BLD-Final | 12/10/2003 | 12/10/2003 | 12/10/2003 | P | PASS |
Russ Owen
|
|
|
Bertha --- please call first for access. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
DOC - Permit Finaled | 12/10/2003 | 12/10/2003 | 12/10/2003 | P | PASS |
Russ Owen
|
|
|
Finaled by inspector at 12/10/2003 3:52:29 PM
|
BLD-Final | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | FAIL |
Russ Owen
|
|
|
bertha-- ###-#### Posted c/n on rear window. 11/12/2003 12:22:21 AM
|
BLD-Wall cover | 6/12/2003 | 6/13/2003 | 6/13/2003 | A | PART |
Russ Owen
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara MooreOk to drywall inside except for the fire place needs A-flue piped and inspection, contractor on site with me said it will not be covered untill this has happened. 6/13/2003 12:35:59 PM 6/13/2003 12:37:34 PM 6/13/2003 4:54:45 PM
|
BLD-Conference | 5/13/2003 | 5/14/2003 | 5/14/2003 | A | PART |
Russ Owen
|
|
|
Need to meet with Jim at ###-#### call 1/2 hr prior./13/2003 5:00:38 PM 5/13/2003 5:02:28 PM. Myself and George met with builder and went over items of concern, there is a list posted on site, some items have been addressed from prior c/n. 5/14/2003 11:15:08 AM
|
BLD-Conference | 5/13/2003 | 5/14/2003 | 5/14/2003 | P | CANC |
Russ Owen
|
|
|
changed to am. 5/13/2003 4:55:15 PM
|
BLD-Conference | 5/13/2003 | 5/13/2003 | 5/13/2003 | A | CANC |
Russ Owen
|
|
|
wrong input by me. 5/13/2003 4:51:58 PM
|
BLD-Framing/Rough-in | 5/13/2003 | 5/13/2003 | 5/13/2003 | P | FAIL |
Russ Owen
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. House has now been insulated with out approval, I think this was not intensional as we talked about adding interior shear, plasic on ceiling will need to be removed,I posted another c/n on site with this date called builder to meet on site again. about out standing items, and items that were addressed by me and 425 at last inspection, also there has been a fire place installed and is not yet piped out the roof. left not do not drywall, interior shear osb ok . went over this with contractors person on site. some items have been done but still not complete Also patio still 6 in into set backs.2003 3:05:48 PM 5/13/2003 3:12:03 PM
|
BLD-Conference | 4/9/2003 | 4/10/2003 | 4/10/2003 | P | DONE |
Russ Owen
|
|
|
Meet on site with Dave 425 and myself to go over items on corrections, I think that they may have a better understanding now. 4/11/2003 11:57:10 AM
|
BLD-Framing/Rough-in | 4/8/2003 | 4/9/2003 | 4/9/2003 | P | FAIL |
Russ Owen
|
|
|
jim--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Posted a c/n . there are issues that need to be addressed with the shear and patio cover IE set backs, footing,nailing hold downs etc. I called contractor and told him I would need to meet him again with my supper visor George, as I do not want to keep coming back and leaving notices. With the siding re moved in some places it is appearant that it had not been nailed correctely,also there are no footings under porch and now with a string line the patio is would appear to be 6 in into set backs. 4/9/2003 4:52:33 PM
|
BLD-Conference | 4/1/2003 | 4/2/2003 | 4/2/2003 | A | FAIL |
Russ Owen
|
|
|
call jim 30 min before inspection at ###-#### 4/1/2003 11:42:19 AM> went over holdowns and exterior blocking patio needs to have a string line to verify 15 foot set back pins on opposite side of fence apears only to have 14 foot. posted c/n also other items on c/n . Not no other inspections have been done as in electrical ormechanical. 4/2/2003 11:43:28 AM
|
BLD-Conference | 3/31/2003 | 4/1/2003 | 4/1/2003 | A | FAIL |
Russ Owen
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Annette MooreNo one at site house has been sided with out approval as I still have a correction notice in window new plans were approved which involved window modification hold downs etc I posted a framing do not cover sticker along with a c/n to stop work. Talked with a Jim who will met me on site am . 4/1/2003 11:44:41 AM
|
Case Summary (BLD) | | | 1/27/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 1/27/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/27/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/27/2003 | | DONE |
|
|
|
permit ready and fees due
|
BLD-Framing/Rough-in | 1/14/2003 | 1/14/2003 | 1/14/2003 | P | FAIL |
Russ Owen
|
|
|
roof; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. posted c/n not per plans. 1/14/2003 5:14:27 PM
|
BLD-Foundation | 12/19/2002 | 12/20/2002 | 12/20/2002 | A | PART |
Russ Owen
|
|
|
out of time,ok to pour slab. 12/20/2002 10:50:51 AM
|
BLD-Foundation | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | CANC |
Jim Storey
|
|
|
###-#### shane out of time. 12/19/2002 4:31:44 PM
|
BLD-Foundation | 12/17/2002 | 12/17/2002 | 12/17/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/17/2002 at 10:05:47. Contact: ###-####.c/n posted needs slab insulation. 12/17/2002 5:05:04 PM
|
CHANGE ISSUED DATE | | | 12/2/2002 | | |
|
|
|
|
BLD-Footing | 11/8/2002 | 11/12/2002 | 11/12/2002 | A | PART |
Russ Owen
|
|
|
jeremy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. work in progress. 11/12/2002 10:44:31 AM
|
BLD-Footing | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 17:32:01. Contact: ###-####.wip. 11/8/2002 10:39:35 AM
|
BLD-Foundation | 11/7/2002 | 11/8/2002 | 11/8/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 17:32:26. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 10/2/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/11/2002 | | DONE |
|
|
|
left mess for dan dolbe that permit is ready
|
Inspection Record Card- Bld | | | 6/6/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/6/2002 | | DONE |
|
|
|
CALLED LEFT MESSAGE W/SAM 6-6-02///DLD
|
Application received | | | 6/5/2002 | | |
|
|
|
|
Plan assigned to (PEP) | 6/5/2002 | | 6/5/2002 | | PASS |
Perry Paine
|
|
|
6/5/2002 10:55:04 PEP - activity updated through activity BLDA022 from case BLD02-01373.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 6/5/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/5/2002 | | DONE |
|
|
|
left mess that permit is ready
|