Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01320
StatusFinaled
Name H & H HOMES LLC
Site Address 160 E SKYLARK DR
Project NameHILLSIDE
Customer Number 
ePlanReviewNo
Description
To construct a 1381 sq. ft. one story single family dwelling with a 1007 sq. ft. unfinished daylight basement, a 678 sq. ft. attached two car garage, a 80 sq. ft. covered entry way and 270 sq. ft. of concrete patio at rear of structure with a 270 sq. ft. partially covered deck above per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area will be required. Note: Seperate permits will be required to finish basement. PC #401 CFH #02-00014 DJO (Excavation conducted under MIS02-00175. No ESC permit required as application received 5/28/2002.)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/20/200211/21/200211/21/2002PPASS
DetailsCarl Dependahl
###-####...lc issued, has $4000 bond for possible variance for "overheight "retaining wall at front set-back... 11/21/02 4:02:03 PM
BLD-Grading Inspection11/21/200211/21/200211/21/2002 BOND
DetailsRita DeYoung
Final grading is complete and approved except for the retaining wall along the driveway. It was not built as approved and requires a variance. The contractor has submitted a $4000.00 bond to rebuild the wallas approved. Grading and drainage is conditionally approved.
DOC - Permit Finaled11/21/200211/21/200211/21/2002PPASS
DetailsCarl Dependahl
Finaled by inspector at 11/21/02 4:02:24 PM
BLD-Conference11/12/200211/15/200211/15/2002ACANC
DetailsCarl Dependahl
FRANK IHIS IS TO MAKE SURE THAT RVERY THING IS OK BEFORE A FINAL IS CALLED FOR; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Foundation11/13/200211/14/200211/14/2002APART
DetailsCarl Dependahl
###-####...ret wall by drive ok 11/14/02 12:40:20 PM
BLD-Final11/14/200211/14/200211/14/2002AFAIL
DetailsCarl Dependahl
c/n, handrails, insul & air seal...other finals, misc finish, carpet, woodstovenot finalled, courtesy inspection only.
BLD-Footing11/13/200211/13/200211/13/2002PPART
DetailsSteven Webb
chris; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip--90% ready--retaining wall footing--per engineering. 11/13/2002 3:37:53 PM
BLD-Energy code compliance10/17/200210/18/200210/18/2002APART
DetailsCarl Dependahl
ok to cover, need r-10 at bsmt concrete walls 10/18/02 5:00:34 PM
BLD-Energy code compliance10/15/200210/17/200210/17/2002PCANC
DetailsJim Storey
FRANK; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time. 10/17/2002 5:25:10 PM
BLD-Framing/Rough-in10/14/200210/15/200210/15/2002PPASS
DetailsTony Young
###-####
BLD-Framing/Rough-in10/7/200210/8/200210/8/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/07/2002 at 19:12:49. Contact: ###-####.ext. shear ok, pending eng. letter 10/8/2002 12:07:02 PM
BLD-Framing/Rough-in10/4/200210/7/200210/7/2002AFAIL
DetailsTony Young
frank shear wall; Phone #: ###-#### Internet Inspection Request from: Darla Downs
c/n posted 10/7/2002 11:15:00 AM
BLD-Foundation8/30/20029/3/20029/3/2002APART
DetailsTony Young
wip, ok to pour when ready 9/3/2002 11:50:01 AM
BLD-Foundation8/29/20028/30/20028/30/2002PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
wip 9/3/2002 11:36:08 AM
BLD-Footing8/22/20028/23/20028/23/2002ANR
DetailsDave Hannah
###-####
BLD-Foundation8/23/20028/23/20028/23/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/23/2002 at 10:00:38. Contact: ###-####.
Issue PAID IN FULL permit  8/16/2002 DONE
Plan assigned to (DJO)7/18/20027/18/20028/15/2002 PASS
DetailsDan Overy
8/15/2002 14:01:47 DJO - activity updated through activity BLDA022 from case BLD02-01320.
PLANS/APPL TAKEN TO FRONT DESK  8/15/2002 DONE
Inspection Record Card- Bld  8/15/2002 DONE
Telephone call  8/15/2002 DONE
PERMIT READY AND FEES DUE
Case Summary (BLD)  8/14/2002 PEND
Plan Review Report  8/14/2002 PEND
BLD-Grading Inspection8/13/20028/13/20028/13/2002 DONE
DetailsRita DeYoung
footing subgrade has been approved by the geotechnical engineer
Plan Reviewer's activity  7/19/2002 PEND
foundation design. excavation permit will be issued to determine exactly where native soil conditions are located. at this time a new engineered foundation plan will be submitted. foundation plan will be drawn to scale, according to engineers design. correct elevation datumn will be incorporated. plans are being placed in pending condition. have contacted contractor (frank hurlbutt), designer (todd henry) and engineer (true engineering).
Plan Reviewer's activity  7/18/2002 PEND
will continue review tomorrow. will need to red-line footings and verify foundation.
Plans ACCEPTED BY PLAN CHECK  7/18/2002  
Routing - FIRE7/8/2002 7/15/2002 DONE
7/11/02 - No information on file. Holding for reply from Dave Miller.
7/15/02 - No fire sprinkler requirements for this subdivision, per DM.
Routing - PLANNING6/21/2002 7/8/2002 PASS
DO NOT ISSUE PERMITS UNTIL 5:00 JULY 8TH (APPEAL PERIOD)
Routing - PLANNING Land Div6/21/20026/21/20026/21/2002 PASS
ros to locate property pins only...no change in lot lines
Routing - PLANNING6/18/2002 6/21/2002 PEND
Sent to Land Division. Sent to Susan for CFH02-00014 approval. kmm
Routing - PUBLIC WORKS6/18/2002 6/18/2002 PASS
Routing - PUBLIC WORKS GRADING5/30/2002 6/18/2002 PASS
DetailsRita DeYoung
Approved as category 1 with with conditions of approval in letter attached to plans. 6/18/02. No foundation information. No designs for retaining walls. grading plan needs revisions.6/7/02
Application received  5/28/2002  
Routing - PLAN CHECK7/15/2002