Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD02-01110
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 6013 W OVERLAND RD Unit: 101
Project NameNORRIS CHIROPRACTIC
Customer Number 
ePlanReviewNo
Description
Tenant space A - To complete a 2407 sq. ft. office space in an existing single story Type VN shell building ( BLD02-01089) for Norris Chiropractic
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes5/8/20025/8/20028/10/2004 DONE
First Notice 3/9/20043/9/2004 DONE
Permanent occupancy  2/13/2004 DONE
Perm. Occ. Cert. # 9992 issued 2-13-04 to Norris Chiropractic.
BLD-Final2/12/20042/12/20042/12/2004 DONE
ok for final perm. occ. / Tom
Permanent Occupancy 2/12/20042/12/2004 DONE
Details
BLD-Framing/Rough-in2/10/20042/12/20042/12/2004ACANC
DetailsTom Arcoraci
Robbie; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Temporary occupancy  2/24/2003 DONE
Temp. Occ. Cert. #4919 issued 2-21-03 to Norris Chiropractic.
BLD-Final12/6/200212/9/200212/9/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/06/2002 at 16:12:27. Contact: ###-####. ok for temp 12/9/2002 11:47:29 AM
FIRE-Final Inspection12/5/200212/6/200212/6/2002AFAIL
DetailsTroy Cobbley
no items on the correction notice have been corrected 12/6/2002 8:45:34 AM
BLD-Final12/5/200212/6/200212/6/2002PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/05/2002 at 15:38:15. Contact: ###-####.this needs achd, and scell finaled prior. 12/6/2002 2:31:00 PM
FIRE-Final Inspection12/6/200212/6/200212/6/2002PPASS
DetailsTroy Cobbley
Fire life safety finaled. Structural inspector please verify door hardware when finally installed 12/6/2002 2:14:46 PM
BLD-Final12/4/200212/5/200212/5/2002ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/04/2002 at 12:59:06. Contact: ###-####.
FIRE-Final Inspection12/4/200212/5/200212/5/2002PFAIL
DetailsTroy Cobbley
provide City approved plans on site for inspection, provide approved door hardware on all doors and provide Door to remain unlocked during business hours sticker 12/5/2002 1:07:20 PM
BLD-Energy code compliance9/19/20029/20/20029/20/2002APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/19/2002 at 14:12:42. Contact: ###-####. Int. 5/8 firecode to roof deck per resubmit 1hr. OK 9/20/2002 9:56:26 AM 9/20/2002 9:58:17 AM
BLD-Framing/Rough-in9/16/20029/17/20029/17/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/16/2002 at 13:15:28. Contact: ###-####. C/N posted. 9/17/2002 11:42:33 AM
BLD-Framing/Rough-in9/6/20029/9/20029/9/2002AFAIL
DetailsTom Arcoraci
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cn posted 9/9/2002 9:34:16 AM
BLD-Foundation7/22/20027/23/20027/23/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/22/2002 at 17:07:35. Contact: ###-####.
BLD-Footing7/18/20027/19/20027/19/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/18/2002 at 17:32:13. Contact: ###-####.
Issue PAID IN FULL permit  6/25/2002  
Inspection Record Card- Bld  6/24/2002 DONE
Print Occupancy Form  6/24/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/21/2002 DONE
Plan assigned to (MLO)5/9/2002 6/21/2002 PASS
DetailsMike Otto
6/21/2002 14:15:41 MLO - activity updated through activity BLDA022 from case BLD02-01110.
Routing - PLANNING Land Div6/14/2002 6/20/2002 PASS
no lot split...ok
Routing - PLAN CHECK6/14/2002 6/14/2002 PASS
Routing - PLUMBING6/6/2002 6/6/2002 PASS
Routing - PUBLIC WORKS5/31/2002 6/4/2002 PASS
Routing - FIRE5/30/20025/31/20025/31/2002 PASS
DetailsBill Alexander
Routing - PLAN CHECK5/21/2002 5/31/2002 FAIL
Plan resubmittals received  5/30/2002 DONE
Received two sets of resubmittal sheets A8. Routed to Mike Otto.
Routing - PLUMBING5/17/2002 5/21/2002 FAIL
1. Water heater Piping Detail
2. Floor sinks floor drains or trap primer locations.
3. Premise back flow protection or thermal expansion.
4. Point of use backflow protection may be required.
5. Fixture schedule provided for sizing of waste and water.
Routing - PLANNING5/16/2002 5/17/2002 PASS
Routing - PUBLIC WORKS5/9/2002 5/16/2002 FAIL
Requires Drainage Plan Revisions
Routing - PLANNING Land Div5/9/2002 5/9/2002 FAIL
Need deeds to verify land division. Called Zach Evans on 5/9/02.
Application received  5/8/2002  
Recd Pcfee & Taken To Pln CK  5/8/2002 DONE