Permit NumberBLD02-01256
StatusFinaled
Name ST ALPHONSUS REG MED CEN INC
Site Address 1055 N CURTIS RD
Project NameST ALS-N TOWER
Customer Number 
ePlanReviewNo
Description
(ST ALPHONSUS-NORTH TOWER-2ND FLR)(PHARMACY) To remodel an existing office area of 3,962 sq.ft. located on the 2nd floor north tower for use as a 'pharmacy administration, receiving, breakdown, distribution & storage area for service to the overall hospital facility per approved plans on file. Work includes selective demolition and new construction of interior non-bearing, non-combustible, fire-resistive walls to create accessible restroom, conference room and work areas; install movable work station furniture; upgrade per clients needs and to meet minimum codes the electrical, plumbing, mechanical, fire-supression & alarm system; and support facilities. NOTE: A certificate of occupancy is required for this tenant. This building is fully sprinklered. PC#02-334/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/29/20037/29/20037/29/2003 DONE
Permanent occupancy  11/5/2002 DONE
Perm. Occ. Cert. #9431 issued 11-5-02 to St. Alphonsus Pharmacy on the 2nd floor.
BLD-Final11/1/200211/4/200211/4/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/01/2002 at 10:33:33. Contact: ###-####. ok for perm 11/4/2002 12:54:09 PM
Permanent Occupancy 11/4/200211/4/2002 DONE
Details
BLD-Conference10/29/200210/30/200210/30/2002ADONE
DetailsTom Arcoraci
done by 340 ok for temp occ 10/30/2002 1:22:46 PM
BLD-Conference10/29/200210/30/200210/30/2002APASS
DetailsCarl Dependahl
w/ mark at site re glazing req's 10/30/02 11:03:48 AM
BLD-Final10/30/200210/30/200210/30/2002AFAIL
DetailsCarl Dependahl
need verify 45 min. glass at door 20234a
FIRE-Final Inspection10/28/200210/29/200210/29/2002APASS
DetailsTroy Cobbley
fire life/safety and fire sprinklers finaled 10/29/2002 8:47:41 AM
BLD-Final10/29/200210/29/200210/29/2002PCANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/29/2002 at 08:50:21. Contact: ###-####....reschedule. 10/29/02 4:58:25 PM
FIRE-Final Inspection10/17/200210/17/200210/17/2002PPART
DetailsTroy Cobbley
temporary occupancy was given on the life/safety due to the temp on the fire sprinkler. All items for the life/safety inspection are ok and can be finaled when the fire sprinklers are finaled 10/17/2002 3:41:47 PM
Override - Parcel Holds  10/17/2002  
Override - Parcel Holds  10/17/2002  
FIRE-Final Inspection10/9/200210/11/200210/11/2002AFAIL
DetailsTroy Cobbley
provide approved door hardware for the restroom and cubicle . Turn exit sign at the east exit 10/11/2002 10:26:35 AM 10/11/2002 10:27:01 AM
BLD-Conference10/9/200210/10/200210/10/2002APASS
DetailsTom Arcoraci
###-#### mark needs s rated doors 10/10/2002 10:27:01 AM
BLD-Conference10/9/200210/10/200210/10/2002APASS
DetailsTom Arcoraci
###-#### mark needs s rated doors 10/10/2002 10:26:05 AM
Override - Parcel Holds  10/9/2002  
Override - Parcel Holds  10/9/2002  
FIRE-Final Inspection9/27/20029/30/20029/30/2002PCANC
DetailsTroy Cobbley
contractor told me to cancel the inspection since I can't sign off the fire/life safety without the the fire alarm being done 9/30/2002 3:16:39 PM
BLD-Wall cover9/3/20029/4/20029/4/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/03/2002 at 16:34:00. Contact: ###-####...efis covered; add, wires & pods at grid....some missed, walls ok. 9/4/2002 6:19:09 PM
BLD-Other9/3/20029/3/20029/3/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/03/2002 at 08:26:32. Contact: ###-####.
BLD-Other8/16/20028/19/20028/19/2002APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/16/2002 at 09:50:51. Contact: ###-####.incapsulate efis foam exposed above ceilling/ seal top of wall at smoke bairror/ ada restaroom fire wall ok for cover. 8/19/2002 9:53:10 AM
BLD-Framing/Rough-in8/13/20028/13/20028/13/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/13/2002 at 10:30:06. Contact: ###-####.non bearing walls have been drywall w-o insp appears ok they will need to call for a re-inspection of fire walls above ceiling before tile. 8/13/2002 4:41:57 PM
Routing - PLAN CHECK6/18/2002 6/18/2002 PASS
Approved as noted and attached plan review comments, all a part of the approved plans.
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  6/18/2002 PASS
Ready to issue.
Print Occupancy Form  6/18/2002 DONE
Inspection Record Card- Bld  6/18/2002 DONE
Telephone call  6/18/2002 DONE
permit ready and fees due
Issue PAID IN FULL permit  6/18/2002 DONE
Plan assigned to (DRS)5/24/2002 6/18/2002 PASS
DetailsDan Stuart
6/18/2002 07:35:55 DRS - activity updated through activity BLDA022 from case BLD02-01256.
Routing - FIRE6/12/2002 6/17/2002 PASS
Plan Review Completed(1st rev)  6/17/2002 PASS
Routing - PLAN CHECK6/6/2002 6/12/2002 PEND
No correction required. routing plans to fire code analyst for review.
Routing - PLUMBING5/31/2002 6/6/2002 PASS
additional cross connection protection may be required
Routing - PUBLIC WORKS5/24/2002 5/31/2002 PASS
First Notice5/22/20025/22/20025/22/2002 DONE
Plans ACCEPTED BY PLAN TECH  5/22/2002 DONE
Application received  5/22/2002  
Recd Pcfee & Taken To Pln CK  5/22/2002 DONE