Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD02-01481
StatusFinaled
Name KWAL HOWELL PAINT
Site Address 8515 W WESTPARK DR
Project Name 
Customer Number 
ePlanReviewNo
Description
(KWAL HOWELL PAINT) To conduct minor interior remodel and establish occupancy for an existing 6,550 sq.ft. retail paint sales and storage per approved plans on file. Work to include relocation of east wall of restroom in retail sales area to make more accessible by providing new accessible 3'-0" x 6'-8" door assembly and provide five foot diameter maneuvering clearance in front of existing sink & water closet. NOTE: This building is fully fire sprinklered for area increase. The original shell building and this tenant space were constructed in Ada County and annexed into Boise City in 1987. A 'Certificate of Occupancy' for this tenant is required as a condition of this permit. Quantities, storage & use of Flammable & Combustible materials are governed by the UFC for Wholesale & Retail Sales Uses. PC#02-383/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/14/20038/14/20038/14/2003 DONE
Received final certificate of value. Additional values.
Telephone call  8/12/2003 DONE
Called Mark Gholsen (Tenant) at ###-#### requesting final certs. Faxed over intial certificate of value and requested to complete and fax back. (Intial Project Value of $1500. Electrical Permits totaled $3450).
Permanent Occupancy 4/3/20034/3/2003 DONE
Details
BLD-Final4/2/20034/3/20034/3/2003APASS
DetailsRuss Owen
###-####. Ok for a perm oc. 4/3/2003 9:48:48 AM
Permanent occupancy  4/3/2003 DONE
Perm. Occ. #9609 issued to Kwal Howell Paint on 4-3-03.
BLD-Final3/27/20033/28/20033/28/2003PPART
DetailsRuss Owen
mark; Phone #: ###-#### Internet Inspection Request from: Annette Moore This is ok for a temporary oc, new c/n for 2 items. All other signatures have been approved and signed off. 3/28/2003 2:56:07 PM
FIRE-Final Inspection3/27/20033/27/20033/27/2003PPASS
DetailsRick Jackson
FIRE-Final Inspection1/27/20031/28/20031/28/2003PFAIL
DetailsTroy Cobbley
MARK; Phone #: ###-#### Fire sprinkler monitoring system still needs to be approved and installed and the bottom support for the riser needs to be installed. It is currently a block of wood. 1/28/2003 1:08:27 PM
FIRE-Final Inspection12/6/200212/9/200212/9/2002AFAIL
DetailsTroy Cobbley
The fire alarm system does not meet current code requirements. Provide approved fire alarm submittals prior to installation of code compliant system. Provide code compliant support for the fire sprinkler riser. The sprinkler pendant on the east side of the remodeled restroom is too close to the wall and must be relocated. The sprinkler pendant in front of the north entrance in the show room is too close to the wall and is painted. It must be replaced and relocated. The upright sprinkler heads on the west side of the wall that separates the ware house from the show room exceed the maximum allowable distance from the wall. Additional sprinkler heads will be required. The upright sprinkler head under the overhead door in the warehouse is overspaced. An additional upright or sidewall head will be required. Remove the manual flush bolts from both sets of the entry/exit doors in the showroom. Only one set of these doors is allowed to have key locking hardware. The other must have approved hardware (crash bar, lever, pad) 12/9/2002 3:38:23 PM
BLD-Final12/6/200212/9/200212/9/2002AFAIL
DetailsRuss Owen
###-#### mark.> Left c/n for racks and rest room, but can not ok temp oc untill fire/life safety has done so. 12/9/2002 12:39:03 PM
BLD-Final12/3/200212/6/200212/6/2002PNR
DetailsRuss Owen
mark; Phone #: ###-#### Internet Inspection Request from: Darla DownsThis needs fire/life safety /plumbing/electrical,as I have told this in person to contractor 12/6/2002 12:29:32 PM
BLD-Final12/3/200212/6/200212/6/2002PNR
DetailsRuss Owen
mark; Phone #: ###-#### Internet Inspection Request from: Darla DownsThis needs fire/life safety /plumbing/electrical,as I have told this in person to contractor 12/6/2002 12:29:32 PM
BLD-Final12/5/200212/5/200212/5/2002PNR
DetailsRuss Owen
went over req to obtain final. 12/5/2002 2:52:13 PM
Issue PAID IN FULL permit  11/12/2002 DONE
Inspection Record Card- Bld  11/7/2002 DONE
Print Occupancy Form  11/7/2002 DONE
Telephone call  11/7/2002 DONE
CALLED 11-7-02
PLANS/APPL TAKEN TO FRONT DESK  11/6/2002 PASS
To permit desk to issue.
Routing - PLAN CHECK7/19/2002 11/6/2002 PASS
Resubmittals inserted into plans along with rack engineering & loading. Approved as noted and attached plan review comments of all agencies.
Plan assigned to (DRS)6/17/2002 11/6/2002 PASS
DetailsDan Stuart
11/6/2002 16:44:05 DRS - activity updated through activity BLDA022 from case BLD02-01481.
Plan resubmittals received  11/4/2002 DONE
Received three copies of resubmittal sheets A-1, (1) Structural Calculations, (1) cover letter. Routed to Dan Stuart.
Plan Review Completed(1st rev)  7/18/2002 FAIL
Routing - FIRE7/16/2002 7/18/2002 PASS
Plan resubmittals requested  7/16/2002 FAIL
Copy of plan review conditions requiring clarification and or resubmittal sent to architect, Tim Perry for response.
Routing - PLAN CHECK6/19/2002 7/16/2002 FAIL
Resubmittals & clarifications required. Copy faxed and mailed to architect for response. Plans to fire code analyst for review.
Routing - PUBLIC WORKS6/17/2002 6/19/2002 PASS
First Notice6/14/20026/14/20026/14/2002 DONE
Plans ACCEPTED BY PLAN TECH  6/14/2002 DONE
Application received  6/14/2002  
Recd Pcfee & Taken To Pln CK  6/14/2002