PM
Override - Parcel Holds  7/8/2003  
BLD-Framing/Rough-in7/3/20037/7/20037/7/2003PFAIL
DetailsRuss Owen
###-#### vincent###-#### vincent, same c/n items to correct. 7/7/2003 6:09:37 PM###-#### vincent, same c/n items to correct. 7/7/2003 6:09:50 PM
BLD-Framing/Rough-in7/3/20037/3/20037/3/2003PFAIL
DetailsRuss Owen
###-#### vincent fire caulking###-#### vincent, fire stoping shear nailing needs to be completed. 7/7/2003 11:44:56 AM
Override - Parcel Holds  7/3/2003  
Override - Parcel Holds  7/3/2003  
BLD-Framing/Rough-in7/2/20037/2/20037/2/2003PFAIL
DetailsRuss Owen
###-#### vincent fire caulking 7/2/2003 5:44:29 PM, went over areas with contractor marked with paint. 7/2/2003 5:45:54 PM
Override - Parcel Holds  7/2/2003  
BLD-Footing7/1/20037/1/20037/1/2003APART
DetailsRuss Owen
. 7/1/2003 11:38:09 AMpartial not complete,went over flue pipes thru floor, and other fire stoping and framing. 7/1/2003 5:23:20 PM 7/1/2003 5:24:01 PM
BLD-Conference6/30/20036/30/20037/1/2003PPASS
DetailsCarl Dependahl
w/ Vince...will notify if owner wants to meet re bearing columns, 1hr const... 7/1/2003 10:34:08 AM
BLD-Framing/Rough-in6/27/20036/30/20036/30/2003PCANC
DetailsRuss Owen
###-#### vincent ###-#### vincent . ou###-#### vincent . oit of time due to brt of time due to bomb threat at city hall.7/1/2003 11:38:58 AM omp 7/1/2003 11:39:01 AM 7/1/2003 11:39:29 AM
BLD-Framing/Rough-in6/26/20036/27/20036/27/2003ANR
DetailsRuss Owen
###-#### vincent
BLD-Framing/Rough-in6/27/20036/27/20036/27/2003PFAIL
DetailsRuss Owen
went over c/n items. 6/27/2003 5:19:29 PM
Override - Parcel Holds  6/27/2003  
Override - Parcel Holds  6/26/2003  
BLD-Framing/Rough-in6/24/20036/25/20036/25/2003PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 6/24/2003 at 6:06:19 PM. Contact: ###-####.Scheduled by a contractor via Hello! on 6/24/2003 at 6:01:45 PM. Contact: ###-####.this needs addnl work completed went over some items with contractor. 6/25/2003 5:21:10 PMScheduled by a contractor via Hello! on 6/24/2003 at 6:01:45 PM. Contact: ###-####.this needs addnl work completed went over some items with contractor. 6/25/2003 5:21:24 PM
Inspection Record Card- Bld  4/16/2003 DONE
Print Occupancy Form  4/16/2003  
BLD-Aging Inspection3/17/20033/17/20033/17/2003 CANC
DetailsRuss Owen
still working 3/17/2003 9:37:17 AM
Issue PAID IN FULL permit  12/10/2002 DONE
Inspection Record Card- Bld  11/22/2002 DONE
Print Occupancy Form  11/22/2002 DONE
Routing - PLAN CHECK11/14/2002 11/15/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/15/2002 DONE
Print Pending Permit.LaserJet4  11/15/2002 DONE
Case Summary (BLD)  11/15/2002 DONE
Plan assigned to (M_P)5/6/2002 11/15/2002 PASS
DetailsMike Phillips
11/15/2002 13:18:24 M_P - activity updated through activity BLDA022 from case BLD02-01069.
Routing - FIRE11/14/2002 11/14/2002 PASS
DetailsBill Alexander
Routing - FIRE11/6/2002 11/8/2002 FAIL
DetailsBill Alexander
Hydrant locations have problems with obstructions (carports, parking) and need updated due to FD access modifications. Water supply is questionable due to the location of certificate. Fire loop is found to be 4" and minimum allowed is 6".
Routing - PLAN CHECK10/23/2002 11/6/2002 PEND
Routing to fire.
Plan resubmittals received  10/31/2002 DONE
Received three sets of resubmittal sheets CS1, A02, A03, A04, A05, A06, A08, A10, A33, with cover letter. Routed to Mike Phillips.
Plan resubmittals received  10/25/2002 DONE
Received two copies of revised sheets C2.0, C2.1, C2.2, C3.1 and C3.2. Routed to Mike P. kmm
Routing - FIRE10/17/2002 10/22/2002 FAIL
DetailsBill Alexander
Lack response to items #2, #3 and #5 review dated 06/6/2002 and now 10/22/2002. Turn radius (access) problems with building #2 and #3.
Routing - PLAN CHECK10/3/2002 10/17/2002 PEND

10/17/02 * Waiting for others to approve prior to issuing permit.
