Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD02-01195
StatusFinaled
Name TODD CAMPBELL CONST & DEVEL CO LLC
Site Address 7162 W TOBI CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two bathroom 1370 sq. ft. two story single family dwelling (850 sq. ft. first floor/520 sq. ft. second floor) with a attached 435 sq. ft. two car garage and a 64 sq. ft. covered front porch. Per approved plans, engineering and requirement list. This is a shade restricted lot. CUP01-00042 per Sev Jones with Planning and Zoning. PC#282 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/30/20028/30/20028/30/2002PPASS
DetailsTom Arcoraci
###-####
DOC - Permit Finaled8/30/20028/30/20028/30/2002PPASS
DetailsTom Arcoraci
Finaled by inspector at 8/30/2002 3:04:19 PM
BLD-Energy code compliance7/10/20027/11/20027/11/2002ADONE
DetailsTony Young
###-#### todd
BLD-Energy code compliance7/11/20027/11/20027/11/2002APART
DetailsCarl Dependahl
verify attic & rim at final, walls ok 7/11/2002 9:47:51 AM
BLD-Framing/Rough-in7/11/20027/11/20027/11/2002APASS
DetailsCarl Dependahl
c/n ok 7/11/2002 9:48:05 AM
BLD-Framing/Rough-in7/10/20027/10/20027/10/2002PNR
DetailsCarl Dependahl
###-####
BLD-Framing/Rough-in7/9/20027/9/20027/10/2002PFAIL
DetailsCarl Dependahl
###-#### todd c/n, draft stops; exh. ducts, insul at rim, etc; ok to insul only. 7/10/2002 10:12:42 AM
BLD-Framing/Rough-in7/2/20027/3/20027/3/2002APART
DetailsTony Young
SHEAR ###-####
ext shear ok 7/3/2002 11:01:04 AM
Issue PAID IN FULL permit  6/11/2002  
Plan assigned to (SAM)6/5/2002 6/10/2002 PASS
DetailsSteve Munroe
6/10/2002 13:16:05 SAM - activity updated through activity BLDA022 from case BLD02-01195.
Plan Review Report  6/10/2002  
Plan Reviewer's activity  6/10/2002 PEND
6/10/02 8:03 I called and left a message for Darrin Peterson with AHJ to call me regarding a couple of shear wall on this plan.
PLANS/APPL TAKEN TO FRONT DESK  6/10/2002 DONE
Inspection Record Card- Bld  6/10/2002 DONE
Telephone call  6/10/2002 DONE
spoke with todd campbell permit ready and fee due
Routing - PLAN CHECK5/21/2002 6/10/2002 DONE
Pending Assignment by DJO5/16/2002 6/5/2002 DONE
DetailsDan Overy
6/5/2002 15:42:30 SAM - activity updated through activity BLDA183 from case BLD02-01195.
BLD-Foundation5/30/20025/31/20025/31/2002APART
DetailsCarl Dependahl
###-####...no approved plans...gar.front ftgs not continuous but using Idaho Truss braced frame system, drawings dont show cont ftg...appears to be in per detail. 5/31/2002 9:49:50 AM
BLD-Footing5/28/20025/29/20025/29/2002APART
DetailsRuss Owen
###-#### TODD nothing at the site from the city. 5/29/2002 11:48:45 AM
Early Start Permit  5/28/2002 DONE
Routing - PUBLIC WORKS5/21/2002 5/21/2002 PASS
Routing - PLANNING5/16/2002 5/20/2002 PASS
Approved per CUP01-42
Application received  5/16/2002