Fee Review-notes | 5/2/2002 | 5/2/2002 | 8/10/2004 | | DONE |
|
|
|
|
First Notice | | 12/11/2003 | 12/11/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/11/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9900 issued 12-11-03 to Aspen Springs Apartments for the clubhouse.
|
Permanent Occupancy | | 12/10/2003 | 12/10/2003 | | DONE |
|
|
|
|
BLD-Final | 12/10/2003 | 12/10/2003 | 12/10/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/10/2003 at 9:45:58 AM. Contact: ###-####. OK for Perm Occ. :) 12/10/2003 4:56:03 PM
|
Temporary occupancy | | | 11/19/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #5024 issued 11-19-03 to the Aspen Springs Apts. club house.
|
BLD-Final | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/18/2003 at 10:44:50 AM. Contact: ###-####. OK for Temp Occ. C/N...Front door to comply with ADA...per plan.....Obtain Perm Occ. within 90 days of this notice. 11/18/2003 3:30:08 PM
|
BLD-Final | 10/2/2003 | 10/3/2003 | 10/3/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/2/2003 at 11:32:48 AM. Contact: ###-####. C/N Change front door swing to meet ADA Need code inforc final Occ. 10/3/2003 2:40:21 PM
|
BLD-Final | 10/3/2003 | 10/3/2003 | 10/3/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/3/2003 at 7:23:50 AM. Contact: ###-####.
|
FIRE-Final Inspection | 10/2/2003 | 10/2/2003 | 10/2/2003 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/2/2003 at 7:30:50 AM. Contact: ###-####. will have restroom/office and playroom door hardware openable from the inside without special knowledge for structural inspection; right now the levers don't release the lock 10/2/2003 10:55:21 AM
|
Code Occupancy Approval | 10/1/2003 | 10/1/2003 | 10/1/2003 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 10/1/2003 11:58:38 AM
|
FIRE-Final Inspection | 9/26/2003 | 9/26/2003 | 9/26/2003 | P | FAIL |
Troy Cobbley
|
|
|
fire alarm system could not be finaled. I went over door hardware and fire extinguisher issues with the superintendant for the project. 9/26/2003 3:18:29 PM
|
PubWorks Occupancy Approval | 9/12/2003 | 9/12/2003 | 9/12/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 9/12/03. S.Landaluce
|
BLD-Wall cover | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/27/2003 at 4:55:31 PM. Contact: ###-####.Adde 5/28/2003 4:49:15 PM added more screws to lid. still need gas log inspection. 5/28/2003 4:49:57 PM
|
BLD-Framing/Rough-in | 5/27/2003 | 5/27/2003 | 5/27/2003 | P | FAIL |
Russ Owen
|
|
|
vincent 1st layer dry wall cover; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Note: nothing shown on approved plans indicating drywall nailing/screwing, only indicates a double 5/8" lid, UBC , code would require screws for this assembly. Contractor is now adding screws and wil recall. 5/27/2003 5:28:00 PM
|
BLD-Framing/Rough-in | 5/22/2003 | 5/23/2003 | 5/23/2003 | A | PART |
Russ Owen
|
|
|
posted a c/n for fire place and exterior wall detail from architect. 5/27/2003 9:50:10 AM
|
BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 4:46:41 PM. Contact: ###-####.c/n. 5/22/2003 3:32:29 PM
|
BLD-Conference | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | FAIL |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Barbara MooreWaitng for detail for the ext wall 1hr construction. 5/22/2003 12:52:46 PM
|
BLD-Framing/Rough-in | 5/19/2003 | 5/20/2003 | 5/20/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/19/2003 at 5:57:10 PM. Contact: ###-####.I called contractor he needs to submit exterior wall detail assembly for 1hr construction. Same for entire project. 5/20/2003 4:59:16 PM
|
BLD-Framing/Rough-in | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 4:43:19 PM. Contact: ###-####.I have a c/n posted note these have been insulated with out approval. 5/19/2003 5:12:11 PM
|
BLD-Framing/Rough-in | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/14/2003 at 1:20:54 PM. Contact: ###-#### BOB. Fire stoping etc not done went over requirements with builder. 5/15/2003 2:48:27 PM
|
FIRE-Conference | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | DONE |
Troy Cobbley
|
|
|
vincent; Phone #: ###-#### The conference was over life safety issues in the club house. Upon inspection of the club house I found the fire alarm system being installed without approved plans. I left a stop work notice with Vincent. An email has been sent to Sam Rogers and Dave Miller 5/15/2003 1:12:34 PM
|
BLD-Conference | 5/7/2003 | 5/8/2003 | 5/8/2003 | A | PART |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Annette Moore. This construction type will rquire ifre dampers. 5/9/2003 11:21:18 AM
|
BLD-Framing/Rough-in | 4/25/2003 | 4/28/2003 | 4/28/2003 | P | FAIL |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Annette Moore Again need addnl clairification from engineer. 4/29/2003 4:32:42 PM
|
BLD-Framing/Rough-in | 4/24/2003 | 4/25/2003 | 4/25/2003 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/24/2003 at 3:02:48 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | FAIL |
Russ Owen
|
|
|
###-#### vincent ###-#### vincent . These plan are not clearly indicateing engineered features, I have again requested more clairification from engineer. Note:###-#### vincent . These plan are not clearly indicating engineered features, I have again requested more clairification from engineer. the engineer did not draw these details. 4/16/2003 4:48:41 PM
|
Inspection Record Card- Bld | | | 4/16/2003 | | |
|
|
|
|
Print Occupancy Form | | | 4/16/2003 | | |
|
|
|
|
BLD-Conference | 4/8/2003 | 4/9/2003 | 4/9/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/8/2003 at 4:50:05 PM. Contact: ###-####.
