Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD02-01471
StatusExpired
Name DOUG LASHER CONSTRUCTION
Site Address 4953 N ARROW CREST WAY
Project NameHILLSIDE
Customer Number 
ePlanReviewNo
Description
To construct a 3189 sq. ft. two story single family dwelling with a 902 sq. ft. finished basement, a 960 sq. ft. attached three car garage, a 84 sq. ft. covered entry way and a 262 sq. ft. covered concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area are required. (1st floor 2630 sq. ft.)(2nd floor 559 sq. ft.) PC #402 CUP #44-94 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/9/200310/9/200310/9/2003PPASS
DetailsTony Young
BRYAN ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
l of c issued 10/9/2003 2:43:08 PM
DOC - Permit Finaled10/9/200310/9/200310/9/2003PPASS
DetailsTony Young
Finaled by inspector at 10/9/2003 2:43:20 PM
BLD-Energy code compliance9/10/20039/11/20039/11/2003ACANC
DetailsTony Young
ALAN; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Energy code compliance9/11/20039/11/20039/11/2003PCANC
DetailsTony Young
BLD-Final9/11/20039/11/20039/11/2003PCANC
DetailsTony Young
alan ###-####
wrong permit # 9/11/2003 3:17:02 PM
BLD-Grading Inspection7/10/20037/10/20037/10/2003 PASS
DetailsRita DeYoung
Final grading and drainage is approved
BLD-Framing/Rough-in12/20/200212/23/200212/23/2002PPASS
DetailsSteven Webb
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Interior shear 12/23/2002 3:43:00 PM
BLD-Energy code compliance12/5/200212/6/200212/6/2002APASS
DetailsTony Young
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance12/4/200212/5/200212/5/2002AFAIL
DetailsTony Young
###-#### bryan
not ready 12/5/2002 10:06:32 AM
BLD-Framing/Rough-in12/3/200212/4/200212/4/2002APART
DetailsTony Young
c/n posted, ok to insulate 12/4/2002 10:14:43 AM
BLD-Framing/Rough-in12/2/200212/3/200212/3/2002AFAIL
DetailsTony Young
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
not ready 12/3/2002 11:32:10 AM
BLD-Framing/Rough-in12/3/200212/3/200212/3/2002PNR
DetailsTony Young
BLD-Framing/Rough-in11/22/200211/25/200211/25/2002AFAIL
DetailsTony Young
###-####
c/n posted 11/25/2002 11:15:16 AM
BLD-Footing9/19/20029/20/20029/20/2002ANR
DetailsTony Young
###-#### TIM
BLD-Footing9/20/20029/20/20029/20/2002PPART
DetailsTony Young
TIM ###-####
pending soil report 9/20/2002 4:02:21 PM
BLD-Foundation9/10/20029/10/20029/10/2002PPART
DetailsTony Young
found wall- eric- ###-####
wip 9/10/2002 3:25:26 PM
BLD-Footing8/30/20029/3/20029/3/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/30/2002 at 12:39:45. Contact: ###-####.ok pending soil test 9/3/2002 11:42:32 AM
BLD-Grading Inspection9/3/20029/3/20029/3/2002 DONE
DetailsRita DeYoung
Geotech engineer has approved footing subgrade.
Inspection Record Card- Bld  8/5/2002 DONE
Print Occupancy Form  8/5/2002 DONE
Telephone call  8/5/2002 DONE
permit ready and fees due
Plan assigned to (DJO)7/19/20027/19/20028/2/2002 PASS
DetailsDan Overy
8/2/2002 16:51:43 DJO - activity updated through activity BLDA022 from case BLD02-01471.
Plan Reviewer's activity  8/2/2002 DONE
this plan stinks. will red-line plans to get the them the #**## out of my office.
Case Summary (BLD)  8/2/2002 DONE
Plan Review Report  8/2/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/2/2002 DONE
Issue PAID IN FULL permit  8/2/2002 DONE
Plans ACCEPTED BY PLAN CHECK  7/19/2002  
Plan Reviewer's activity  7/19/2002 PEND
called doug lasher about roof and 2nd floor framing. will provide infomation next week. permit can be generated when received.
Routing - FIRE7/5/2002 7/8/2002 DONE
No fire sprinklers required (Arrowhead Canyon).
Routing - Erosion and Sediment7/3/2002 7/5/2002 PASS
ESC approved with conditions attached to plans
Routing - PLANNING7/3/2002 7/3/2002 PASS
Routing - PUBLIC WORKS7/3/2002 7/3/2002 DONE
NORTHWEST BOISE SEWER DISTRICT
Routing - PUBLIC WORKS GRADING6/13/2002 7/2/2002 PASS
DetailsRita DeYoung
Approved as Category 3. 7/2/02
Engineer requires foundation drains but none are indicated on the plan 6/13/02.
Application received  6/13/2002  
Routing - PLAN CHECK7/8/2002