Permit Information
Permit NumberBLD02-01073
StatusFinaled
Name PENTALON CONSTRUCTION, INC.
Site Address 8519 W FAIRVIEW AVE
Project NameASPEN SPRINGS APARTMENTS
Customer Number 
ePlanReviewNo
Description
Club House * (Building 1 Type A ) To construct a new 3590 sq.ft. single story, multi purpose club house with laundry facilities and maintance area. All construction per the approved plans and attached comment list. MJP DRH02-00005 CUP01-00164 PC#286-02
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes5/2/20025/2/20028/10/2004 DONE
First Notice 12/11/200312/11/2003 DONE
Permanent occupancy  12/11/2003 DONE
Perm. Occ. Cert. #9900 issued 12-11-03 to Aspen Springs Apartments for the clubhouse.
Permanent Occupancy 12/10/200312/10/2003 DONE
Details
BLD-Final12/10/200312/10/200312/10/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/10/2003 at 9:45:58 AM. Contact: ###-####. OK for Perm Occ. :) 12/10/2003 4:56:03 PM
Temporary occupancy  11/19/2003 DONE
Temp. Occ. Cert. #5024 issued 11-19-03 to the Aspen Springs Apts. club house.
BLD-Final11/18/200311/18/200311/18/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/18/2003 at 10:44:50 AM. Contact: ###-####. OK for Temp Occ. C/N...Front door to comply with ADA...per plan.....Obtain Perm Occ. within 90 days of this notice. 11/18/2003 3:30:08 PM
BLD-Final10/2/200310/3/200310/3/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/2/2003 at 11:32:48 AM. Contact: ###-####. C/N Change front door swing to meet ADA Need code inforc final Occ. 10/3/2003 2:40:21 PM
BLD-Final10/3/200310/3/200310/3/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/3/2003 at 7:23:50 AM. Contact: ###-####.
FIRE-Final Inspection10/2/200310/2/200310/2/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/2/2003 at 7:30:50 AM. Contact: ###-####. will have restroom/office and playroom door hardware openable from the inside without special knowledge for structural inspection; right now the levers don't release the lock 10/2/2003 10:55:21 AM
Code Occupancy Approval10/1/200310/1/200310/1/2003APASS
DetailsWm. Michael Meloy
Compliance met. 10/1/2003 11:58:38 AM
FIRE-Final Inspection9/26/20039/26/20039/26/2003PFAIL
DetailsTroy Cobbley
fire alarm system could not be finaled. I went over door hardware and fire extinguisher issues with the superintendant for the project. 9/26/2003 3:18:29 PM
PubWorks Occupancy Approval9/12/20039/12/20039/12/2003 DONE
Drainage project complete, signed permanent occupancy 9/12/03. S.Landaluce
BLD-Wall cover5/27/20035/28/20035/28/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/27/2003 at 4:55:31 PM. Contact: ###-####.Adde 5/28/2003 4:49:15 PM added more screws to lid. still need gas log inspection. 5/28/2003 4:49:57 PM
BLD-Framing/Rough-in5/27/20035/27/20035/27/2003PFAIL
DetailsRuss Owen
vincent 1st layer dry wall cover; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Note: nothing shown on approved plans indicating drywall nailing/screwing, only indicates a double 5/8" lid, UBC , code would require screws for this assembly. Contractor is now adding screws and wil recall. 5/27/2003 5:28:00 PM
BLD-Framing/Rough-in5/22/20035/23/20035/23/2003APART
DetailsRuss Owen
posted a c/n for fire place and exterior wall detail from architect. 5/27/2003 9:50:10 AM
BLD-Framing/Rough-in5/21/20035/22/20035/22/2003AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/21/2003 at 4:46:41 PM. Contact: ###-####.c/n. 5/22/2003 3:32:29 PM
BLD-Conference5/20/20035/21/20035/21/2003AFAIL
DetailsRuss Owen
vincent; Phone #: ###-#### Internet Inspection Request from: Barbara MooreWaitng for detail for the ext wall 1hr construction. 5/22/2003 12:52:46 PM
BLD-Framing/Rough-in5/19/20035/20/20035/20/2003ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/19/2003 at 5:57:10 PM. Contact: ###-####.I called contractor he needs to submit exterior wall detail assembly for 1hr construction. Same for entire project. 5/20/2003 4:59:16 PM
BLD-Framing/Rough-in5/16/20035/19/20035/19/2003AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/16/2003 at 4:43:19 PM. Contact: ###-####.I have a c/n posted note these have been insulated with out approval. 5/19/2003 5:12:11 PM
BLD-Framing/Rough-in5/14/20035/15/20035/15/2003AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/14/2003 at 1:20:54 PM. Contact: ###-#### BOB. Fire stoping etc not done went over requirements with builder. 5/15/2003 2:48:27 PM
FIRE-Conference5/14/20035/15/20035/15/2003ADONE
DetailsTroy Cobbley
vincent; Phone #: ###-#### The conference was over life safety issues in the club house. Upon inspection of the club house I found the fire alarm system being installed without approved plans. I left a stop work notice with Vincent. An email has been sent to Sam Rogers and Dave Miller 5/15/2003 1:12:34 PM
BLD-Conference5/7/20035/8/20035/8/2003APART
DetailsRuss Owen
vincent; Phone #: ###-#### Internet Inspection Request from: Annette Moore. This construction type will rquire ifre dampers. 5/9/2003 11:21:18 AM
BLD-Framing/Rough-in4/25/20034/28/20034/28/2003PFAIL
DetailsRuss Owen
vincent; Phone #: ###-#### Internet Inspection Request from: Annette Moore Again need addnl clairification from engineer. 4/29/2003 4:32:42 PM
BLD-Framing/Rough-in4/24/20034/25/20034/25/2003PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 4/24/2003 at 3:02:48 PM. Contact: ###-####.