|
BLD-Conference | 4/9/2003 | 4/9/2003 | 4/9/2003 | P | PART |
Russ Owen
|
|
|
would like you to meet architect at 1:30. 4/9/2003 10:04:17 AMArchitect on site went over requirements with him and contractor. If construction typ changed on town hose units will require a plan mod. 4/10/2003 10:28:51 AM
|
BLD-Conference | 3/4/2003 | 3/5/2003 | 3/5/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/4/2003 at 12:49:19 PM. Contact: ###-####.
|
FIRE-Conference | 3/4/2003 | 3/5/2003 | 3/5/2003 | A | DONE |
Troy Cobbley
|
|
|
Phone #: ###-#### I spoke to the contractor about on site fire protection. The last fire hydrant was being installed today. All roads accessing the job site would be finished by next week as well as all fire hydrants being operational. Building supplies are to begin arriving the end of next week 3/5/2003 9:36:54 AM
|
BLD-Framing/Rough-in | 3/3/2003 | 3/3/2003 | 3/3/2003 | P | CANC |
Russ Owen
|
|
|
###-#### vincent
|
BLD-Foundation | 1/23/2003 | 1/24/2003 | 1/24/2003 | P | PART |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. 1/24/2003 4:05:18 PM
|
BLD-Footing | 1/21/2003 | 1/22/2003 | 1/22/2003 | P | PART |
Russ Owen
|
|
|
801 ###-#### vincent
|
(F) Reprint permit | | | 12/11/2002 | | |
|
|
|
|
Issue & PRINT to be Invoiced | | | 12/10/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/14/2002 | | 11/15/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/15/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/15/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/15/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/15/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 5/6/2002 | | 11/15/2002 | | PASS |
Mike Phillips
|
|
|
11/15/2002 13:53:12 M_P - activity updated through activity BLDA022 from case BLD02-01073.
|
Routing - FIRE | 11/6/2002 | | 11/8/2002 | | FAIL |
Bill Alexander
|
|
|
Hydrant locations have problems with obstructions (carports, parking) and need updated due to FD access modifications. Water supply is questionable due to the location of certificate. Fire loop is found to be 4" and minimum allowed is 6".
|
Routing - PLAN CHECK | 10/23/2002 | | 11/6/2002 | | PEND |
|
|
|
Routing to fire.
|
Plan resubmittals received | | | 10/31/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets CS1, A02, A03, A04, A05, A06, A08, A10, A33, with cover letter. Routed to Mike Phillips.
|
Plan resubmittals received | | | 10/25/2002 | | DONE |
|
|
|
Received two copies of revised sheets C2.0, C2.1, C2.2, C3.1 and C3.2. Routed to Mike P. kmm
|
Routing - FIRE | 10/17/2002 | | 10/22/2002 | | FAIL |
Bill Alexander
|
|
|
Lack response to items #2 dated 06/6/2002 and now 10/22/2002.
|
Routing - PLAN CHECK | 10/3/2002 | | 10/17/2002 | | PEND |
|
|
|
10/17/02 * Waiting for others to approve prior to issuing permit.
|
Routing - PLANNING | 9/27/2002 | | 10/3/2002 | | PASS |
|
|
|
Approved per DRH02-5 and as noted on plans.
|
Routing - PLANNING Land Div | 9/25/2002 | | 9/27/2002 | | PASS |
|
|
|
Approved. ROS 2842. Parcel is 13.1 acres in size. Parcels over 5 acres are exempt from subdivision requirements.
