Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/7/2004 | 4/26/2005 | | DONE |
|
|
|
|
Fee Review-notes | 5/13/2002 | 5/13/2002 | 8/10/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/7/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10124 issued 5-7-04 to the Silver Lake Apartments.
|
FIRE-Final Inspection | 5/5/2004 | 5/6/2004 | 5/6/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled. All smoke detectors tested 5/6/2004 9:24:12 AM
|
BLD-Final | 5/5/2004 | 5/6/2004 | 5/6/2004 | P | PASS |
Tony Young
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Permanent Occupancy | | 5/6/2004 | 5/6/2004 | | DONE |
|
|
|
|
Code Occupancy Approval | 5/5/2004 | 5/5/2004 | 5/5/2004 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 5/5/2004 11:53:46 AM
|
BLD-Aging Inspection | 4/21/2004 | 4/21/2004 | 4/21/2004 | | NR |
Tony Young
|
|
|
|
FIRE-Final Inspection | 1/30/2004 | 2/2/2004 | 2/2/2004 | P | CANC |
Troy Cobbley
|
|
|
###-#### bob
|
BLD-Final | 1/30/2004 | 2/2/2004 | 2/2/2004 | P | PART |
Tony Young
|
|
|
bob
temp occ ok, need stair protection, handrail in ADA restrooms, etc 2/2/2004 4:05:42 PM
|
BLD-Aging Inspection | 1/21/2004 | 1/21/2004 | 1/21/2004 | | CANC |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/10/2003 | 11/10/2003 | 11/10/2003 | | PASS |
Tony Young
|
|
|
wip 11/10/2003 10:27:11 AM
|
BLD-Conference | 9/9/2003 | 9/10/2003 | 9/10/2003 | A | PASS |
Tony Young
|
|
|
see bob
ok, wip 9/10/2003 10:47:43 AM
|
BLD-Aging Inspection | 9/8/2003 | 9/8/2003 | 9/8/2003 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 6/25/2003 | 6/26/2003 | 6/26/2003 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 6/24/2003 | 6/25/2003 | 6/25/2003 | A | PASS |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
c/n made ok 6/25/2003 10:10:52 AM
|
BLD-Framing/Rough-in | 6/20/2003 | 6/23/2003 | 6/23/2003 | P | PART |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
c/n posted,, ok to insulate 6/23/2003 4:39:41 PM
|
Case Summary (BLD) | | | 6/16/2003 | | |
|
|
|
|
BLD-Conference | 5/2/2003 | 5/5/2003 | 5/5/2003 | A | PART |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need to follow plans 5/5/2003 4:37:14 PM
|
BLD-Conference | 5/5/2003 | 5/5/2003 | 5/5/2003 | P | PASS |
Tony Young
|
|
|
w/ engineer
need to follow plans 5/5/2003 4:43:44 PM
|
BLD-Framing/Rough-in | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | PART |
Tony Young
|
|
|
rocky shear nail; Phone #: ###-#### Internet Inspection Request from: Darla Downs
ext. shear ok 4/22/2003 4:38:00 PM
|
BLD-Conference | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | DONE |
Tony Young
|
|
|
rocky; Phone #: ###-#### Internet Inspection Request from: Darla Downs
firewall nailing, etc. need to nail per schedule and use proper nails per plan, need arch. clarification on connection of corridor 3/28/2003 2:07:40 PM
|
BLD-Conference | 3/19/2003 | 3/19/2003 | 3/19/2003 | P | PART |
Tony Young
|
|
|
ROCKY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
need clarification from architect on frame details 3/20/2003 9:37:52 AM
|
BLD-Foundation | 3/6/2003 | 3/6/2003 | 3/6/2003 | P | PART |
Tony Young
|
|
|
manuel; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip 3/7/2003 9:09:56 AM
|
BLD-Footing | 3/4/2003 | 3/5/2003 | 3/5/2003 | A | PART |
Tony Young
|
|
|
###-####
|
BLD-Conference | 2/28/2003 | 3/3/2003 | 3/3/2003 | A | PART |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
conf. on paper work, changes in shear, ok w/ new engineering 3/3/2003 11:19:01 AM
|
Plan resubmittals received | | | 2/25/2003 | | DONE |
|
|
|
Received one copy of 8 x 111/2 size resubmittal for shear walls on both eType 1 & B floor plans for the use of 5/8 sheet rock in place of wood sheathing wherever possible. Routed to Mike P. kmm
|
Issue PAID IN FULL permit | | | 1/15/2003 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/15/2003 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 1/9/2003 | | DONE |
|
|
|
per tim hogland extend permit to 3/13/03/mls
|
Telephone call | | | 10/29/2002 | | DONE |
|
|
|
left mess for bob erland that permits need to be picked up by 12/31/02 per linda hartwell/mls
|
Inspection Record Card- Bld | | | 7/22/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/22/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Routing - PLANNING | 7/18/2002 | | 7/19/2002 | | PASS |
|
|
|
Approve per DRH02-92.
|
Routing - PLAN CHECK | 7/19/2002 | | 7/19/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/19/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/19/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 5/13/2002 | | 7/19/2002 | | PASS |
Mike Phillips
|
|
|
7/19/2002 16:36:36 M_P - activity updated through activity BLDA022 from case BLD02-01155.
|
Routing - PLAN CHECK | 7/11/2002 | | 7/18/2002 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Routing - PLUMBING | 7/3/2002 | | 7/10/2002 | | PASS |
|
|
|
min. 54 gph 1st. hour rating required on the water heaters, verify thermol expantion protection sizing prior to installation.
|
Plan resubmittals received | | | 7/9/2002 | | DONE |
|
|
|
Received two copies of revised sheets, C,LS1, 1-2, A1, A2, A3, A4, A5, A6, A7, A8, A9, B1, B2, B3, B4, B5, B6, B7, B8, B9, B10, B11, B12, D-1, D-2, D-3, P0.2, P1.1, P2.1, M1.1, M1.2, M2.1, M2.2, M2.3, two copies of additional information and two copies of written responses to plan review comments. Roued to Mike P. kmm
|
Routing - PLAN CHECK | 6/25/2002 | | 7/3/2002 | | |
|
|
|
Routed to plumbing.
|
Plan resubmittals received | | | 7/3/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets P0.2, P1.1, P2.1. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 6/21/2002 | 5/28/2002 | 6/25/2002 | | PASS |
|
|
|
Route to PW after 5/24/02 resubmittals are incorporated into plans.
|
Routing - FIRE | 6/18/2002 | | 6/21/2002 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 6/21/2002 | | FAIL |
|
|
|
|
Case Summary (BLD) | | | 6/18/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 6/4/2002 | | 6/18/2002 | | FAIL |
|
|
|
Plan review completed sent correction report to architect requesting additional information to be submitted for further review prior to issuing permit.
|
Routing - PLUMBING | 5/29/2002 | | 6/4/2002 | | FAIL |
|
|
|
|
Routing - PLANNING | 5/23/2002 | | 5/29/2002 | | FAIL |
|
|
|
Grading and landscape plans do not work together.
|
Plan resubmittals received | | | 5/24/2002 | | DONE |
|
|
|
Received two copies of resubmittal sheets S1 and S2. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 5/14/2002 | | 5/23/2002 | | FAIL |
|
|
|
Design sewer to avoid service to Dorsey Music. Per J. Johnson
Requires Drainage plan revision. Per Brian Murphy
|
Routing - PLANNING Land Div | 5/14/2002 | | 5/14/2002 | | PASS |
|
|
|
|
Application received | | | 5/13/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/13/2002 | | DONE |
|
|
|
|