Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD02-01111
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 6013 W OVERLAND RD Unit: 103
Project NameOVERLAND ROAD COMMERCIAL
Customer Number 
ePlanReviewNo
Description
(TENANT C) A permit for a vanilla finish in a 1027 sq. ft. vacant office space in an existing Type VN shell building(BLD02-01089). A separate permit will be required for occupancy approval and a certificate of occupancy.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes5/8/20025/8/20028/10/2004 DONE
Office final  3/9/2004 DONE
Perm. Occ. Cert. # 9993 issued 2-13-04 to tenant under permit # MIS02-00314.
BLD-Final12/6/200212/9/200212/9/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/06/2002 at 16:13:28. Contact: ###-####. ok for temp 12/9/2002 11:47:39 AM
FIRE-Final Inspection12/5/200212/6/200212/6/2002AFAIL
DetailsTroy Cobbley
no items on the correction notice have been corrected 12/6/2002 8:45:53 AM
BLD-Final12/5/200212/6/200212/6/2002PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/05/2002 at 15:41:06. Contact: ###-####.see notes on other permit. 12/6/2002 2:31:14 PM
FIRE-Final Inspection12/6/200212/6/200212/6/2002PPASS
DetailsTroy Cobbley
Fire life safety finaled. Structural inspector please verify door hardware when finally installed 12/6/2002 2:14:55 PM
BLD-Final12/4/200212/5/200212/5/2002ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/04/2002 at 13:00:17. Contact: ###-####.
FIRE-Final Inspection12/4/200212/5/200212/5/2002PFAIL
DetailsTroy Cobbley
provide City approved plans on site for inspection, provide approved door hardware on all doors and provide Door to remain unlocked during business hours sticker 12/5/2002 1:07:30 PM
Inspection Record Card- Bld  12/2/2002 DONE
Inspection Record Card- Bld  12/2/2002 DONE
BLD-Energy code compliance9/19/20029/20/20029/20/2002APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/19/2002 at 14:13:35. Contact: ###-####. 5/8 firecode to roof deck (int.) per resubmittal. 1 hr OK 9/20/2002 9:57:21 AM 9/20/2002 9:57:52 AM 9/20/2002 9:59:04 AM
BLD-Framing/Rough-in9/16/20029/17/20029/17/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/16/2002 at 13:16:34. Contact: ###-####. C/N posted. 9/17/2002 11:42:53 AM
BLD-Framing/Rough-in9/6/20029/9/20029/9/2002AFAIL
DetailsTom Arcoraci
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cn posted 9/9/2002 9:34:25 AM
Issue PAID IN FULL permit  6/25/2002 DONE
Inspection Record Card- Bld  6/24/2002 DONE
Plan assigned to (MLO)5/9/20025/9/20026/21/2002 PASS
DetailsMike Otto
6/21/2002 14:16:09 MLO - activity updated through activity BLDA022 from case BLD02-01111.
PLANS/APPL TAKEN TO FRONT DESK  6/21/2002 DONE
Routing - PLANNING Land Div6/14/2002 6/20/2002 PASS
ok...no lot split
Routing - PLAN CHECK6/14/2002 6/14/2002 PASS
Routing - PLUMBING6/6/2002 6/6/2002 PASS
Routing - PUBLIC WORKS5/31/2002 6/4/2002 PASS
Routing - FIRE5/30/20025/31/20025/31/2002 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  5/31/2002 DONE
Plan Review Completed(1st rev)  5/31/2002 DONE
Routing - PLAN CHECK5/21/2002 5/31/2002 FAIL
Plan resubmittals received  5/30/2002 DONE
Received two copies of resubmittal sheets A8. Routed to Mike Otto.
Routing - PLUMBING5/17/2002 5/21/2002 FAIL
1. Water heater Piping Detail
2. Floor sinks floor drains or trap primer locations.
3. Premise back flow protection or thermal expansion.
4. Point of use backflow protection may be required.
5. Fixture schedule provided for sizing of waste and water.
Routing - PLANNING5/16/2002 5/17/2002 PASS
Routing - PUBLIC WORKS5/9/2002 5/16/2002 FAIL
Requires Drainage Plan Revisions
Routing - PLANNING Land Div5/9/2002 5/9/2002 FAIL
Need deeds to verify land division. Called Zach Evans, 5/9/02.
Plans ACCEPTED BY PLAN TECH  5/9/2002 DONE
Application received  5/8/2002  
Recd Pcfee & Taken To Pln CK  5/8/2002 DONE