Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/25/2004 | 4/26/2005 | | DONE |
|
|
|
|
Fee Review-notes | 5/13/2002 | 5/13/2002 | 8/10/2004 | | DONE |
|
|
|
|
Permanent Occupancy | | 6/25/2004 | 6/25/2004 | | DONE |
|
|
|
|
BLD-Final | 6/24/2004 | 6/25/2004 | 6/25/2004 | P | PASS |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok for perm c of o 6/25/2004 1:45:15 PM
|
FIRE-Final Inspection | 6/25/2004 | 6/25/2004 | 6/25/2004 | A | PASS |
Rick Jackson
|
|
|
|
Permanent occupancy | | | 6/25/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10203 issued 6-25-04 to the Silver Lake Apartments.
|
FIRE-Final Inspection | 6/2/2004 | 6/3/2004 | 6/3/2004 | A | PASS |
Rick Jackson
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes All items for life safety okay; awaiting alarm sprinkler monitoring 6/3/2004 10:48:10 AM
|
BLD-Final | 6/2/2004 | 6/3/2004 | 6/3/2004 | P | NR |
Tony Young
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
need fire sign-offs 1st 6/3/2004 4:29:43 PM
|
FIRE-Final Inspection | 5/26/2004 | 5/27/2004 | 5/27/2004 | P | FAIL |
Troy Cobbley
|
|
|
No actual inspections were done. At the start of the fire sprinkler inspection I found that a different backflow preventor has been installed. Verification of friction loss is needed. Need NFPA 25. Provide verification that exposed cpvc sprinkler piping in the riser room is ok. Also per inspector 409 the fire sprinkler plans need to be resubmitted which has not been done yet according to the history available on the computer. Fire alarm plans need to be resubmitted due to changes in zones and notification circuitry. 5/27/2004 3:34:05 PM
|
BLD-Final | 5/24/2004 | 5/26/2004 | 5/26/2004 | A | NR |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 5/24/2004 | 5/25/2004 | 5/25/2004 | P | CANC |
Troy Cobbley
|
|
|
bob; Phone #: ###-#### Bob stated that the fire alarm contractor was not finished yet 5/25/2004 4:39:56 PM
|
Code Occupancy Approval | 5/5/2004 | 5/5/2004 | 5/5/2004 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 5/5/2004 11:54:08 AM
|
BLD-Conference | 4/28/2004 | 4/29/2004 | 4/29/2004 | A | PART |
Tony Young
|
|
|
see Bob Erland about aging
just about there 4/29/2004 12:37:17 PM
|
BLD-Aging Inspection | 4/28/2004 | 4/28/2004 | 4/28/2004 | | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 2/4/2004 | 2/4/2004 | 2/4/2004 | | DONE |
|
|
|
Drainage project complete, signed off 2/2/04. D.Erskine
|
BLD-Aging Inspection | 1/27/2004 | 1/27/2004 | 1/27/2004 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 10/21/2003 | 10/22/2003 | 10/22/2003 | A | CANC |
Tony Young
|
|
|
BOB
|
BLD-Conference | 10/22/2003 | 10/22/2003 | 10/22/2003 | P | PART |
Tony Young
|
|
|
apartments, bob earland
will need car port permits when ready 10/23/2003 10:15:06 AM
|
BLD-Conference | 10/17/2003 | 10/17/2003 | 10/17/2003 | P | PASS |
Tony Young
|
|
|
see bob earland
ok to keep going 10/20/2003 9:42:52 AM
|
BLD-Aging Inspection | 10/16/2003 | 10/16/2003 | 10/16/2003 | | CANC |
Tony Young
|
|
|
|
BLD-Energy code compliance | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | PASS |
Tony Young
|
|
|
###-#### bob
|
BLD-Framing/Rough-in | 8/5/2003 | 8/6/2003 | 8/6/2003 | P | PASS |
Tony Young
|
|
|
BOB; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Case Summary (BLD) | | | 6/16/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 6/16/2003 | | |
|
|
|
|
BLD-Conference | 5/2/2003 | 5/5/2003 | 5/5/2003 | A | PART |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need to follow plans 5/5/2003 4:36:35 PM
|
BLD-Conference | 5/5/2003 | 5/5/2003 | 5/5/2003 | P | PASS |
Tony Young
|
|
|
w/ engineer on fire assbly
follow plans 5/5/2003 4:44:16 PM
|
BLD-Framing/Rough-in | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | PART |
Tony Young
|
|
|
rocky shear nail; Phone #: ###-#### Internet Inspection Request from: Darla Downs
exterior shear ok 4/22/2003 4:43:46 PM
|