Routing - PUBLIC WORKS10/4/2002 10/15/2002 PASS
Approved as change with fire department requirements.
Routing - PLANNING9/27/2002 10/3/2002 PASS
Approved per DRH02-5 and as noted on plans.
Routing - PLANNING Land Div9/25/2002 9/27/2002 PASS
Approved. ROS 2842. Parcel is 13.1 acres in size. Parcels over 5 acres are exempt from subdivision requirements.
Plan resubmittals received  9/24/2002 DONE
Received three copies of revised struct. calcs., sheets A03, A04, A05, A06, A08, A10, A12, A20, A21, A22, A23, A24, A25, A26, A27, P-1, M02, E02, L01. and five copies of revised sheets C-1.0, C-2.0, C-2.1, C-2.2, C-3.0, C-3.1, C-3.2, C-4.0, C-4.1, C-4.2, C-4.3, C-5.0, C-5.1, C-5.2, C-6.0. Had client put into plans. kmm
Routing Off Site - STRUCTURAL7/23/2002 7/30/2002 PASS
contacted pdq to take revised plans of 7.23.02 to outside eng. kmm
Plan resubmittals received  7/25/2002 DONE
Received comment letter by fax. Routed to Mike Phillips.
Routing - PLAN CHECK7/8/2002 7/25/2002  
Plan resubmittals received  7/23/2002 DONE
Received three copies of revised sheets A15, A16, A17, A18, A19, A20, A21, A22, A23, A24, A25, A26, A27, A28, A29, A30, A32, A34, M01, M02, M03, response letter and revised tructural calculations. Routed two copies to Mike P, and one copy to outside eng. kmm
Routing Off Site - STRUCTURAL6/27/2002 7/11/2002 FAIL
contacted pdq to take revised plans of 6.27.02 to outside eng. kmm
Second review failed faxed comments to architect.
Plan resubmittals received  7/8/2002 DONE
Received two copies of resubmittal Sheet No. 1. Routed to Mike Phillips.
Routing - PLUMBING7/8/2002 7/8/2002 PASS
VENT ALL FIXTURES, COLD WATER BRANCH SERVING 2 BATH UNITS MUST BE 1".
Routing - PLAN CHECK6/26/2002 7/8/2002 FAIL
7/1/02 * Second review failed. Sent comments to architect requesting additional information for further review.
Plan resubmittals received  6/27/2002 DONE
Received three copies of structural calcs, sheets SO1, CS1, A01, A02, A03, A04, A05, A06, A08, A09, A10, A11, A15, A14, A17, A18, A21, A22, A25, A26, A31, A32, A33, A34, A35, A36, M01, M02, M03. Routed two copies to Mike P and one copy to outside eng. kmm
Routing - PUBLIC WORKS6/20/2002 6/26/2002 PASS
Routing - PLAN CHECK6/17/2002 6/20/2002  
Routing - PUBLIC WORKS6/10/2002 6/17/2002 FAIL
Requires drainage plan revisions. Per Brian Murphy
Routing - PLAN CHECK6/6/2002 6/10/2002  
Routing - FIRE6/3/20026/6/20026/6/2002 FAIL
DetailsBill Alexander
Reference attached and faxed notes 06/06/2002.
Routing - PLUMBING6/3/2002 6/3/2002 FAIL
see bld02-01060
Routing - PLAN CHECK6/3/2002 6/3/2002  
Routing to fire.
Plan resubmittals received  5/31/2002 DONE
Received two sets of resubmittal sheets C-1.0, C-2.0, C-2.1, C-2.2, C-3.0, C-3.1, C-3.2, C-4.0, C-4.1, C-4.2, C-4.3, C-5.0, C-5.1, C-5.2, C-6.0. Routed to Mike Phillips.
Routing - PLANNING5/24/2002 5/31/2002 FAIL
Approved as per CUP01-00164 (Dave Abo).
Plans do not comply with Design Review, DRH02-00005; please note conditions 1d, 1e and 2 (Martin Santoyo).
Routing - PLAN CHECK5/20/2002 5/24/2002 FAIL
PLan review completed, sent correction report to architect requesting additional information to be submitted for further review prior to issuing permit.
Routing - PUBLIC WORKS5/10/2002 5/20/2002 FAIL
Requires revisions per Brian M. KMM
Routing Off Site - STRUCTURAL5/9/2002 5/15/2002 FAIL
contacted pdq to take plans to outside eng. kmm
Additional review required by outside engineering firm .
Routing - PLANNING Land Div5/9/2002 5/10/2002 FAIL
requested deed
Plans ACCEPTED BY PLAN TECH  5/9/2002  
Plan routing begun/NEW & ADDTN  5/9/2002 DONE
Plans ACCEPTED BY PLAN TECH  5/6/2002 PEND
Requires stamped and signed structural sheets. Contacted Scott McDonald of this need. kmm
Application received  5/2/2002  
Recd Pcfee & Taken To Pln CK  5/2/2002 DONE
Routing - PLAN CHECK11/12/2002