Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-01235
StatusFinaled
Name BARBARA BEIER
Site Address 6531 W USTICK RD
Project NameKOREAN BAPTIST CHURCH
Customer Number 
ePlanReviewNo
Description
(Boise Korean Baptist Church) - To construct a new 4,875 sq.ft. church building with sancturary, office, kitchen, meeting room, restrooms and storage area with a 750 sq.ft. covered entry area. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. DRH01-00180 PC#328-02 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2009  
BLD - Request for Extension4/5/20054/6/20064/5/2006 CANC
DetailsTom Arcoraci
###-#### - george - Note: not quite finished with draining/air conditioning/sprinklers and landscaping????? already finaled???????
Second Notice BLD12/5/200512/5/200512/14/2005 DONE
First Notice has not been responded to.///singed off 2004 permit per Jenifer & Rita
First Notice 11/16/200512/5/2005 DONE
PubWorks Occupancy Approval11/16/200511/16/200511/16/2005 DONE
Drainage project complete, signed off 11/16/05. R.Rokovitz
Permanent occupancy  11/16/2005 DONE
Perm. Occ. Cert. # 10803 issued 11-16-05 o the Korean Baptist Church.
BLD-Final11/14/200511/15/200511/15/2005PPASS
DetailsTom Arcoraci
requests 2:30//won; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm when p/w signs
Code Occupancy Approval  11/14/2005  
ALL ITEMS IN PER PLANS APPROVED.
BLD-Final11/1/200511/2/200511/2/2005PNR
DetailsTom Arcoraci
###-#### - cameron Note: parking lot
Temporary occupancy  10/27/2005 PASS
Extended temporary occupancy permit to January 25, 2006.
Telephone call  10/20/2005 DONE
Talked w/Won re: status of occ. cert. & he will write a ltr. requesting extending it.
BLD-Final7/27/20057/29/20057/29/2005APART
DetailsTom Arcoraci
###-#### - won chang Note: please call 1/2 hr prior to inspection ok for temp occ cn issued
Temporary occupancy  7/29/2005 DONE
Temp. Occ. Cert. # 5261 issued 7-29-05 to the Korean Baptist Church.
FIRE-Alarm Testing7/26/20057/27/20057/27/2005PPASS
DetailsTroy Cobbley
Fire life safety finaled
FIRE-Final Inspection7/21/20057/22/20057/22/2005AFAIL
DetailsTroy Cobbley
Repair the three exit signs as marked on plans, provide one additional emergency light as marked on plans. Provide duct smoke detectors as shown on sheet M1. Remote annunciators may be required if inaccessible or over 10' above finish floor.
Extend Permit 180 days6/29/20056/29/20056/29/2005PPASS
DetailsTom Arcoraci
(F) Reprint permit  6/8/2005  
BLD-Conference4/13/20054/13/20054/13/2005PPASS
DetailsTom Arcoraci
please call prior to inspection///meong; Phone #: ###-#### Internet Inspection Request from: Barbara Moore extend foor 90 more days slow progress 4/13/2005 2:57:35 PM
BLD-Aging Inspection3/14/20053/14/20053/14/2005 PASS
DetailsTom Arcoraci
Print Occupancy Form  12/7/2004 DONE
Plan Reviewer's activity  11/23/2004 DONE
Change occupant load from 313 to 188. Missed in plan review follow up.
BLD - Request for Extension11/2/200411/2/200411/2/2004 PASS
DetailsTom Arcoraci
Myong Ching - not quite finished with the church
BLD-Aging Inspection9/8/20049/8/20049/8/2004 NR
DetailsTom Arcoraci
Inspection Record Card- Bld  8/24/2004 DONE
BLD-Wall cover7/9/20047/9/20047/9/2004APASS
DetailsTom Arcoraci
east wall 5/8 x
BLD-Framing/Rough-in6/28/20046/29/20046/29/2004APASS
DetailsTom Arcoraci
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in6/23/20046/24/20046/24/2004APART
DetailsDave Hannah
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles crew needs to add lad suport bracing in over build trusses, needs to install draft stops in attic , needs to sheet rock gable truss east 1hr fire wall along with make sure hvac vent doesnt exceed 15% openning ok to insulate 6/24/2004 9:51:17 AM
BLD-Conference5/27/20046/16/20046/16/2004ACANC
DetailsSteven Webb
ESC
BLD-Conference5/12/20045/26/20045/26/2004ADONE
DetailsSteven Webb
Discussed with Andy--###-####. Pinnacle Eng. is preparing an ESC plan and Andy has secured Int. RP certification. 5/27/2004 1:11:15 PM
BLD - Request for Extension5/12/20045/13/20045/13/2004 PASS
DetailsTom Arcoraci
###-#### myong
BLD-Conference5/12/20045/12/20045/12/2004AFAIL
DetailsSteven Webb
Issued c/notice to Andy. Left message with Andy. Contractor to submit an Construction erosion and sediment plan and secure a esc permit within 2 weeks or a stop work order will be issued. Will follow up. 5/12/2004 11:13:24 AM
BLD-Foundation4/5/20044/6/20044/6/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/5/2004 at 12:20:47 PM. Contact: ###-####.
