Permit Information
Permit NumberBLD02-01072
StatusFinaled
Name PENTALON CONSTRUCTION, INC.
Site Address 8565 W FAIRVIEW
Project NameASPEN SPRINGS APARTMENTS
Customer Number 
ePlanReviewNo
Description
Building 13 Type C Section 1) * A two hour area separation wall will be constructed to divide this building into two separate buildings. * To construct a new 12,270 sq.ft. two story with a basement, 12 unit apartment building. The basement is approximately 4,228 sq.ft. and the first and second floor are approximately 4,021 sq.ft each. All construction is per the approved plans and attached comment list. Work to include on site landscaping and parking lot. Refer to BLD 02-02718 for other side of area separation wall. MJP DRH02-00005 CUP01-00164 PC#285-02
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/14/20066/14/20066/14/2006 DONE
Second Notice has not been responded to.
Second Notice BLD4/14/20064/14/20066/14/2006 DONE
First Notice has not been responded to.
First Notice3/23/20063/23/20064/14/2006 DONE
DetailsMike Jordan
BLD-Aging Inspection3/23/20063/23/20063/23/2006 CANC
DetailsMike Jordan
DOC - Permit Finaled3/23/20063/23/20063/23/2006APASS
DetailsMike Jordan
All inspections have been passed as noted in hostory.
Permanent Occupancy 10/24/200310/24/2003 DONE
Details
BLD-Final10/24/200310/24/200310/24/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/24/2003 at 7:27:08 AM. Contact: ###-####. OK for Perm Occ. :) 10/24/2003 1:47:32 PM 10/24/2003 1:47:52 PM
Code Occupancy Approval10/24/200310/23/200310/23/2003PPASS
DetailsScott M.Brown
FINAL SIGNED OFF 10/24/2003 1:00:02 PM
FIRE-Final Inspection10/23/200310/23/200310/23/2003PPASS
DetailsTroy Cobbley
fire life safety finaled, fire alarm finaled 10/23/2003 3:18:25 PM
BLD-Framing/Rough-in8/13/20038/13/20038/13/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/13/2003 at 7:43:38 AM. Contact: ###-####. framing ok. 8/15/2003 1:05:44 PM
BLD-Framing/Rough-in8/12/20038/12/20038/12/2003PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/12/2003 at 7:53:41 AM. Contact: ###-####.out of time. 8/12/2003 5:41:58 PM
BLD-Framing/Rough-in8/11/20038/11/20038/11/2003PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/11/2003 at 9:59:07 AM.
BLD-Other8/7/20038/8/20038/8/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/7/2003 at 3:49:51 PM. Contact: ###-####.ok except 1 unit at south west side .will recall. 8/12/2003 10:25:10 AM
BLD-Framing/Rough-in8/7/20038/8/20038/8/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/7/2003 at 3:50:19 PM. Contact: ###-####.ok all except 1 unit will recall as joist needed repair. 8/12/2003 10:23:21 AM
BLD-Framing/Rough-in8/5/20038/6/20038/6/2003PPART
DetailsRuss Owen
chris; Phone #: ###-#### Internet Inspection Request from: Darla Downschris; Phone #: ###-#### Internet Inspection Request from: Darla Downs floor joist and top of a chase. 8/7/2003 1:46:24 PMchris; Phone #: ###-#### Internet Inspection Request from: Darla Downs floor joist and top of a chase. 8/7/2003 1:46:34 PM
BLD-Framing/Rough-in8/1/20038/4/20038/4/2003ANR
DetailsCarl Dependahl
vincent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...will call for 407 8/4/2003 5:09:15 PM
BLD-Framing/Rough-in8/4/20038/4/20038/4/2003PFAIL
DetailsRuss Owen
need prior c/n complete 8/6/2003 12:50:37 PM