|
Plan resubmittals received | | | 9/24/2002 | | DONE |
|
|
|
Received three copies of revised struct. calcs., sheets A03, A04, A05, A06, A08, A10, A12, A20, A21, A22, A23, A24, A25, A26, A27, P-1, M02, E02, L01. and five copies of revised sheets C-1.0, C-2.0, C-2.1, C-2.2, C-3.0, C-3.1, C-3.2, C-4.0, C-4.1, C-4.2, C-4.3, C-5.0, C-5.1, C-5.2, C-6.0. Had client put into plans. kmm
|
Routing Off Site - STRUCTURAL | 7/23/2002 | | 7/30/2002 | | PASS |
|
|
|
contacted pdq to take revised plans of 7.23.02 to outside eng. kmm
|
Plan resubmittals received | | | 7/25/2002 | | DONE |
|
|
|
Received comment letter by fax. Routed to Mike Phillips.
|
Routing - PLAN CHECK | 7/8/2002 | | 7/25/2002 | | |
|
|
|
|
Plan resubmittals received | | | 7/23/2002 | | DONE |
|
|
|
Received three copies of revised sheets A15, A16, A17, A18, A19, A20, A21, A22, A23, A24, A25, A26, A27, A28, A29, A30, A32, A34, M01, M02, M03, response letter and revised tructural calculations. Routed two copies to Mike P, and one copy to outside eng. kmm
|
Routing Off Site - STRUCTURAL | 6/27/2002 | | 7/11/2002 | | FAIL |
|
|
|
Contacted pdq to take revised plans of 6/27/02 to outside eng. kmm
Second review failed faxed comments to architect.
|
Plan resubmittals received | | | 7/8/2002 | | DONE |
|
|
|
Received two copies of resubmittal Sheet No. 1. Routed to Mike Phillips.
|
Routing - PLUMBING | 7/8/2002 | | 7/8/2002 | | PASS |
|
|
|
VENT ALL FIXTURES, COLD WATER BRANCH SERVING 2 BATH UNITS MUST BE 1".
|
Routing - PLAN CHECK | 6/26/2002 | | 7/8/2002 | | FAIL |
|
|
|
7/1/02 * Second review failed. Sent comments to architect requesting additional information for further review.
|
Plan resubmittals received | | | 6/27/2002 | | DONE |
|
|
|
Received three copies of structural calcs, sheets SO1, CS1, A01, A02, A03, A04, A05, A06, A08, A09, A10, A11, A15, A14, A17, A18, A21, A22, A25, A26, A31, A32, A33, A34, A35, A36, M01, M02, M03. Routed two copies to Mike P and one copy to outside eng. kmm
|
Routing - PUBLIC WORKS | 6/20/2002 | | 6/26/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/17/2002 | | 6/20/2002 | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/10/2002 | | 6/17/2002 | | FAIL |
|
|
|
Requires drainage plan revisions. Per Brian Murphy
|
Routing - PLAN CHECK | 6/6/2002 | | 6/10/2002 | | |
|
|
|
|
Routing - FIRE | 6/3/2002 | 6/3/2002 | 6/6/2002 | | FAIL |
Bill Alexander
|
|
|
Reference attached and faxed notes 06/06/2002.
|
Plan Review Completed(1st rev) | | | 6/6/2002 | | DONE |
|
|
|
|
Routing - PLUMBING | 6/3/2002 | | 6/3/2002 | | FAIL |
|
|
|
see bld02-01060
|
Routing - PLAN CHECK | 6/3/2002 | | 6/3/2002 | | |
|
|
|
Rou ting to fire.
|
Plan resubmittals received | | | 5/31/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets C-1.0, C-2.0, C-2.1, C-2.2, C-3.0, C-3.1, C-3.2, C-4.0, C-4.1, C-4.2, C-4.3, C-5.0, C-5.1, C-5.2, C-6.0. Routed to Mike Phillips.
|
Routing - PLANNING | 5/24/2002 | | 5/31/2002 | | FAIL |
|
|
|
Approved as per CUP01-00164 (Dave Abo).
Plans do not comply with Design Review, DRH02-00005; please note conditions 1d, 1e and 2 (Martin Santoyo).
|
Routing - PLAN CHECK | 5/20/2002 | | 5/24/2002 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing - PUBLIC WORKS | 5/10/2002 | | 5/20/2002 | | FAIL |
|
|
|
Requires revisions per Brian m. kmm
|
Routing Off Site - STRUCTURAL | 5/9/2002 | | 5/15/2002 | | FAIL |
|
|
|
contacted pdq to take plans to outside eng. kmm
Additional review required by outside engineering firm .
|
Routing - PLANNING Land Div | 5/9/2002 | | 5/10/2002 | | FAIL |
|
|
|
requested deed
|
Plan routing begun/NEW & ADDTN | | | 5/9/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/6/2002 | | PEND |
|
|
|
Requires stamped and signed structural sheets. Contacted Scott McDonald of this need. kmm
|
Application received | | | 5/2/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/2/2002 | | DONE |
|
|
|
|