Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01157
StatusFinaled
Name SILVER LAKE APARTMENTS
Site Address 3323 N LAKEHARBOR LN
Project NameSILVER LAKE APARTMENTS
Customer Number 
ePlanReviewNo
Description
(Building B) - To construct a new 16,416 sq.ft. three story, wood framed, 18 unit apartment building. The first floor is 7,506 sq.ft. and the second floor is 7,080 sq.ft. and the third floor is 1,830 sq.ft. NOTE: This building is fire sprinklered per NFPA 13-R. All construction per the approved plans and attached comment list. PC #310-02 DRH01-00233 SS CUP01-00159 DAA
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 6/25/20044/26/2005 DONE
Fee Review-notes5/13/20025/13/20028/10/2004 DONE
Permanent Occupancy 6/25/20046/25/2004 DONE
Details
BLD-Final6/24/20046/25/20046/25/2004PPASS
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok for perm c of o 6/25/2004 1:45:15 PM
FIRE-Final Inspection6/25/20046/25/20046/25/2004APASS
DetailsRick Jackson
Permanent occupancy  6/25/2004 DONE
Perm. Occ. Cert. # 10203 issued 6-25-04 to the Silver Lake Apartments.
FIRE-Final Inspection6/2/20046/3/20046/3/2004APASS
DetailsRick Jackson
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes All items for life safety okay; awaiting alarm sprinkler monitoring 6/3/2004 10:48:10 AM
BLD-Final6/2/20046/3/20046/3/2004PNR
DetailsTony Young
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
need fire sign-offs 1st 6/3/2004 4:29:43 PM
FIRE-Final Inspection5/26/20045/27/20045/27/2004PFAIL
DetailsTroy Cobbley
No actual inspections were done. At the start of the fire sprinkler inspection I found that a different backflow preventor has been installed. Verification of friction loss is needed. Need NFPA 25. Provide verification that exposed cpvc sprinkler piping in the riser room is ok. Also per inspector 409 the fire sprinkler plans need to be resubmitted which has not been done yet according to the history available on the computer. Fire alarm plans need to be resubmitted due to changes in zones and notification circuitry. 5/27/2004 3:34:05 PM
BLD-Final5/24/20045/26/20045/26/2004ANR
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection5/24/20045/25/20045/25/2004PCANC
DetailsTroy Cobbley
bob; Phone #: ###-#### Bob stated that the fire alarm contractor was not finished yet 5/25/2004 4:39:56 PM
Code Occupancy Approval5/5/20045/5/20045/5/2004APASS
DetailsWm. Michael Meloy
Compliance met. 5/5/2004 11:54:08 AM
BLD-Conference4/28/20044/29/20044/29/2004APART
DetailsTony Young
see Bob Erland about aging
just about there 4/29/2004 12:37:17 PM
BLD-Aging Inspection4/28/20044/28/20044/28/2004 PASS
DetailsTony Young
PubWorks Occupancy Approval2/4/20042/4/20042/4/2004 DONE
Drainage project complete, signed off 2/2/04. D.Erskine
BLD-Aging Inspection1/27/20041/27/20041/27/2004 PASS
DetailsTony Young
BLD-Conference10/21/200310/22/200310/22/2003ACANC
DetailsTony Young
BOB
BLD-Conference10/22/200310/22/200310/22/2003PPART
DetailsTony Young
apartments, bob earland
will need car port permits when ready 10/23/2003 10:15:06 AM
BLD-Conference10/17/200310/17/200310/17/2003PPASS
DetailsTony Young
see bob earland
ok to keep going 10/20/2003 9:42:52 AM
BLD-Aging Inspection10/16/200310/16/200310/16/2003 CANC
DetailsTony Young
BLD-Energy code compliance8/11/20038/12/20038/12/2003APASS
DetailsTony Young
###-#### bob
BLD-Framing/Rough-in8/5/20038/6/20038/6/2003PPASS
DetailsTony Young
BOB; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Case Summary (BLD)  6/16/2003  
Case Summary (BLD)  6/16/2003  
BLD-Conference5/2/20035/5/20035/5/2003APART
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need to follow plans 5/5/2003 4:36:35 PM
BLD-Conference5/5/20035/5/20035/5/2003PPASS
DetailsTony Young