BLD-Framing/Rough-in7/16/20037/17/20037/17/2003PFAIL
DetailsRuss Owen
morgan ###-#### fire caulking , Cut floor joist under tubs, holes under tub need fire caulk,4x4 paralam beams shown on 1st and second floor levels, not in place need architect ok for as built, mis fire caulking and drywall modifications walked with contractor wrote some notes on doors at the units. no c/n to many units. 24 total. 7/18/2003 12:15:58 PMmorgan ###-#### fire caulking , Cut floor joist under tubs, holes under tub need fire caulk,4x4 paralam beams shown on 1st and second floor levels, not in place need architect ok for as built, mis fire caulking and drywall modifications walked with contractor wrote some notes on doors at the units. no c/n to many units. 24 total. 7/18/2003 12:16:12 PM
BLD-Framing/Rough-in7/14/20037/16/20037/16/2003PFAIL
DetailsRuss Owen
###-#### vincent
Override - Parcel Holds  7/16/2003  
Override - Parcel Holds  7/14/2003  
Inspection Record Card- Bld  4/16/2003  
Print Occupancy Form  4/16/2003  
BLD-Aging Inspection3/20/20033/20/20033/20/2003 CANC
DetailsRuss Owen
work is in progress 3/20/2003 10:12:37 AM
(F) Reprint permit  12/11/2002  
Issue PAID IN FULL permit  12/10/2002  
Inspection Record Card- Bld  11/22/2002 DONE
Print Occupancy Form  11/22/2002 DONE
Routing - PLAN CHECK11/14/2002 11/15/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/15/2002 DONE
Print Pending Permit.LaserJet4  11/15/2002 DONE
Case Summary (BLD)  11/15/2002 DONE
Plan assigned to (M_P)5/6/2002 11/15/2002 PASS
DetailsMike Phillips
11/15/2002 13:46:41 M_P - activity updated through activity BLDA022 from case BLD02-01072.
Routing - FIRE11/6/2002 11/8/2002 FAIL
DetailsBill Alexander
Hydrant locations have problems with obstructions (carports, parking) and need updated due to FD access modifications. Water supply is questionable due to the location of certificate. Fire loop is found to be 4" and minimum allowed is 6".
Routing - PLAN CHECK10/23/2002 11/6/2002 PEND
Routing to fire.
Plan resubmittals received  10/31/2002 DONE
Received three sets of resubmittal sheets CS1, A02, A03, A04, A05, A06, A08, A10, A33, with cover letter. Routed to Mike Phillips.
Plan resubmittals received  10/25/2002 DONE
Received two copies of revised sheets C2.0, C2.1, C2.2, C3.1 and C3.2. Routed to Mike P. kmm
Routing - FIRE10/17/2002 10/22/2002 FAIL
DetailsBill Alexander
Lack response to items #2, #3 and #5 review dated 06/6/2002 and now 10/22/2002.
Routing - PLAN CHECK10/3/2002 10/17/2002 PEND
10/17/02 * Waiting for others to approve prior to issuing permit.
Routing - PLANNING9/27/2002 10/3/2002 PASS
Approved per DRH02-5 and as noted on plans.
Routing - PLANNING Land Div9/25/2002 9/27/2002 PASS
Approved. ROS 2842. Parcel is 13.1 acres in size. Parcels over 5 acres are exempt from subdivision requirements.
Plan resubmittals received  9/24/2002 DONE
Received three copies of revised struct. calcs., sheets A03, A04, A05, A06, A08, A10, A12, A20, A21, A22, A23, A24, A25, A26, A27, P-1, M02, E02, L01. and five copies of revised sheets C-1.0, C-2.0, C-2.1, C-2.2, C-3.0, C-3.1, C-3.2, C-4.0, C-4.1, C-4.2, C-4.3, C-5.0, C-5.1, C-5.2, C-6.0. Had client put into plans. kmm
Plan resubmittals received  7/25/2002 DONE
Received comment letter by fax. Routed to Mike Phillips.
