Permit Information
Permit NumberBLD02-01435
StatusFinaled
Name IDAHO POWER OPERATIONS CENTER
Site Address 10790 W FRANKLIN RD
Project NameIDAHO POWER
Customer Number 
ePlanReviewNo
Description
(IDAHO POWER OPERATIONS CENTER) This building is NOT fire sprinklered. To construct 3 conference rooms (180 square feet, 169 square feet, 483 square feet), 2 restrooms, and a locker room (1,361 square feet) on the 2nd floor (23,500 square feet) of an 87,100 square foot building. The building floor area is NOT being expanded. Work is to include 2 restrooms accessible to the disabled, 1-hr corridor, interior nonbearing walls, interior doors, suspended ceilings, and interior finishes all per approved drawings and plan review conditions on file. At the conclusion of this work, a Certificate of Occupancy shall be issued for the rooms mentioned above (2,555 square feet) and their exiting system. A Certificate of Occupancy shall not be construed to mean that the entire building is approved by Boise City. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/29/20037/29/20037/29/2003 DONE
Permanent occupancy  10/24/2002 DONE
Perm. Occ. Cert. #9419 issued 10-24-02 to Idaho Power Operations Center.
BLD-Final10/22/200210/23/200210/23/2002APASS
DetailsRuss Owen
###-####ok perm oc. 10/23/2002 2:55:29 PM
Permanent Occupancy 10/23/200210/23/2002 DONE
Details
BLD-Final10/21/200210/22/200210/22/2002PCANC
DetailsTom Arcoraci
bill ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Final9/19/20029/20/20029/20/2002PPART
DetailsJim Sly
fn -bill- ###-#### - OK for Temp Occ. C/N install toilet partitions. 9/20/2002 12:57:47 PM
FIRE-Alarm Testing9/19/20029/20/20029/20/2002APASS
DetailsTroy Cobbley
fire alarm system finaled 9/20/2002 8:58:43 AM
FIRE-Final Inspection9/19/20029/20/20029/20/2002APASS
DetailsTroy Cobbley
fire life/safety finaled 9/20/2002 8:59:18 AM
BLD-Final9/18/20029/19/20029/19/2002PCANC
DetailsRuss Owen
bill; Phone #: ###-#### Internet Inspection Request from: Darla Downs----cancel per bill with krizenbeck
FIRE-Final Inspection9/17/20029/18/20029/18/2002PFAIL
DetailsTroy Cobbley
provide smoke detectors at door hold opens, add exit sign near breaker box, repair the other exit signs 9/18/2002 3:49:44 PM
BLD-Framing/Rough-in9/5/20029/6/20029/6/2002APART
DetailsRuss Owen
BILL; Phone #: ###-#### Internet Inspection Request from: Annette Moore. ceiling grid ok. 9/6/2002 10:15:03 AM
BLD-Framing/Rough-in8/13/20028/14/20028/14/2002PPART
DetailsRuss Owen
###-####floor only needs crossbracing and insulation. 8/14/2002 1:42:08 PM
BLD-Framing/Rough-in8/8/20028/8/20028/8/2002PFAIL
DetailsRuss Owen
BILL ; Phone #: ###-####. needs some plates shot at top of walls contractor on site. 8/8/2002 3:24:34 PM
BLD-Framing/Rough-in8/7/20028/7/20028/7/2002PNR
DetailsRuss Owen
###-#### bill
Issue PAID IN FULL permit  7/18/2002 DONE
Inspection Record Card- Bld  7/17/2002 DONE
Print Occupancy Form  7/17/2002 DONE
Telephone call  7/17/2002 DONE
PERMIT READY AND FEES DUE
Plan assigned to (CJW)6/14/2002 7/16/2002 PASS
DetailsCarl Westfall
7/16/2002 14:29:07 CJW - activity updated through activity BLDA022 from case BLD02-01435.
Routing - PLAN CHECK7/11/2002 7/16/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/16/2002 PASS
Plan resubmittals received  7/12/2002 DONE
Received two sets of resubmittal sheets G101, A101, AND A201 to include comment letter. Routed to Carl Westfall.
Routing - PLUMBING7/8/2002 7/10/2002 PASS
24 f.u. max on 2" vent. your plan view shows 5 wc-02 and 01s and your DWV iso shows 4. increase vent to 3" from last tee to vtr, add water supply for 5th wc.
Plan Review Completed(1st rev)  7/8/2002 DONE
Routing - FIRE7/3/2002 7/8/2002 PASS
approved without written comment
Routing - PLAN CHECK6/14/2002 7/3/2002  
Failed first UBC review. UBC plan review started June 18, 2002. (6-18-02 Waiting for original drawings, additions, and remodels - called Mr. Read to request them.) UBC plan review recommenced July 2, 2002 and finished the next day. A response was required from the architect. See the conditions list.
Additional plans submitted  7/1/2002 DONE
Received additional drawings from Idaho Power (with transmittal letter and additional values for Certificate of Value Sheet) as follows:
1. Original set of construction drawings for Boise Operation Center Phase 2
2. Computer Room Tenant Improvement on mezzanine level.
3. UPS Tenant Improvement for Data Processing.
4. Tenant Improvement to mezzanine level.
5. Dispatch Center Addition.
Routed to Carl Westfall.
Telephone call  6/14/2002 DONE
Called and left message with Tracy Read: 1. Copy of original plans: building annexed into the City 12/30/99
2. Values for elec. plumb. mech. etc.
kmm
Routing - PUBLIC WORKS6/14/2002 6/14/2002 PASS
Routing - PLANNING Land Div6/13/20026/13/20026/13/2002 DONE
Plans ACCEPTED BY PLAN TECH  6/13/2002 DONE
First Notice6/11/20026/11/20026/11/2002 DONE
Application received  6/11/2002  
Recd Pcfee & Taken To Pln CK  6/11/2002 DONE