BLD-Framing/Rough-in4/15/20034/16/20034/16/2003AFAIL
DetailsRuss Owen
###-#### vincent ###-#### vincent . These plan are not clearly indicateing engineered features, I have again requested more clairification from engineer. Note:###-#### vincent . These plan are not clearly indicating engineered features, I have again requested more clairification from engineer. the engineer did not draw these details. 4/16/2003 4:48:41 PM
Inspection Record Card- Bld  4/16/2003  
Print Occupancy Form  4/16/2003  
BLD-Conference4/8/20034/9/20034/9/2003ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 4/8/2003 at 4:50:05 PM. Contact: ###-####.
BLD-Conference4/9/20034/9/20034/9/2003PPART
DetailsRuss Owen
would like you to meet architect at 1:30. 4/9/2003 10:04:17 AMArchitect on site went over requirements with him and contractor. If construction typ changed on town hose units will require a plan mod. 4/10/2003 10:28:51 AM
BLD-Conference3/4/20033/5/20033/5/2003ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/4/2003 at 12:49:19 PM. Contact: ###-####.
FIRE-Conference3/4/20033/5/20033/5/2003ADONE
DetailsTroy Cobbley
Phone #: ###-#### I spoke to the contractor about on site fire protection. The last fire hydrant was being installed today. All roads accessing the job site would be finished by next week as well as all fire hydrants being operational. Building supplies are to begin arriving the end of next week 3/5/2003 9:36:54 AM
BLD-Framing/Rough-in3/3/20033/3/20033/3/2003PCANC
DetailsRuss Owen
###-#### vincent
BLD-Foundation1/23/20031/24/20031/24/2003PPART
DetailsRuss Owen
vincent; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. 1/24/2003 4:05:18 PM
BLD-Footing1/21/20031/22/20031/22/2003PPART
DetailsRuss Owen
801 ###-#### vincent
(F) Reprint permit  12/11/2002  
Issue & PRINT to be Invoiced  12/10/2002 DONE
Routing - PLAN CHECK11/14/2002 11/15/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/15/2002 DONE
Print Pending Permit.LaserJet4  11/15/2002 DONE
Case Summary (BLD)  11/15/2002 DONE
Inspection Record Card- Bld  11/15/2002 DONE
Print Occupancy Form  11/15/2002 DONE
Plan assigned to (M_P)5/6/2002 11/15/2002 PASS
DetailsMike Phillips
11/15/2002 13:53:12 M_P - activity updated through activity BLDA022 from case BLD02-01073.
Routing - FIRE11/6/2002 11/8/2002 FAIL
DetailsBill Alexander
Hydrant locations have problems with obstructions (carports, parking) and need updated due to FD access modifications. Water supply is questionable due to the location of certificate. Fire loop is found to be 4" and minimum allowed is 6".
Routing - PLAN CHECK10/23/2002 11/6/2002 PEND
Routing to fire.
Plan resubmittals received  10/31/2002 DONE
Received three sets of resubmittal sheets CS1, A02, A03, A04, A05, A06, A08, A10, A33, with cover letter. Routed to Mike Phillips.
Plan resubmittals received  10/25/2002 DONE
Received two copies of revised sheets C2.0, C2.1, C2.2, C3.1 and C3.2. Routed to Mike P. kmm
Routing - FIRE10/17/2002 10/22/2002 FAIL
DetailsBill Alexander
Lack response to items #2 dated 06/6/2002 and now 10/22/2002.
Routing - PLAN CHECK10/3/2002 10/17/2002 PEND
10/17/02 * Waiting for others to approve prior to issuing permit.
Routing - PLANNING9/27/2002 10/3/2002 PASS
Approved per DRH02-5 and as noted on plans.
