BLD-Final | 6/12/2003 | 6/16/2003 | 6/16/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/12/2003 at 1:26:12 PM. Contact: ###-####.
|
DOC - Permit Finaled | 6/16/2003 | 6/16/2003 | 6/16/2003 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 6/16/2003 9:33:40 AM
|
BLD-Final | 6/10/2003 | 6/11/2003 | 6/11/2003 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/10/2003 at 1:42:32 PM. fire door at u to r3/ mech sign off leasure time. 6/11/2003 2:56:52 PM
|
BLD-Energy code compliance | 11/14/2002 | 11/15/2002 | 11/15/2002 | A | PASS |
Dave Hannah
|
|
|
ok to cover have letter from briggs stating that they have reviewed the steel and beam framing and approved 11/15/2002 9:52:36 AM
|
BLD-Energy code compliance | 11/14/2002 | 11/14/2002 | 11/14/2002 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/14/2002 at 08:07:45. Contact: ###-####. out of time. 11/14/2002 5:21:50 PM
|
BLD-Energy code compliance | 11/7/2002 | 11/7/2002 | 11/7/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 07:58:24. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/7/2002 | 11/7/2002 | 11/7/2002 | P | FAIL |
Dave Hannah
|
|
|
need a letter from engineer aproving all steel beams and columns also the rest of the beams and their connections sevral changes have been made durning constrution also needs fire place c/n items completed and fire stopping top and bottom of chase by stairs
|
BLD-Energy code compliance | 11/6/2002 | 11/6/2002 | 11/6/2002 | P | CANC |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung via contractor. 11/6/2002 3:50:00 PM
|
BLD-Framing/Rough-in | 10/21/2002 | 10/21/2002 | 10/21/2002 | P | PART |
Steven Webb
|
|
|
shear only ###-#### SHEAR--Ok to cover 10/21/2002 4:33:17 PM
|
Override - Parcel Holds | | | 10/21/2002 | | |
|
|
|
|
BLD-Footing | 8/5/2002 | 8/6/2002 | 8/6/2002 | A | PASS |
Jim Storey
|
|
|
JAY ###-#### interior ft ok. 8/6/2002 9:27:23 AM
|
BLD-Footing | 8/5/2002 | 8/5/2002 | 8/5/2002 | | CANC |
Jim Storey
|
|
|
|
Override - Parcel Holds | | | 8/5/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 8/5/2002 | | |
|
|
|
|
BLD-Footing | 7/24/2002 | 7/25/2002 | 7/25/2002 | A | PASS |
Steven Webb
|
|
|
darren - ###-####--front gate code is *6789
|
Override - Parcel Holds | | | 7/24/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/23/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/23/2002 | | DONE |
|
|
|
permit ready and fees due
|
Override - Parcel Holds | | | 7/23/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/23/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/22/2002 | | |
|
|
|
|
Plan Review Report | | | 7/22/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/27/2002 | | 7/22/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 7/9/2002 | | 7/22/2002 | | PASS |
Steve Munroe
|
|
|
7/22/2002 15:45:39 SAM - activity updated through activity BLDA022 from case BLD02-01474.
|
Plan Reviewer's activity | | | 7/16/2002 | | PEND |
|
|
|
7/16/02 9:35 I called and left a message for the architect to call me. I then called and left a message for Brian letting him know I'm waiting on the architect but the plans should be out today.
|
Plan Reviewer's activity | | | 7/15/2002 | | PEND |
|
|
|
7/15/02 14:00 I went over the plans with the engineer on the phone. I need to talk to the architect about the moment frame at the screened porch.
|
Pending Assignment by DJO | 6/14/2002 | | 7/9/2002 | | DONE |
Dan Overy
|
|
|
7/9/2002 08:35:35 SAM - activity updated through activity BLDA183 from case BLD02-01474.
|
Routing - PUBLIC WORKS | 6/14/2002 | | 6/27/2002 | | PASS |
|
|
|
|
Application received | | | 6/14/2002 | | |
|
|
|
|
Routing - PLANNING | 6/14/2002 | | 6/14/2002 | | PASS |
|
|
|
|