Permit NumberBLD02-01177
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 732 N TROUTNER WAY
Project NameHILLSIDE-Category 3
Customer Number 
ePlanReviewNo
Description
To construct a 2678 sq. ft. two story single family dwelling with a 895 sq. ft. attached three car garage, a 160 sq. ft. covered concrete entry porch and a 193 sq. ft. concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area are required. (1st floor 1499 sq. ft.)(2nd floor 1179 sq. ft.) PC #357 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Grading Inspection2/19/20032/19/20032/19/2003 DONE
DetailsRita DeYoung
GRADING AND DRAINAGE IS CONDIDTIONALLY APPROVED UPON RECEIPT OF A $500.00 BOND.
BLD-Final2/18/20032/18/20032/18/2003PPASS
DetailsDave Hannah
justin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Bond posted c.c # 23787 issued 2/18/2003 2:53:48 PM
DOC - Permit Finaled2/18/20032/18/20032/18/2003PPASS
DetailsDave Hannah
Finaled by inspector at 2/18/2003 2:53:50 PM
BLD-Final2/11/20032/12/20032/12/2003PFAIL
DetailsDave Hannah
###-#### c/n on site 2/12/2003 3:57:04 PM
BLD-Conference2/11/20032/11/20032/11/2003PPASS
DetailsCarl Dependahl
w/ Justin Jayo...need PUB WKS. & eng's grading approvals for final 2/11/2003 4:36:15 PM
BLD-Framing/Rough-in11/12/200211/12/200211/12/2002PPASS
DetailsDave Hannah
shane--shear interior; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie int shear ok 11/12/2002 3:35:23 PM
BLD-Energy code compliance11/6/200211/7/200211/7/2002ANR
DetailsDave Hannah
SHANE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Energy code compliance11/7/200211/7/200211/7/2002PPART
DetailsCarl Dependahl
need to install int shear panels...mec-check? 11/8/2002 1:11:15 PM
BLD-Framing/Rough-in11/5/200211/5/200211/5/2002PPASS
DetailsDave Hannah
shane ###-#### all c/n items completed ok to insulate 11/5/2002 2:44:37 PM
BLD-Framing/Rough-in10/22/200210/22/200210/22/2002PFAIL
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Framing/Rough-in10/11/200210/11/200210/11/2002PPART
DetailsTony Young
###-####
ext. shear ok 10/11/2002 3:54:50 PM
BLD-Framing/Rough-in10/8/200210/9/200210/9/2002AFAIL
DetailsTony Young
###-####
c/n posted on shear 10/9/2002 12:40:19 PM
BLD-Framing/Rough-in10/9/200210/9/200210/9/2002PCANC
DetailsTony Young
shear ###-####
BLD-Foundation8/12/20028/13/20028/13/2002PPART
DetailsTony Young
###-####
wip 8/13/2002 2:05:22 PM
BLD-Footing8/8/20028/12/20028/12/2002PPASS
DetailsDave Hannah
BILL ###-####
BLD-Footing8/7/20028/8/20028/8/2002PCANC
DetailsRuss Owen
###-#### BILL CALLED TO CANC THIS INSPECTION 8-8-02 AND WILL RE CALL FOR 8-9-02
BLD-Grading Inspection8/1/20028/1/20028/2/2002 PASS
DetailsRita DeYoung
Geotech engineer has approved the footing subgrade.
BLD-Footing7/23/20027/24/20027/24/2002ACANC
DetailsDave Hannah
; Phone #: ###-#### BILL CALLED TO CANC THIS INSPECTION NOT READY
Inspection Record Card- Bld  7/11/2002 DONE
Telephone call  7/11/2002 DONE
permit ready and fees due
Issue PAID IN FULL permit  7/11/2002 DONE
Plan assigned to (DJO)7/9/20027/9/20027/10/2002 PASS
DetailsDan Overy
7/10/2002 16:41:15 DJO - activity updated through activity BLDA022 from case BLD02-01177.
Plan Reviewer's activity  7/10/2002 DONE
have red lined plans to match engineered foundation plan with architectural plan, marked in additional bearing that was missing and have allowed tall wall engineering to be provided at frame inspection.
PLANS/APPL TAKEN TO FRONT DESK  7/10/2002 DONE
Plan Review Report  7/10/2002 DONE
Plan Reviewer's activity  7/9/2002 PEND
have called both designer and contractor about missing bearing, possible overheight wall areas and engineered foundation not matching architectural foundation. no one available. left message,
Plans ACCEPTED BY PLAN CHECK  7/9/2002  
Routing - FIRE6/20/2002 6/20/2002 DONE
No fire sprinklers required for this Northridge #5 subdivision
Routing - PLANNING6/18/2002 6/19/2002 PASS
Routing - PUBLIC WORKS6/7/2002 6/18/2002 PASS
Routing - PUBLIC WORKS GRADING5/14/2002 6/17/2002 PASS
DetailsRita DeYoung
Plans resubmitted and approved as category 3 with conditions of approval in letter attached to plans. Needs Category 2 Hillside approval before grading can be approved.
CHANGE STATUS TO (PND)  6/7/2002 DONE
Plans redesigned and resubmitted to change from Category 2 to a Category per Terry Records. Begin new routing sequence. (MSouthard)
VOIDED CHANGE STATUS  5/21/2002 DONE
void per marlene as a Category 2 has to go through a public hearing.
Routing - PUBLIC WORKS5/20/2002 5/20/2002 FAIL
Application received  5/14/2002  
Routing - PLAN CHECK6/21/2002