Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-01148
StatusFinaled
Name CALVARY CHAPEL (BLD C)
Site Address 205 S AUTO DR
Project Name 
Customer Number 
ePlanReviewNo
Description
(CALVARY CHAPEL - BUILDING "C") This building is fire sprinklered to mitigate low fire flows and remotely located fire hydrants. To convert a former 5,640 square foot auto body repair shop to church classrooms. A Men's restroom and a Women's restroom, accessible to the disabled, are being constructed in the place of an existing restroom. Work is to include exterior doors and windows, interior nonbearing walls, one riser platforms, and exterior landings all per approved drawings and plan review conditions on file. If mechanical equipment is provided on the mezzanine, a fixed ladder complying with the 1997 UMC shall be provided for access. The mezzanine is NOT approved for any use other than mechanical equipment. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/24/2009 DONE
Fee Review-notes5/10/20025/10/20028/10/2004 DONE
CHANGE STATUS TO (FNL)  12/15/2003 DONE
Fee Review-notes7/24/20037/24/20037/24/2003 DONE
First Notice 7/15/20037/15/2003 DONE
Permanent occupancy  7/15/2003 DONE
Perm. Occ. Cert. #9720 issued 7-15-03 to Cavary Chapel, Bldg. C.
BLD-Final6/17/20036/18/20036/18/2003APASS
DetailsRuss Owen
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreok perm oc ele and plm permit numbers are on job card and have been finaled. 6/18/2003 1:42:56 PM
Permanent Occupancy 6/18/20036/18/2003 DONE
Details
BLD-Conference6/12/20036/12/20036/12/2003ADONE
DetailsRuss Owen
person named craig called me ,about the correction i left for the new rear door, appearantly he talked with architect and the architect told him how he wanted landing constructed I guess he did not like what arcitect told him , wanted to run something by me I replied do as your architect requested it is his project, I do not desing ramps only check to see that max slope would be 1/4 to foot as written. 6/12/2003 10:13:55 AM
BLD-Final6/10/20036/11/20036/11/2003PPASS
DetailsRuss Owen
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. This is ok for a temp oc, have 2 items one to remove the cabinet from hallway at rest room other to maintain 1/4 in per foot max slope at new rear eixt door. Note mechanical work done under mec 01-03226. 6/11/2003 5:19:12 PM
FIRE-Final Inspection6/9/20036/10/20036/10/2003APASS
DetailsTroy Cobbley
steve; Phone #: ###-#### Fire life safety finaled. Structural to verify that the janitor closet door hardware gets changed out to approved type 6/10/2003 1:53:08 PM
FIRE-Final Inspection6/5/20036/6/20036/6/2003ACANC
DetailsRick Jackson
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore per Troy this will be rescheduled 6/6/2003 5:10:47 PM
BLD-Final6/5/20036/6/20036/6/2003PCANC
DetailsRuss Owen
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. needs fire life safety 6/6/2003 2:04:19 PM
FIRE-Final Inspection5/29/20035/30/20035/30/2003AFAIL
DetailsTroy Cobbley
STEVE; Phone #: ###-#### Door hardware has not been changed and the duct smoke detectors did not shut down the hvac units 5/30/2003 9:20:30 AM
Code Occupancy Approval5/27/20035/23/20035/23/2003PPASS
DetailsScott M.Brown
LOOKS OK SO FINAL SIGNED OFF. 5/27/2003 12:12:10 PM
BLD-Conference5/21/20035/21/20035/21/2003PPART
DetailsRuss Owen
I talked with Steve C and he is having fire life saftey and zoning out to inspect appears plumbing and ele has been approved. 5/22/2003 9:47:13 AM
BLD-Final5/20/20035/21/20035/21/2003ACANC
DetailsRuss Owen
steve; Phone #: ###-#### Internet Inspection Request from: Barbara MooreI talked with Steve and informed him to get all required signatures on card then I could come out as I have allready done a general walk thru with him. 5/20/2003 5:01:33 PM
FIRE-Final Inspection5/20/20035/20/20035/20/2003PFAIL
DetailsTroy Cobbley
install the missing canopies on the sprinkler pendants, move the foosball table that is obstructing the exit door, provide city approved fire sprinkler plans per review note #1, provide verification that a fire sprinkler monitoring system is not required, provide building address per review note #5, post sign at point of entry per review note #4, the fire extinguisher in classroom 101 is mounted too high see review note #6, provide information for cfm ratings on the hvac units for compliance with review note #30 and UMC 608, no storage allowed on the mezzanine per the scope of work comments. 5/20/2003 4:27:07 PM
BLD-Conference4/7/20034/7/20034/7/2003ADONE
DetailsRuss Owen
Meet on site with George Slain and Steve Carlson. The building has no CO. The tenants have been given both a 5 day notice on 1/24/03 and 25 day on 2/3/03. Now we have instructed them to submit to the director a letter of intent for all violations on property, also to check with the plan review dept and related office personel for any questions that they may have. 4/7/2003 11:29:31 AM
Print Occupancy Form  1/10/2003 DONE
BLD-Framing/Rough-in7/8/20027/9/20027/9/2002APART
DetailsRuss Owen
CRYUS ###-####. ok to cover. ceiling fans above restrooms have been connected ok.S7/9/2002 12:03:41 PM 7/9/2002 12:04:08 PM
BLD-Framing/Rough-in7/3/20027/8/20027/8/2002AFAIL
DetailsRuss Owen
STEVE ###-#### // CELL # ###-####c/n posted also needs electrical and mechanical approved. 7/8/2002 5:22:21 PM
BLD-Framing/Rough-in7/2/20027/3/20027/3/2002AFAIL
DetailsRuss Owen
###-#### steve . No plans at the site left ac/n posted to provide plans alsocalled this number no answer. 7/3/2002 10:50:45 AM
Issue PAID IN FULL permit  6/6/2002 DONE
Inspection Record Card- Bld  6/4/2002 DONE
Print Occupancy Form  6/4/2002 DONE
Telephone call  6/4/2002 DONE
Routing - FIRE6/3/20026/3/20026/3/2002 PASS
DetailsBill Alexander
Re-review of hydrant spacing and letter on file.
Routing - PLAN CHECK6/3/2002 6/3/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/3/2002 PASS
Routing - FIRE5/30/2002 6/3/2002 PASS
Plan assigned to (CJW)5/23/2002 6/3/2002 PASS
DetailsCarl Westfall
6/3/2002 15:13:26 CJW - activity updated through activity BLDA022 from case BLD02-01148.
Plan Review Completed(1st rev)  6/3/2002 PASS
Routing - PLAN CHECK5/21/2002 5/30/2002 PASS
UBC plan review started May 29, 2002 and finished the next day. The drawings were approved with conditions. See the conditions list.
Routing - PLUMBING5/15/2002 5/20/2002 PASS
Routing - PLANNING5/14/2002 5/15/2002 PASS
Approve per DRH01-165
Plan resubmittals received  5/15/2002 DONE
Received two copies of resubmittal sheet "C-2 of 4". Placed with plans.
Routing - PUBLIC WORKS5/13/2002 5/14/2002 PASS
Plans ACCEPTED BY PLAN TECH  5/13/2002 DONE
Called Lee Rice, no plumbing plans required since the plumbing for the new restroom will tap into existing restroom next door.
Application received  5/10/2002  
Recd Pcfee & Taken To Pln CK  5/10/2002