Permit Information
Permit NumberBLD02-01130
StatusFinaled
Name DALE BOWDEN & MARTHA CLINE
Site Address 2247 E SOLITUDE CT
Project NameHILLSIDE-Category 3
Customer Number 
ePlanReviewNo
Description
To construct a 3296 sq. ft. two story single family dwelling with a 710 sq. ft. attached two car garage/shop area, a 223 sq. ft. concrete 2nd level deck and concrete patios at rear of structure per approved plan, all engineering and attached requirement lists. Seperate permits will be required for future trellis construction. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area will be maintained. Unless otherwise approved by the Boise City Fire Department, this structure shall be fitted with a modified 13D sprinkler sytem according to their listing requirement. The sprinkler flow alarm shall be attached to the residence smoke detection system. (1st floor 2283 sq. ft.)(2nd floor 1013 sq. ft.) PC #293 DJO SOLAR PROTECTED
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/29/20031/30/20031/30/2003PPASS
DetailsTony Young
letter of compliance issued 1/30/2003 2:27:25 PM
BLD-Grading Inspection1/30/20031/30/20031/30/2003 PASS
DetailsRita DeYoung
Grading and drainage is complete and approved
BLD-Final1/30/20031/30/20031/30/2003PDONE
DetailsTony Young
DOC - Permit Finaled1/30/20031/30/20031/30/2003PPASS
DetailsTony Young
Finaled by inspector at 1/30/2003 3:22:01 PM
BLD-Final1/29/20031/29/20031/29/2003PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/29/2003 at 8:35:14 AM. Contact: ###-####.
BLD-Final1/27/20031/28/20031/28/2003AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/27/2003 at 13:02:59. Contact: ###-####. need elec final and terry recoders sign off for hill side 1/28/2003 11:00:39 AM
BLD-Framing/Rough-in10/4/200210/7/200210/7/2002AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 10/04/2002 at 13:41:53. Contact: ###-####.c/n ok,, ok to cover pending sprinkler pass, and letter from eng. omitting ext. post @ deck 10/7/2002 12:07:22 PM
FIRE-Sprinkler Rough-in10/7/200210/7/200210/7/2002PPART
DetailsRick Jackson
okay to cover
BLD-Framing/Rough-in9/25/20029/27/20029/27/2002PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/25/2002 at 14:04:42. Contact: ###-####.c/n on site ok to insulate 9/27/2002 2:08:36 PM
BLD-Wall cover9/5/20029/9/20029/9/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/05/2002 at 11:01:29. Contact: ###-####. ok to side 9/9/2002 3:14:31 PM
BLD-Foundation6/26/20026/26/20026/26/2002PPART
DetailsSteven Webb
found robert ###-#### No approved plans--2-#4 bar throughout--including interior footings--pour at own risk. 6/26/2002 2:53:22 PM
BLD-Footing6/21/20026/24/20026/24/2002APART
DetailsRuss Owen
ROBERT ###-####. instructed that contractor clean out a small section of footing at the center rear , otherwise all ok. 6/24/2002 11:37:25 AM
BLD-Grading Inspection6/21/20026/21/20026/21/2002 PASS
DetailsRita DeYoung
Footing subgrade has been approved by the engineer
BLD-Foundation6/19/20026/20/20026/20/2002AFAIL
DetailsTony Young
###-#### ROBERT
no soils report 6/20/2002 10:50:46 AM
Plan assigned to (DJO)6/14/20026/14/20026/14/2002 PASS
DetailsDan Overy
6/14/2002 09:38:39 DJO - activity updated through activity BLDA022 from case BLD02-01130.
PLANS/APPL TAKEN TO FRONT DESK  6/14/2002 DONE
Plan Review Report  6/14/2002 DONE
Inspection Record Card- Bld  6/14/2002 DONE
Telephone call  6/14/2002 DONE
CALLED PERMIT READY AND FEES DUE
Issue & PRINT permit  6/14/2002 DONE
Routing - PLAN CHECK5/23/2002 6/14/2002 PASS
Plans ACCEPTED BY PLAN CHECK  6/14/2002  
Routing - FIRE5/23/20025/23/20025/23/2002 PASS
DetailsBill Alexander
This dwelling shall require a Life Safety, Automatic Fire Sprinkler System, meeting the minimum design/installation requirements of NFPA 13D - 1999. Automatic sprinkler system fire flow alarm devise shall be interconnected to sound alarm notification appliances throughout the dwelling when a fire warning system (smoke detection) is required. A fire permit and approval by the Fire Department is required prior to any system work (which includes underground water supply and overhead piping and appurtenance).
Plan Review Completed(1st rev)  5/23/2002 DONE
Routing - PLANNING5/20/2002 5/23/2002 PASS
Routing - PUBLIC WORKS GRADING5/20/20025/20/20025/20/2002 PASS
DetailsRita DeYoung
Approved as category 3 with conditions of approval in letter attached to plans
Routing - PUBLIC WORKS5/20/2002 5/20/2002 PASS
Routing - PUBLIC WORKS GRADING5/9/2002 5/10/2002 FAIL
DetailsRita DeYoung
house encroaches into rear setback
Application received  5/9/2002