Routing - PLANNING Land Div9/25/2002 9/27/2002 PASS
Approved. ROS 2842. Parcel is 13.1 acres in size. Parcels over 5 acres are exempt from subdivision requirements.
Plan resubmittals received  9/24/2002 DONE
Received three copies of revised struct. calcs., sheets A03, A04, A05, A06, A08, A10, A12, A20, A21, A22, A23, A24, A25, A26, A27, P-1, M02, E02, L01. and five copies of revised sheets C-1.0, C-2.0, C-2.1, C-2.2, C-3.0, C-3.1, C-3.2, C-4.0, C-4.1, C-4.2, C-4.3, C-5.0, C-5.1, C-5.2, C-6.0. Had client put into plans. kmm
Routing Off Site - STRUCTURAL7/23/2002 7/30/2002 PASS
contacted pdq to take revised plans of 7.23.02 to outside eng. kmm
Plan resubmittals received  7/25/2002 DONE
Received comment letter by fax. Routed to Mike Phillips.
Routing - PLAN CHECK7/8/2002 7/25/2002  
Plan resubmittals received  7/23/2002 DONE
Received three copies of revised sheets A15, A16, A17, A18, A19, A20, A21, A22, A23, A24, A25, A26, A27, A28, A29, A30, A32, A34, M01, M02, M03, response letter and revised tructural calculations. Routed two copies to Mike P, and one copy to outside eng. kmm
Routing Off Site - STRUCTURAL6/27/2002 7/11/2002 FAIL
Contacted pdq to take revised plans of 6/27/02 to outside eng. kmm
Second review failed faxed comments to architect.
Plan resubmittals received  7/8/2002 DONE
Received two copies of resubmittal Sheet No. 1. Routed to Mike Phillips.
Routing - PLUMBING7/8/2002 7/8/2002 PASS
VENT ALL FIXTURES, COLD WATER BRANCH SERVING 2 BATH UNITS MUST BE 1".
Routing - PLAN CHECK6/26/2002 7/8/2002 FAIL
7/1/02 * Second review failed. Sent comments to architect requesting additional information for further review.
Plan resubmittals received  6/27/2002 DONE
Received three copies of structural calcs, sheets SO1, CS1, A01, A02, A03, A04, A05, A06, A08, A09, A10, A11, A15, A14, A17, A18, A21, A22, A25, A26, A31, A32, A33, A34, A35, A36, M01, M02, M03. Routed two copies to Mike P and one copy to outside eng. kmm
Routing - PUBLIC WORKS6/20/2002 6/26/2002 PASS
Routing - PLAN CHECK6/17/2002 6/20/2002  
Routing - PUBLIC WORKS6/10/2002 6/17/2002 FAIL
Requires drainage plan revisions. Per Brian Murphy
Routing - PLAN CHECK6/6/2002 6/10/2002  
Routing - FIRE6/3/20026/3/20026/6/2002 FAIL
DetailsBill Alexander
Reference attached and faxed notes 06/06/2002.
Plan Review Completed(1st rev)  6/6/2002 DONE
Routing - PLUMBING6/3/2002 6/3/2002 FAIL
see bld02-01060
Routing - PLAN CHECK6/3/2002 6/3/2002  
Rou ting to fire.
Plan resubmittals received  5/31/2002 DONE
Received two sets of resubmittal sheets C-1.0, C-2.0, C-2.1, C-2.2, C-3.0, C-3.1, C-3.2, C-4.0, C-4.1, C-4.2, C-4.3, C-5.0, C-5.1, C-5.2, C-6.0. Routed to Mike Phillips.
Routing - PLANNING5/24/2002 5/31/2002 FAIL
Approved as per CUP01-00164 (Dave Abo).
Plans do not comply with Design Review, DRH02-00005; please note conditions 1d, 1e and 2 (Martin Santoyo).
Routing - PLAN CHECK5/20/2002 5/24/2002 FAIL
Plan review completed, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Routing - PUBLIC WORKS5/10/2002 5/20/2002 FAIL
Requires revisions per Brian m. kmm
Routing Off Site - STRUCTURAL5/9/2002 5/15/2002 FAIL
contacted pdq to take plans to outside eng. kmm
Additional review required by outside engineering firm .
Routing - PLANNING Land Div5/9/2002 5/10/2002 FAIL
requested deed
Plan routing begun/NEW & ADDTN  5/9/2002 DONE
Plans ACCEPTED BY PLAN TECH  5/9/2002 DONE
Plans ACCEPTED BY PLAN TECH  5/6/2002 PEND
Requires stamped and signed structural sheets. Contacted Scott McDonald of this need. kmm
Application received  5/2/2002  
Recd Pcfee & Taken To Pln CK  5/2/2002 DONE