w/ engineer on fire assbly
follow plans 5/5/2003 4:44:16 PM
BLD-Framing/Rough-in4/22/20034/22/20034/22/2003PPART
DetailsTony Young
rocky shear nail; Phone #: ###-#### Internet Inspection Request from: Darla Downs
exterior shear ok 4/22/2003 4:43:46 PM
BLD-Conference2/28/20033/3/20033/3/2003APART
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
conf. on paperwork, also need to check on 1 hour fire doors vs. 20 min. ,, changes in shear,, ok w/ new engineering 3/3/2003 11:24:14 AM
BLD-Foundation2/26/20032/26/20032/26/2003PPART
DetailsTony Young
manuel ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing2/25/20032/25/20032/25/2003PPASS
DetailsDave Hannah
###-####
Plan resubmittals received  2/25/2003 DONE
Received one copy of 8 x 111/2 size resubmittal for shear walls on both eType 1 & B floor plans for the use of 5/8 sheet rock in place of wood sheathing wherever possible. Routed to Mike P. kmm
Issue PAID IN FULL permit  1/15/2003 DONE
Ready Permit EXTENDED  1/9/2003 DONE
per tim hogland extend permit to 3/13/03/mls
Telephone call  1/8/2003 DONE
per tim hogland has an extension on permit until july 23-02/mls
Telephone call  10/29/2002 DONE
talked mess for bob erland that permits need to be picked up by dec 31st or will start over per linda h./mls
Inspection Record Card- Bld  7/22/2002 DONE
Print Occupancy Form  7/22/2002 DONE
Telephone call  7/22/2002 DONE
PERMIT READY AND FEES DUE
Routing - PLANNING7/18/2002 7/19/2002 PASS
Approve per DRH02-92.
Routing - PLAN CHECK7/19/2002 7/19/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/19/2002 DONE
Print Pending Permit.LaserJet4  7/19/2002 DONE
Case Summary (BLD)  7/19/2002 DONE
Routing - PLAN CHECK7/19/2002 7/19/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/19/2002 DONE
Print Pending Permit.LaserJet4  7/19/2002 DONE
Case Summary (BLD)  7/19/2002 DONE
Plan assigned to (M_P)5/13/2002 7/19/2002 PASS
DetailsMike Phillips
7/19/2002 16:30:38 M_P - activity updated through activity BLDA022 from case BLD02-01157.
Routing - PLAN CHECK7/11/2002 7/18/2002 PEND
Waiting for others to approve prior to issuing permit.
Routing - PLUMBING7/3/2002 7/10/2002 PASS
see bld02-01155 for review comments
Plan resubmittals received  7/9/2002 DONE
Received two copies of revised sheets, C,LS1, 1-2, A1, A2, A3, A4, A5, A6, A7, A8, A9, B1, B2, B3, B4, B5, B6, B7, B8, B9, B10, B11, B12, D-1, D-2, D-3, P0.2, P1.1, P2.1, M1.1, M1.2, M2.1, M2.2, M2.3, two copies of additional information and two copies of written responses to plan review comments. Roued to Mike P. kmm
Routing - PLAN CHECK6/25/2002 7/3/2002  
Routed to plumbing.
Plan resubmittals received  7/3/2002 DONE
received two sets of resubmittal sheets P0.2, P1.1, P2.1. routed to mike phillips.
Routing - PUBLIC WORKS6/21/20025/28/20026/25/2002 PASS
Route to PW after 5/24/02 resubmittals are incorporated into plans.
Routing - FIRE6/18/2002 6/21/2002 PASS
Plan Review Completed(1st rev)  6/21/2002 FAIL
Case Summary (BLD)  6/18/2002  
Routing - PLAN CHECK6/4/2002 6/18/2002 FAIL
Plan review completed, sent correction report to architect requesting additional information to be submitted for further review, prior to issuing permit.
Routing - PLUMBING5/29/2002 6/4/2002 FAIL
Routing - PLANNING5/23/2002 5/29/2002 FAIL
Grading and landscape plans do not work together.
Plan resubmittals received  5/28/2002 DONE
Received two copies of resubmittal sheets S1 and S2. Routed to Mike Phillips.
Routing - PUBLIC WORKS5/14/2002 5/23/2002 FAIL
Design sewer to avoid service to Dorsey Music. Per J. Johnson
Requires Drainage plan revision. Per Brian Murphy
Routing - PLANNING Land Div5/14/2002 5/14/2002 PASS
Application received  5/13/2002  
Recd Pcfee & Taken To Pln CK  5/13/2002 DONE