Fee Review-notes | 7/29/2003 | 7/29/2003 | 7/29/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 2/18/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9559 issued 2-18-03 to Treasure Valley Coffee, Inc. for storage addn.
|
Permanent Occupancy | | 2/14/2003 | 2/14/2003 | | DONE |
|
|
|
|
BLD-Final | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | PASS |
Russ Owen
|
|
|
###-#### or ###-#### jack ok perm oc. 2/14/2003 5:03:02 PM
|
DOC - Permit Finaled | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | PASS |
Scott M.Brown
|
|
|
Finaled by inspector at 2/13/2003 12:08:29 PM
|
FIRE-Final Inspection | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled
|
FIRE-Final Inspection | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | FAIL |
Troy Cobbley
|
|
|
fire life safety items ok but can not final until the fire alarm is finaled 2/12/2003 12:19:02 PM
|
Code Occupancy Approval | 2/12/2003 | 2/12/2003 | 2/12/2003 | A | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED 2/13/2003 1:02:35 PM
|
BLD-Final | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 2/6/2003 at 2:40:29 PM. Needs 2/7/2003 9:32:02 AM called fire/life safety inspector and found out that this has not been finaled by him and there is no contact number and I am at the site but do not know who to contact also could need other finals. 2/7/2003 9:34:33 AM
|
FIRE-Final Inspection | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | CANC |
Troy Cobbley
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/22/2002 | 11/25/2002 | 11/25/2002 | A | PART |
Tom Arcoraci
|
|
|
left over from friday. needs spec insp for bolting 11/25/2002 8:59:02 AM
|
BLD-Framing/Rough-in | 11/22/2002 | 11/22/2002 | 11/22/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/22/2002 at 10:09:09. Contact: ###-####.recalled for monday out of time. 11/22/2002 4:47:50 PM
|
BLD-Foundation | 10/4/2002 | 10/4/2002 | 10/4/2002 | P | PASS |
Dave Hannah
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Footing | 10/3/2002 | 10/3/2002 | 10/3/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/03/2002 at 10:44:16. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 8/30/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/29/2002 | | DONE |
|
|
|
|
Telephone call | | | 8/29/2002 | | DONE |
|
|
|
permit ready and fees due
|
Plan resubmittals received | | | 8/28/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheet A3 with structural calculations and cover letter. routed to Mike Otto.
|
Routing Off Site - STRUCTURAL | 8/28/2002 | | 8/28/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2002 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 6/24/2002 | | 8/28/2002 | | PASS |
Mike Otto
|
|
|
8/28/2002 15:22:37 MLO - activity updated through activity BLDA022 from case BLD02-01350.
|
Routing Off Site - STRUCTURAL | 7/22/2002 | | 8/8/2002 | | FAIL |
|
|
|
Waiting for original plans or building analysis before contacting pdq to take plans to outside eng.
7/22/02 Sending out to outside eng. Still have not recieved building analysis or soils report.
8/8/02 Faxed comments to architect MLO
|
Plan resubmittals requested | | | 8/8/2002 | | DONE |
|
|
|
structural review comments
|
Routing - FIRE | 8/7/2002 | | 8/7/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - FIRE | 7/29/2002 | | 8/2/2002 | | FAIL |
Bill Alexander
|
|
|
Could not see or Architect did not respond to required review notes (07/09/2002), item # 3 (High Piled Storage use) and 5 (Fire Hydrant location).
|
Routing - PLAN CHECK | 7/26/2002 | | 7/29/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/25/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A0, A1, A3, (2) letters from Treasure Valley Engineers, and comment letter. Routed to Mike Otto. 3:45 PM
|
Plans ACCEPTED BY PLAN TECH | | | 7/22/2002 | | DONE |
|
|
|
|
Plan Review Completed(1st rev) | | | 7/9/2002 | | DONE |
|
|
|
|
Routing - FIRE | 7/8/2002 | | 7/9/2002 | | FAIL |
Bill Alexander
|
|
|
Lack correct construction type, occupancy classification, references no sprinklers when fire sprinkler protection is required and fire flows provided, but no (hydrant/s) location provided (incomplete site plan)!
|
Routing - PLAN CHECK | 7/3/2002 | | 7/8/2002 | | FAIL |
|
|
|
corrections mailed and faxed to architect.
|
Plan resubmittals requested | | | 7/8/2002 | | DONE |
|
|
|
UBC corrections
|
Routing - PLANNING | 7/1/2002 | | 7/3/2002 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 6/28/2002 | | 6/28/2002 | | PASS |
|
|
|
Waiver letter received (6/18/02)
Waiver from ESC plan requirements approved with conditions attached to plans. ESC permit is required.
|
Routing - PUBLIC WORKS | 6/27/2002 | | 6/28/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/28/2002 | | DONE |
|
|
|
Received letter from CDH about approving this structure based upon their description as storage for bottled water on pallets. Per Bud Fulleton. Put copies with plans and one in file. kmm
|
Routing - PUBLIC WORKS | 6/25/2002 | | 6/26/2002 | | FAIL |
|
|
|
New Drainage area < 10 %, so no plan required, but new building drainage cannot drain offsite to other property without permission.
|
Routing - PLANNING Land Div | 6/25/2002 | | 6/25/2002 | | PASS |
|
|
|
waiting for new deed and legal description, ROS 5833 (recorded)
rec'd...6/25/02, 2:30 p.m. OK
|
Plans ACCEPTED BY PLAN TECH | | | 6/25/2002 | | PEND |
|
|
|
Still requires 1.Letter from CDH (RECEIVED LETTER FROM CDH 6/27/02)
2.Completed site plan
3.Soils report
4.Original county plans or building analysis.
Contacted Oscar for the above items. kmm
|
Plan routing begun/NEW & ADDTN | | | 6/25/2002 | | DONE |
|
|
|
|
Pending Assignment by JCM | 6/5/2002 | | 6/24/2002 | | DONE |
John Menard
|
|
|
6/24/2002 14:22:36 JCM - activity updated through activity BLDA174 from case BLD02-01350.
|
Plan routing begun/NEW & ADDTN | | | 6/5/2002 | | HOLD |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/5/2002 | | FAIL |
|
|
|
Plans on hold in my hold box. Requires 1. Involved parties sheet to be signed. (signed 6/12/02)
2. Pre-engineered plans ( 3 copies) (Receivd 6/24/02)
3. Third set of plans for outside eng. (Received 6/24/02)
4. ESC plan (2 copies) (Waiver pending 6/14/02) (Waiver letter received 6/18/02)
5. Soils report
6. Original county plans ( Received the addition of 1997 that Oscar did)
7. Site plan needs more information: Building distance to property lines, fire hydrant placement, radius of curves and corners of roads.
Contacted Greg Brown and Oscar. kmm
6/12/02 Received signed involved parties sheet. put with file and plans.
6/18/02 Received waiver letter for ESC plans.
6/24/02 Received three copies of pre-engineered building plans
6/24/02 Received third set of plans for outside eng.
6/24/02 Received one copy of the addition of 1997 that Oscar did.
6/27/02 Received letter from CDH with their approval.
|
First Notice | 6/3/2002 | 6/3/2002 | 6/3/2002 | | DONE |
|
|
|
|
Application received | | | 6/3/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/3/2002 | | |
|
|
|
|