Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01469
StatusFinaled
Name HEWLETT-PACKARD CO
Site Address 11311 W CHINDEN BLVD
Project NameHP #6-NICKEL PLATING/CLEAN RM
Customer Number 
ePlanReviewNo
Description
(HP BLDG #6 - NICKEL PLATING / CLEAN ROOM - PHASE II) (PACKAGE 1)To remove, relocate & reinstall existing mechanical, process piping, HVAC exhaust, electrical, instrumentation & controls within the area to be remodeled. This prepares areas for installation of structural upgrades and cutting in of new openings in preparation of Phase II, Package 2. Re-installation as noted is for purpose of having existing operations back on line during the balance of the structural & demo process covered under this permit. This project is located in the SW quadrant area of the basement, 1st floor & 2nd floor mechanical. NOTE: THIS PERMIT DOES NOT INCLUDE ANY NEW INTERIOR FINISHES, EQUIPMENT, PROCESSING PIPING INSTALLATION, OCCUPANCY OR USE IN THE PHASE II AREA BEYOND THAT SPECIFICALLY SHOWN ON PLANS. Existing fire-resistive exit corridors, exit passageway and occupancy separation walls, floors and supporting elements SHALL be maintained. This building is fully sprinklered. ALL LIFE SAFETY FEATURE'S TO BE MAINTAINED. A "Letter of Completion / Compliance" is required for this permit. PC#02-381/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/25/20069/25/20069/25/2006 DONE
First Notice has not been responded to.
First Notice8/23/20068/23/20069/25/2006 DONE
DetailsJim Sly
BLD-Aging Inspection8/23/20068/23/20068/23/2006 PASS
DetailsJim Sly
Scott Henderson ###-#### has Cert of Occ........Fire and trades finaled Final OK
DOC - Permit Finaled8/23/20068/23/20068/23/2006PPASS
DetailsJim Sly
BLD-Framing/Rough-in5/9/20065/10/20065/10/2006ACANC
DetailsJim Sly
(F) Reprint permit  5/6/2003 DONE
BLD-Conference8/23/20028/23/20028/23/2002APASS
DetailsTom Arcoraci
meeting with plumbing insp 8/23/2002 9:26:36 AM
BLD-Framing/Rough-in8/19/20028/21/20028/21/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/19/2002 at 10:35:14. Contact: ###-####. ok pending spec insp and eng ok 8/21/2002 12:24:49 PM
Issue PAID IN FULL permit  7/17/2002 DONE
Routing - PLAN CHECK6/28/2002 7/9/2002 PASS
Plans approved as noted on plans & attached plan review comments from third party structural engineer, fire dept. & plan review.
PLANS/APPL TAKEN TO FRONT DESK  7/9/2002 PASS
To permit desk for issue.
Plan resubmittals received  7/9/2002 PASS
All resubmittal request answered.
Inspection Record Card- Bld  7/9/2002 DONE
Inspection Record Card- Bld  7/9/2002 DONE
Plan assigned to (DRS)6/14/2002 7/9/2002 PASS
DetailsDan Stuart
7/9/2002 11:39:10 DRS - activity updated through activity BLDA022 from case BLD02-01469.
Routing Off Site - STRUCTURAL6/17/2002 7/9/2002 PASS
Contacted PDQ to take plans to outside eng. kmm
6/20/02 - Received copy of structural review. A response is required for clarification / correction of details and second review. Copy of review faxed to Tom Brophy for response as the architect of record.
6/26/02 - Response from Structural Engineer faxed to me. Faxed copy to Third party review firm.
6/28/02 - Structural Engineer plan reviewer had one item that was not clearly answered. His original comment #3 on the MC8 x 8.5 channel instead of the C8 x 11. This information was forwarded to the Engineering company for further clarification.
7/8/02 - Received fax from Jan Welch clarifying item #3 to be the MC8 x 8.5 channel. Was not required to be resubmitted to third party review.
Routing - FIRE6/26/2002 6/28/2002 PASS
Plan Review Completed(1st rev)  6/28/2002 FAIL
Routing - PLAN CHECK6/17/2002 6/26/2002 FAIL
NEED RE-SUBMITTALS FOR 3RD PARTY STRUCTURAL ENGINEERING REVIEW THAT PERFORMED FIRST REVIEW OF STRUCTURAL PLANS. COPY OF REVIEW COMMENTS FAXED TO ARCHITECT ON 6/20/02. routing to fire for review.
Plan resubmittals requested  6/20/2002 FAIL
Received plan review report from structural engineer acting as third party plan review of structural engineering for the HP project. A response is required. A copy of the report with cover letter was faxed to Tom Brophy at LCA for a response.
Routing - PUBLIC WORKS6/14/2002 6/17/2002 PASS
Plans ACCEPTED BY PLAN TECH  6/14/2002 DONE
1. Dan Stuart okayed plans being submitted along as architectural and structural were stamped and signed.
Application received  6/13/2002  
Recd Pcfee & Taken To Pln CK  6/13/2002  
Fee Review-notes6/13/20026/13/2002