BLD-Final | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/18/2002 at 15:36:09. Contact: .c.c #22613 12/19/2002 11:00:10 AM
|
DOC - Permit Finaled | 12/19/2002 | 12/19/2002 | 12/19/2002 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 12/19/2002 11:00:12 AM
|
BLD-Wall cover | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 13:46:16. Contact: . Prior c/n items not completed-do not cover. 9/11/2002 11:03:09 AM
|
BLD-Framing/Rough-in | 9/6/2002 | 9/6/2002 | 9/6/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 10:10:56. Contact: . C/N posted--ok to insulate 9/6/2002 3:58:34 PM
|
BLD-Other | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 15:05:37. Contact: .
|
BLD-Other | 8/26/2002 | 8/27/2002 | 8/27/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 09:04:22. Contact: . Shear-c/n posted 8/27/2002 2:02:52 PM
|
BLD-Other | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 07:48:40. Contact: . Disp set to [CANC] by a contractor via Hello! on 08/26/2002 at 09:03:25.
|
BLD-Foundation | 7/18/2002 | 7/19/2002 | 7/19/2002 | P | PART |
Steven Webb
|
|
|
MANA; Phone #: ###-#### 95% ready 7/19/2002 4:06:02 PM
|
BLD-Footing | 7/18/2002 | 7/18/2002 | 7/18/2002 | P | PART |
Steven Webb
|
|
|
mana; Phone #: ###-#### wip 7/18/2002 4:11:59 PM
|
BLD-Footing | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | FAIL |
Steven Webb
|
|
|
ft insp chris- ###-#### House was changed from the one approved by P. and Z. Setbacks appear to be a problem with the house on the lot--informed contractor to not pour and re-submit to zoning. 7/11/2002 1:14:59 PM
|
BLD-Framing/Rough-in | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | CANC |
Steven Webb
|
|
|
SHEER WALL ###-#### BOB Wrong address 7/10/2002 2:32:38 PM
|
Issue PAID IN FULL permit | | | 7/8/2002 | | |
|
|
|
|
Plan assigned to (SAM) | 7/1/2002 | | 7/2/2002 | | PASS |
Steve Munroe
|
|
|
7/2/2002 08:33:14 SAM - activity updated through activity BLDA022 from case BLD02-01131.
|
Print Pending Permit.LaserJet4 | | | 7/2/2002 | | |
|
|
|
|
Plan Review Report | | | 7/2/2002 | | |
|
|
|
|
Plan Reviewer's activity | | | 7/2/2002 | | PEND |
|
|
|
Only one set of plans is being approved due to excessive red-lining.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/2/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/2/2002 | | DONE |
|
|
|
permit ready and fees due
|
Pending Assignment by DJO | 5/9/2002 | | 7/2/2002 | | DONE |
Dan Overy
|
|
|
7/2/2002 07:55:53 SAM - activity updated through activity BLDA183 from case BLD02-01131.
|
Routing - PLAN CHECK | 6/20/2002 | | 7/2/2002 | | DONE |
|
|
|
|
Routing - PLANNING | 6/20/2002 | 6/20/2002 | 6/20/2002 | | PASS |
|
|
|
Discussed porch encraochment with designer--advised next site plan to indicate wall vs. dwelling structure. PASSed after discussing the placement of porch post. AKT
|
Routing - PUBLIC WORKS | 6/20/2002 | | 6/20/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 6/19/2002 | 6/19/2002 | 6/19/2002 | | FAIL |
|
|
|
Left msg. for Bill: Site plan shows porch encroachment, requested redline initial to show column is ok.-akt
|
Routing - PLANNING | 5/9/2002 | | 6/19/2002 | | FAIL |
|
|
|
Left msg. 5/10 for Bill Thorton re: failed plan due to incorrect rear setback.
|
Plan Reviewer's activity | | | 6/14/2002 | | DONE |
|
|
|
Received a fax from Dan Foutz (Brighton) request time extension until June 24th. I told him this was okay. (Marlene)
|
Plan Reviewer's activity | | | 6/6/2002 | | DONE |
|
|
|
Sent letter to Bill Thornton to notify him that plan changes reflecting zoning issues must be resubmitted 10 days from the date of the letter (6/6/2002) or plans would be voided and admin fees charged.
|
Application received | | | 5/9/2002 | | |
|
|
|
|