Routing - PLAN CHECK7/8/2002 7/25/2002  
Plan resubmittals received  7/23/2002 DONE
Received three copies of revised sheets A15, A16, A17, A18, A19, A20, A21, A22, A23, A24, A25, A26, A27, A28, A29, A30, A32, A34, M01, M02, M03, response letter and revised tructural calculations. Routed two copies to Mike P, and one copy to outside eng. kmm
Plan resubmittals received  7/23/2002 DONE
Received three copies of revised sheets A15, A16, A17, A18, A19, A20, A21, A22, A23, A24, A25, A26, A27, A28, A29, A30, A32, A34, M01, M02, M03, response letter and revised tructural calculations. Routed two copies to Mike P, and one copy to outside eng. kmm
Plan resubmittals received  7/8/2002 DONE
Received two copies of resubmittal Sheet No. 1. Routed to Mike Phillips.
Routing - PLUMBING7/8/2002 7/8/2002 PASS
VENT ALL FIXTURES, COLD WATER BRANCH SERVING 2 BATH UNITS MUST BE 1".
Routing - PLAN CHECK6/26/2002 7/8/2002 FAIL
7/1/02 * Second review failed. Sent comments to architect requesting additional information for further review.
Plan resubmittals received  6/27/2002 DONE
Received three copies of structural calcs, sheets SO1, CS1, A01, A02, A03, A04, A05, A06, A08, A09, A10, A11, A15, A14, A17, A18, A21, A22, A25, A26, A31, A32, A33, A34, A35, A36, M01, M02, M03. Routed two copies to Mike P and one copy to outside eng. kmm
Routing - PUBLIC WORKS6/20/2002 6/26/2002 PASS
Routing - PLAN CHECK6/17/2002 6/20/2002  
Routing - PUBLIC WORKS6/10/2002 6/17/2002 FAIL
Requires drainage plan revisions. Per Brian Murphy
Routing - PLAN CHECK6/6/2002 6/10/2002  
Routing - FIRE6/3/20026/6/20026/6/2002 FAIL
DetailsBill Alexander
Reference attached and faxed notes 06/06/2002.
Plan Review Completed(1st rev)  6/6/2002 DONE
Routing - PLAN CHECK6/3/2002 6/3/2002  
Routing to fire.
Routing - PLUMBING6/3/2002 6/3/2002 FAIL
see bld02-01060
Routing - PLANNING5/24/2002 5/31/2002 FAIL
Approved as per CUP01-00164 (Dave Abo).
Plans do not comply with Design Review, DRH02-00005; please note conditions 1d, 1e and 2 (Martin Santoyo).
Routing - PLAN CHECK5/20/2002 5/24/2002 FAIL
Plan review completed, sent correction report to architect requesting additional informaiton for further review.
Routing - PUBLIC WORKS5/10/2002 5/20/2002 PASS
Requires revisions per Brian M. kmm
Routing Off Site - STRUCTURAL  5/15/2002 FAIL
contacted pdq to take plans to outside eng. kmm
Additional review required by outside engineering firm .
Routing - PLANNING Land Div5/9/2002 5/10/2002 FAIL
requested deed
Plan routing begun/NEW & ADDTN  5/9/2002  
Plans ACCEPTED BY PLAN TECH  5/6/2002 PEND
Requires stamped and signed structural sheets. Contacted Scott McDonald of this need. kmm
Application received  5/2/2002  
Recd Pcfee & Taken To Pln CK  5/2/2002 DONE
Fee Review-notes5/2/20025/2/2002   
Routing Off Site - STRUCTURAL6/27/2002    
Contacted pdq to take revised plans of 6/27/02 to outside eng. kmm
Routing Off Site - STRUCTURAL7/23/2002    
contacted pdq to take revised plans of 7.23.02 to outside eng. kmm
Routing Off Site - STRUCTURAL7/23/2002    
contacted pdq to take revised plans of 7.23.02 to outside eng. kmm
Routing - PLAN CHECK11/12/2002