BLD-Conference | 2/28/2003 | 3/3/2003 | 3/3/2003 | A | PART |
Tony Young
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
conf. on paperwork, also need to check on 1 hour fire doors vs. 20 min. ,, changes in shear,, ok w/ new engineering 3/3/2003 11:24:14 AM
|
BLD-Foundation | 2/26/2003 | 2/26/2003 | 2/26/2003 | P | PART |
Tony Young
|
|
|
manuel ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 2/25/2003 | 2/25/2003 | 2/25/2003 | P | PASS |
Dave Hannah
|
|
|
###-####
|
Plan resubmittals received | | | 2/25/2003 | | DONE |
|
|
|
Received one copy of 8 x 111/2 size resubmittal for shear walls on both eType 1 & B floor plans for the use of 5/8 sheet rock in place of wood sheathing wherever possible. Routed to Mike P. kmm
|
Issue PAID IN FULL permit | | | 1/15/2003 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 1/9/2003 | | DONE |
|
|
|
per tim hogland extend permit to 3/13/03/mls
|
Telephone call | | | 1/8/2003 | | DONE |
|
|
|
per tim hogland has an extension on permit until july 23-02/mls
|
Telephone call | | | 10/29/2002 | | DONE |
|
|
|
talked mess for bob erland that permits need to be picked up by dec 31st or will start over per linda h./mls
|
Inspection Record Card- Bld | | | 7/22/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/22/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Routing - PLANNING | 7/18/2002 | | 7/19/2002 | | PASS |
|
|
|
Approve per DRH02-92.
|
Routing - PLAN CHECK | 7/19/2002 | | 7/19/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/19/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/19/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/19/2002 | | 7/19/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/19/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/19/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 5/13/2002 | | 7/19/2002 | | PASS |
Mike Phillips
|
|
|
7/19/2002 16:30:38 M_P - activity updated through activity BLDA022 from case BLD02-01157.
|
Routing - PLAN CHECK | 7/11/2002 | | 7/18/2002 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Routing - PLUMBING | 7/3/2002 | | 7/10/2002 | | PASS |
|
|
|
see bld02-01155 for review comments
|
Plan resubmittals received | | | 7/9/2002 | | DONE |
|
|
|
Received two copies of revised sheets, C,LS1, 1-2, A1, A2, A3, A4, A5, A6, A7, A8, A9, B1, B2, B3, B4, B5, B6, B7, B8, B9, B10, B11, B12, D-1, D-2, D-3, P0.2, P1.1, P2.1, M1.1, M1.2, M2.1, M2.2, M2.3, two copies of additional information and two copies of written responses to plan review comments. Roued to Mike P. kmm
|
Routing - PLAN CHECK | 6/25/2002 | | 7/3/2002 | | |
|
|
|
Routed to plumbing.
|
Plan resubmittals received | | | 7/3/2002 | | DONE |
|
|
|
received two sets of resubmittal sheets P0.2, P1.1, P2.1. routed to mike phillips.
|
Routing - PUBLIC WORKS | 6/21/2002 | 5/28/2002 | 6/25/2002 | | PASS |
|
|
|
Route to PW after 5/24/02 resubmittals are incorporated into plans.
|
Routing - FIRE | 6/18/2002 | | 6/21/2002 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 6/21/2002 | | FAIL |
|
|
|
|
Case Summary (BLD) | | | 6/18/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 6/4/2002 | | 6/18/2002 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional information to be submitted for further review, prior to issuing permit.
|
Routing - PLUMBING | 5/29/2002 | | 6/4/2002 | | FAIL |
|
|
|
|
Routing - PLANNING | 5/23/2002 | | 5/29/2002 | | FAIL |
|
|
|
Grading and landscape plans do not work together.
|
Plan resubmittals received | | | 5/28/2002 | | DONE |
|
|
|
Received two copies of resubmittal sheets S1 and S2. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 5/14/2002 | | 5/23/2002 | | FAIL |
|
|
|
Design sewer to avoid service to Dorsey Music. Per J. Johnson
Requires Drainage plan revision. Per Brian Murphy
|
Routing - PLANNING Land Div | 5/14/2002 | | 5/14/2002 | | PASS |
|
|
|
|
Application received | | | 5/13/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/13/2002 | | DONE |
|
|
|
|