BLD-Footing3/30/20043/30/20043/30/2004PPASS
DetailsTom Arcoraci
andy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing3/25/20043/26/20043/26/2004ANR
DetailsTom Arcoraci
BLD-Footing3/26/20043/26/20043/26/2004PNR
DetailsTom Arcoraci
BLD-Footing3/24/20043/25/20043/25/2004PNR
DetailsTom Arcoraci
Andy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Aging Inspection2/13/20042/13/20042/13/2004 NR
DetailsTom Arcoraci
BLD-Conference12/1/200312/1/200312/1/2003PPASS
DetailsTom Arcoraci
extend permit slow progress
BLD-Aging Inspection10/20/200310/20/200310/20/2003 NR
DetailsTom Arcoraci
(F) Reprint permit  7/22/2003  
Issue PAID IN FULL permit  7/21/2003 DONE
Plan assigned to (M_P)5/20/20025/20/20023/24/2003 PASS
DetailsMike Phillips
3/24/2003 11:10:38 M_P - activity updated through activity BLDA022 from case BLD02-01235.
Routing - PLANNING Land Div3/21/2003 3/24/2003 PASS
Parcel created prior to October 30, 1965.
Routing - PLAN CHECK3/24/2003 3/24/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/24/2003 DONE
Print Pending Permit.LaserJet4  3/24/2003 DONE
Case Summary (BLD)  3/24/2003 DONE
Inspection Record Card- Bld  3/24/2003  
Print Occupancy Form  3/24/2003  
Telephone call  3/24/2003 DONE
LEFT MESS THAT PERMIT IS READY
Routing - PLANNING3/19/2003 3/21/2003 PASS
Approved per DRH01-180 and as noted on plans.
Routing - PUBLIC WORKS3/6/2003 3/19/2003 PASS
Routing - PLAN CHECK3/5/2003 3/6/2003  
Routing - PUBLIC WORKS2/28/2003 3/4/2003 FAIL
Routing - PLAN CHECK2/13/2003 2/28/2003 PEND
Waiting for others to approve prior to issuing permit.
Routing - PUBLIC WORKS2/6/2003 2/13/2003 FAIL
Need Geotech Report.
Routing - PLANNING1/29/2003 2/6/2003 FAIL
Plans do not comply with Design Review, DRH01-180, conditions of approval.
Routing - PLAN CHECK10/2/2002 1/29/2003  
Plan resubmittals received  1/27/2003 DONE
Received two sets of resubmittal sheets 1, 2, S.1, 3, 4, 5, 6, 7, 8, 8-A, 9, Topographic Survey, C1.0, c1.3, c1.4, c1.5, (2)Structural Calculations, and cover letter. Routed to Mike Phillips.
Routing - PUBLIC WORKS9/30/2002 10/2/2002 FAIL
Requires geotech report. kmm
Routing - PLAN CHECK6/26/2002 9/30/2002  
Routing - FIRE6/21/2002 6/26/2002 PASS
approved without written comment
Routing - PUBLIC WORKS6/26/2002 6/26/2002 FAIL
Requires Drainage Plan-Need Geotech Report
Plan Review Completed(1st rev)  6/26/2002 FAIL
Routing - PLAN CHECK6/6/2002 6/21/2002 FAIL
Plan review completed. Sent correctionreport to architec requesting additional information for further review prior to issuing permit.
Routing - PLUMBING5/31/2002 6/5/2002 PASS
Routing - PLANNING5/29/2002 5/31/2002 FAIL
Plans do not comply with Design Review (DRH01-00130) conditions. The Design Review requires additional landscaping along the west building wall. Landscaping has been provided; however, it needs to be a more upright variety (not lavender) and the specific Dogwoods need to be identified (such as one with a +8' height in order to accent the wall). The original design also indicated a berm with the swale. The berm is no longer proposed; therefore, additional landscaping or fencing or some design features need to be added (see DRH01-00130 condition #5).
Routing - PUBLIC WORKS5/21/2002 5/29/2002 FAIL
Requires drainage plan ACHD ok, Geotech Report, per Brian M. kmm
Routing - PLANNING Land Div5/20/2002 5/21/2002 FAIL
need to clean up land division problems...need deed history or new deeds
Application received  5/20/2002  
Recd Pcfee & Taken To Pln CK  5/20/2002 DONE
Fee Review-notes5/20/20025/20/2002