Fee Review-notes | 5/6/2002 | 5/6/2002 | 8/10/2004 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 7/22/2004 | | PASS |
|
|
|
OK TO SIGNE FINAL AND RELEASE OF BOND.
|
Letter of compliance | | | 2/18/2004 | | DONE |
|
|
|
Letter of Compliance issued 2-13-04.
|
BLD-Framing/Rough-in | 2/10/2004 | 2/12/2004 | 2/12/2004 | A | CANC |
Tom Arcoraci
|
|
|
Robbie; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Final | 2/12/2004 | 2/12/2004 | 2/12/2004 | A | PASS |
Tom Arcoraci
|
|
|
|
PubWorks Occupancy Approval | 1/12/2004 | 1/12/2004 | 1/12/2004 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 1/12/04. G.Fitts
|
Temporary occupancy | | | 2/21/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4921 issued to the Norris Office Building (shell).
|
BLD-Conference | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | NR |
Russ Owen
|
|
|
see notes on other permit. 12/6/2002 2:31:28 PM
|
FIRE-Final Inspection | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
BLD-Energy code compliance | 9/19/2002 | 9/20/2002 | 9/20/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/19/2002 at 14:11:40. Contact: ###-####. Int. 5/8 firecode complete to roof deck per resubmit. 1 hr OK 9/20/2002 9:55:37 AM 9/20/2002 9:58:42 AM
|
BLD-Framing/Rough-in | 9/16/2002 | 9/17/2002 | 9/17/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/16/2002 at 13:14:21. Contact: ###-####. C/N posted. 9/17/2002 11:42:15 AM
|
BLD-Framing/Rough-in | 9/6/2002 | 9/9/2002 | 9/9/2002 | A | FAIL |
Tom Arcoraci
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cn posted 9/9/2002 9:34:07 AM
|
BLD-Framing/Rough-in | 8/21/2002 | 8/22/2002 | 8/22/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 15:07:36. Contact: ###-####. ok to roof and drywall ext 8/22/2002 9:51:37 AM
|
BLD-Framing/Rough-in | 8/20/2002 | 8/21/2002 | 8/21/2002 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 14:50:13. Contact: ###-####. no plans on site 8/21/2002 11:17:54 AM
|
(F) Reprint permit | | | 6/26/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/25/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/24/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2002 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 5/7/2002 | | 6/21/2002 | | PASS |
Mike Otto
|
|
|
6/21/2002 14:15:13 MLO - activity updated through activity BLDA022 from case BLD02-01089.
|
Routing - PLANNING Land Div | 6/14/2002 | | 6/20/2002 | | PASS |
|
|
|
rec'd deeds, no lot split.
|
Routing - PLAN CHECK | 6/14/2002 | | 6/14/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/13/2002 | | DONE |
|
|
|
Received five copies of C-1, C-2, C-3 and two copies of revised sheet A-2 Unit A A-2 Unit C, A-4, A-5, A-6. routed to Mike O. kmm
|
Routing - PLUMBING | 6/6/2002 | | 6/6/2002 | | PASS |
|
|
|
|
Routing - FIRE | 6/4/2002 | 6/5/2002 | 6/5/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - PUBLIC WORKS | 5/31/2002 | | 6/4/2002 | | PASS |
|
|
|
ROUTE TO PW AFTER FIRST REVIEW
|
Routing - FIRE | 5/30/2002 | 5/31/2002 | 5/31/2002 | | FAIL |
Bill Alexander
|
|
|
Lack hydrant location to verify UFC 903.4.2.
|
Plan Review Completed(1st rev) | | | 5/31/2002 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 5/30/2002 | | DONE |
|
|
|
UBC corrections
|
Plan resubmittals received | | | 5/30/2002 | | DONE |
|
|
|
Received two copies of resubmittal sheets A8. Routed to Mike Otto.
|
Routing - PLAN CHECK | 5/21/2002 | | 5/30/2002 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 5/17/2002 | | 5/21/2002 | | FAIL |
|
|
|
1. Water heater Piping Detail
2. Floor sinks floor drains or trap primer locations.
3. Premise back flow protection or thermal expansion.
4. Point of use backflow protection may be required.
5. Fixture schedule provided for sizing of waste and water.
|
Routing - PLANNING | 5/16/2002 | | 5/17/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/9/2002 | | 5/16/2002 | | FAIL |
|
|
|
Requires Drainage Plan Revisions
|
Routing - PLANNING Land Div | 5/9/2002 | | 5/9/2002 | | FAIL |
|
|
|
Need deeds to verify land division. Called Zach Evans ###-#### on 5/9/02.
6/18/02...called Zack Evans and Anna Powell, will get new sheet C1.0. Property is not been split. One deed.
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2002 | | DONE |
|
|
|
|
Application received | | | 5/6/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/6/2002 | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|