Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD02-01247
StatusFinaled
Name STOEL RIVES LLP
Site Address 101 S CAPITOL BLVD Unit: 1603
Project NameUS BANK-16TH FLR
Customer Number 
ePlanReviewNo
Description
(STOEL RIVES - US BANK - 16TH FLOOR) This building is fire sprinklered because it is a high-rise. To remodel an existing 1,916 square foot office tenant space on the 16th floor of the US Bank building. Work is to include a 1-hr tenant demising wall with a 20 minute door and a 45 minute side light window. A new suspended ceiling system is also being installed. All work shall comply with the approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Fee Review-notes7/24/20037/24/20037/24/2003 DONE
Additional values from subcontractors.
Permanent Occupancy 8/12/20028/12/2002 DONE
Details
BLD-Final8/8/20028/12/20028/12/2002PDONE
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/08/2002 at 09:34:58. Contact: ###-####.
BLD-Final8/9/20028/12/20028/12/2002APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/09/2002 at 11:26:07. Contact: ###-####. OK for perm Occ. 8/12/2002 9:38:52 AM
Permanent occupancy  8/12/2002 DONE
Perm. Occ. Cert. #9293 issued 8-12-02 to Stoel Rives LLP on the 16th floor of the U.S. Bank Bldg.
BLD-Final8/7/20028/7/20028/7/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/07/2002 at 09:42:04. Contact: ###-####. demising wall ok...add wires & spreaders as req'd. ok t/o. 8/7/2002 2:13:43 PM
BLD-Final8/6/20028/6/20028/6/2002PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/06/2002 at 10:50:18. Contact: ###-####....ok for t/o, need verify demising wall firestops...open grid for insp. 8/6/2002 5:09:10 PM
BLD-Final8/2/20028/2/20028/2/2002PCANC
DetailsJim Storey
DUANE; Phone #: ###-#### carl will do insp. 8/2/2002 4:25:02 PM
BLD-Final8/2/20028/2/20028/2/2002PNR
DetailsCarl Dependahl
DUANE; Phone #: ###-####; RECALL WITH OTHER FINAL INSP (12TH FL.) #...NR. 8/5/2002 11:19:10 AM
FIRE-Final Inspection8/2/20028/2/20028/2/2002PPASS
DetailsRick Jackson
FIRE-Final Inspection8/1/20028/1/20028/1/2002PNR
DetailsRick Jackson
George ###-#### george called and said they won't be ready until 8/2 and they will reschedule 8/1/2002 4:20:15 PM
Issue PAID IN FULL permit  6/20/2002 DONE
Inspection Record Card- Bld  6/14/2002 DONE
Print Occupancy Form  6/14/2002 DONE
Telephone call  6/14/2002 DONE
Plan resubmittals received  6/14/2002 DONE
Received amended Certificate of Value for $21,626; Electrical Value: $1,050; Mechanical Value: $1,500; Fire Sprinkler: $900; Fire Alarm Systems: $600; Plumbing Value: n/a. Okay per Carl Westfall.
Routing - PLAN CHECK6/7/2002 6/13/2002 PASS
Drawings approved with conditions.
PLANS/APPL TAKEN TO FRONT DESK  6/13/2002 PASS
Plan assigned to (CJW)5/24/2002 6/13/2002 PASS
DetailsCarl Westfall
6/13/2002 16:23:49 CJW - activity updated through activity BLDA022 from case BLD02-01247.
Routing - FIRE6/3/20026/7/20026/7/2002 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  6/7/2002 DONE
Routing - PLAN CHECK5/24/2002 6/3/2002  
Failed first UBC review. UBC plan review started May 31, 2002 and finished June 3, 2002. A response from the architect was required. See the conditions list.
First Notice5/21/20025/21/20025/21/2002 DONE
Plans ACCEPTED BY PLAN TECH  5/21/2002 DONE
Application received  5/21/2002  
Recd Pcfee & Taken To Pln CK  5/21/2002