Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-01208
StatusFinaled
Name LANCE HOCH CONSTRUCTION
Site Address 1891 S DOE CREEK PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2125 sq. ft. two story single family dwelling with a 847 sq. ft. attached three car garage, a 40 sq. ft. covered entry way and a 270 sq. ft. concrete patio at rear of structure per approved plans, all red-lining and attached requirement lists. (1st floor 1740 sq. ft.)(2nd floor 385 sq. ft.) See comment in condition list. PC #287 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/4/200210/7/200210/7/2002ACANC
DetailsJim Sly
###-#### lance Cancelled by contractor.....called in for PM. 10/7/2002 10:26:28 AM
BLD-Final10/6/200210/7/200210/7/2002PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/06/2002 at 22:06:44. Contact: ###-####. C/C issued. 10/7/2002 3:10:35 PM
DOC - Permit Finaled10/7/200210/7/200210/7/2002PPASS
DetailsJim Sly
Finaled by inspector at 10/7/2002 3:10:53 PM
BLD-Final10/3/200210/4/200210/4/2002PFAIL
DetailsRuss Owen
###-####c/n posted. 10/4/2002 2:06:29 PM
BLD-Energy code compliance8/8/20028/9/20028/9/2002APASS
DetailsRuss Owen
LANCE ; Phone #: ###-####
BLD-Framing/Rough-in8/6/20028/7/20028/7/2002PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/06/2002 at 17:46:41. Contact: ###-####.
BLD-Framing/Rough-in8/2/20028/6/20028/6/2002AFAIL
DetailsRuss Owen
###-####c/n posted. 8/6/2002 11:11:57 AM
BLD-Framing/Rough-in7/23/20027/24/20027/24/2002APASS
DetailsRuss Owen
shear -lance ###-####
BLD-Footing6/14/20026/17/20026/17/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/14/2002 at 11:46:07. Contact: ###-####.no plans on site set back appear ok. 6/17/2002 2:22:26 PM
Issue PAID IN FULL permit  6/12/2002 DONE
Plan assigned to (DJO)6/10/20026/10/20026/10/2002 PASS
DetailsDan Overy
6/10/2002 09:48:36 DJO - activity updated through activity BLDA022 from case BLD02-01208.
Case Summary (BLD)  6/10/2002 DONE
Plan Review Report  6/10/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/10/2002 DONE
Inspection Record Card- Bld  6/10/2002 DONE
Telephone call  6/10/2002 DONE
LEFT MESSAGE PERMIT READY AND FEES DUE
Plans ACCEPTED BY PLAN CHECK  6/10/2002  
Early Start Permit  6/4/2002 DONE
Routing - PLANNING5/16/2002 5/21/2002 PASS
Routing - PUBLIC WORKS5/21/2002 5/21/2002 PASS
Application received  5/16/2002  
Pending Assignment by DJO5/16/2002    
DetailsDan Overy
Routing - PLAN CHECK5/21/2002