BLD-Conference | 11/27/2002 | 11/27/2002 | 11/27/2002 | P | PASS |
Dave Hannah
|
|
|
entry thru garage code 2580 enter; Phone #: ###-#### Internet Inspection Request from: alan gossi c.c # 22609 issued 11/27/2002 1:37:01 PM
|
DOC - Permit Finaled | 11/27/2002 | 11/27/2002 | 11/27/2002 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 11/27/2002 1:37:03 PM
|
BLD-Final | 11/25/2002 | 11/26/2002 | 11/26/2002 | A | FAIL |
Jim Storey
|
|
|
ENTRY THRU GARAGE WITH CODE 2580 ENTER; Phone #: ###-#### Internet Inspection Request from: alan gossi repair cut joist under tub/ need ele final no sticker. 11/26/2002 11:04:22 AM
|
BLD-Final | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | FAIL |
Alan Hauser
|
|
|
missing smoke detector at 2nd floor hallway to bedrooms 11/25/2002 5:57:04 PM
|
BLD-Final | 11/12/2002 | 11/14/2002 | 11/13/2002 | P | CANC |
Dave Hannah
|
|
|
entry through garage with keyless entry - code 2580 enter.; Phone #: ###-#### Internet Inspection Request from: alan gossi Inspection cancelled from web by: alan gossi
|
BLD-Wall cover | 9/27/2002 | 9/30/2002 | 9/30/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 11:57:30. Contact: ###-####.
|
BLD-Energy code compliance | 9/19/2002 | 9/20/2002 | 9/20/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/19/2002 at 11:32:42. Contact: ###-####. all c/n items completed 9/20/2002 10:46:38 AM
|
BLD-Energy code compliance | 9/18/2002 | 9/19/2002 | 9/19/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/18/2002 at 15:16:10. Contact: ###-####. C/N--Insulation and vapor barrier not complete plus a couple of items from framing inspection not corrected. Do not cover. 9/19/2002 9:15:51 AM
|
BLD-Framing/Rough-in | 9/16/2002 | 9/17/2002 | 9/17/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/16/2002 at 17:26:56. Contact: ###-####. C/N posted-ok to insulate PENDING mechanical r.i. 9/17/2002 3:00:07 PM
|
BLD-Wall cover | 8/27/2002 | 8/27/2002 | 8/27/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 07:36:35. Contact: ###-####. Crawl shear panels installled. 8/27/2002 8:00:00 PM
|
BLD-Wall cover | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 08:19:50. Contact: ###-####. Ext. shear ok--interior shear needed at later date--No crawl access at shear inspection--At framing inspection need to inspect for shear completed in crawl--ok to cover ext. 8/26/2002 3:53:03 PM
|
BLD-Wall cover | 8/22/2002 | 8/23/2002 | 8/23/2002 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 17:29:18. Contact: ###-####. Cancelled by contractor 8/23/2002 9:47:25 PM
|
BLD-Foundation | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | PART |
Dave Hannah
|
|
|
###-#### JED 85 % complete 7/29/2002 1:46:02 PM
|
BLD-Footing | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | PART |
Dave Hannah
|
|
|
jed ###-#### work in progress set backs ok 7/26/2002 1:43:21 PM
|
Issue PAID IN FULL permit | | | 7/26/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/24/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 7/24/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2002 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 7/19/2002 | | 7/24/2002 | | PASS |
Dan Overy
|
|
|
7/24/2002 13:13:35 DJO - activity updated through activity BLDA022 from case BLD02-01397.
|
Routing - PUBLIC WORKS | 7/22/2002 | | 7/22/2002 | | PASS |
|
|
|
change in site plan
|
Routing - PLANNING | 7/19/2002 | | 7/22/2002 | | PASS |
|
|
|
change in site plan.
|
Pending Assignment by DJO | 6/7/2002 | | 7/19/2002 | | DONE |
Dan Overy
|
|
|
7/19/2002 13:29:42 KMM - activity updated through activity BLDA169 from case BLD02-01397.
|
Routing - PLAN CHECK | 6/11/2002 | | 7/19/2002 | | DONE |
|
|
|
|
CHANGE STATUS TO (PND) | | | 7/19/2002 | | DONE |
|
|
|
change in site plan.
|
Plan assigned to (DJO) | 6/25/2002 | 6/25/2002 | 6/26/2002 | | PASS |
Dan Overy
|
|
|
6/26/2002 07:52:59 DJO - activity updated through activity BLDA022 from case BLD02-01397.
|
Plan Reviewer's activity | | | 6/26/2002 | | DONE |
|
|
|
cleared up questionable areas with mike smith (designer) ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 6/26/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/26/2002 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Plan Reviewer's activity | | | 6/25/2002 | | DONE |
|
|
|
waiting for designer to return call
|
Plans ACCEPTED BY PLAN CHECK | | | 6/25/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 6/7/2002 | 6/7/2002 | 6/11/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 6/11/2002 | | 6/11/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/11/2002 | | 6/11/2002 | | PASS |
|
|
|
|
Application received | | | 6/7/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 7/22/2002 | | | | |
|
|
|
change in site plan
|