DOC - Permit Finaled | 12/9/2002 | 12/9/2002 | 12/9/2002 | A | PASS |
Russ Owen
|
|
|
Finaled by inspector at 12/9/2002 9:56:06 AM
|
BLD-Final | 12/5/2002 | 12/6/2002 | 12/6/2002 | A | FAIL |
Russ Owen
|
|
|
###-####
|
BLD-Final | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | PASS |
Russ Owen
|
|
|
|
BLD-Final | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | FAIL |
Russ Owen
|
|
|
LEE; Phone #: ###-#### Internet Inspection Request from: Darla Downsposted c/n. 12/4/2002 1:24:30 PM
|
BLD-Framing/Rough-in | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PASS |
Russ Owen
|
|
|
lee; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Russ Owen
|
|
|
cole crofts; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | FAIL |
Russ Owen
|
|
|
cole crofts; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie.c/n posted, need to meet with builder.. 9/25/2002 2:49:21 PM 9/25/2002 3:03:24 PM
|
BLD-Framing/Rough-in | 9/20/2002 | 9/23/2002 | 9/23/2002 | A | FAIL |
Russ Owen
|
|
|
###-####. need to complete c/n. 9/23/2002 1:42:53 PM
|
BLD-Framing/Rough-in | 9/19/2002 | 9/20/2002 | 9/20/2002 | A | NR |
Jim Sly
|
|
|
Called.....NR 9/20/2002 9:14:45 AM
|
BLD-Framing/Rough-in | 9/19/2002 | 9/19/2002 | 9/19/2002 | P | FAIL |
Jim Sly
|
|
|
C/N posted.
|
BLD-Framing/Rough-in | 9/18/2002 | 9/19/2002 | 9/19/2002 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung--cance per lee
|
BLD-Framing/Rough-in | 9/4/2002 | 9/4/2002 | 9/4/2002 | P | PART |
Russ Owen
|
|
|
lee; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieok to side. 9/4/2002 2:28:01 PM
|
BLD-Framing/Rough-in | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | FAIL |
Russ Owen
|
|
|
###-####c/n posted. 8/29/2002 1:13:59 PM
|
BLD-Foundation | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PART |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 6/21/2002 | 6/24/2002 | 6/24/2002 | P | PART |
Russ Owen
|
|
|
after 3:30 ###-####. wip. 6/24/2002 4:50:47 PM
|
Issue PAID IN FULL permit | | | 6/21/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/4/2002 | | 6/17/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 6/14/2002 | | 6/17/2002 | | PASS |
Steve Munroe
|
|
|
6/17/2002 14:36:05 SAM - activity updated through activity BLDA022 from case BLD02-01277.
|
Plan Reviewer's activity | | | 6/17/2002 | | PEND |
|
|
|
6/17/02 9:10 I called and talked to Darin, the engineer, about wall line "B", concrete lintel and footing for point load. Darin told me the re-bar needs to extend 30 inches either side of opening for the lintel and if the point load is 11000 point to make the footing size 3 foot square. He is faxing new engineering for line "B".
|
Plan Review Report | | | 6/17/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/17/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/17/2002 | | DONE |
|
|
|
CALLED PLANS READY 6-17-02///DLD
|
Pending Assignment by DJO | 5/23/2002 | | 6/14/2002 | | DONE |
Dan Overy
|
|
|
6/14/2002 10:26:51 SAM - activity updated through activity BLDA183 from case BLD02-01277.
|
Routing - PUBLIC WORKS | 6/3/2002 | | 6/4/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 5/31/2002 | 5/31/2002 | 5/31/2002 | | PASS |
|
|
|
Updated to pass status in response to new site plan, reflecting of R-1B setbacks.
|
Routing - PLANNING | 5/23/2002 | | 5/30/2002 | | FAIL |
|
|
|
Called 5/30, left msg. for Kole, site plan must reflect R-1B setback standards rather than R-1C.-AKT
|
Application received | | | 5/23/2002 | | |
|
|
|
|