Fee Review-notes | 8/14/2003 | 8/14/2003 | 8/14/2003 | | DONE |
|
|
|
Received final certificate of value. Additional values.
|
Telephone call | | | 8/12/2003 | | DONE |
|
|
|
Called Mark Gholsen (Tenant) at ###-#### requesting final certs. Faxed over intial certificate of value and requested to complete and fax back. (Intial Project Value of $1500. Electrical Permits totaled $3450).
|
Permanent Occupancy | | 4/3/2003 | 4/3/2003 | | DONE |
|
|
|
|
BLD-Final | 4/2/2003 | 4/3/2003 | 4/3/2003 | A | PASS |
Russ Owen
|
|
|
###-####. Ok for a perm oc. 4/3/2003 9:48:48 AM
|
Permanent occupancy | | | 4/3/2003 | | DONE |
|
|
|
Perm. Occ. #9609 issued to Kwal Howell Paint on 4-3-03.
|
BLD-Final | 3/27/2003 | 3/28/2003 | 3/28/2003 | P | PART |
Russ Owen
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Annette Moore This is ok for a temporary oc, new c/n for 2 items. All other signatures have been approved and signed off. 3/28/2003 2:56:07 PM
|
FIRE-Final Inspection | 3/27/2003 | 3/27/2003 | 3/27/2003 | P | PASS |
Rick Jackson
|
|
|
|
FIRE-Final Inspection | 1/27/2003 | 1/28/2003 | 1/28/2003 | P | FAIL |
Troy Cobbley
|
|
|
MARK; Phone #: ###-#### Fire sprinkler monitoring system still needs to be approved and installed and the bottom support for the riser needs to be installed. It is currently a block of wood. 1/28/2003 1:08:27 PM
|
FIRE-Final Inspection | 12/6/2002 | 12/9/2002 | 12/9/2002 | A | FAIL |
Troy Cobbley
|
|
|
The fire alarm system does not meet current code requirements. Provide approved fire alarm submittals prior to installation of code compliant system. Provide code compliant support for the fire sprinkler riser. The sprinkler pendant on the east side of the remodeled restroom is too close to the wall and must be relocated. The sprinkler pendant in front of the north entrance in the show room is too close to the wall and is painted. It must be replaced and relocated. The upright sprinkler heads on the west side of the wall that separates the ware house from the show room exceed the maximum allowable distance from the wall. Additional sprinkler heads will be required. The upright sprinkler head under the overhead door in the warehouse is overspaced. An additional upright or sidewall head will be required. Remove the manual flush bolts from both sets of the entry/exit doors in the showroom. Only one set of these doors is allowed to have key locking hardware. The other must have approved hardware (crash bar, lever, pad) 12/9/2002 3:38:23 PM
|
BLD-Final | 12/6/2002 | 12/9/2002 | 12/9/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### mark.> Left c/n for racks and rest room, but can not ok temp oc untill fire/life safety has done so. 12/9/2002 12:39:03 PM
|
BLD-Final | 12/3/2002 | 12/6/2002 | 12/6/2002 | P | NR |
Russ Owen
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Darla DownsThis needs fire/life safety /plumbing/electrical,as I have told this in person to contractor 12/6/2002 12:29:32 PM
|
BLD-Final | 12/3/2002 | 12/6/2002 | 12/6/2002 | P | NR |
Russ Owen
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Darla DownsThis needs fire/life safety /plumbing/electrical,as I have told this in person to contractor 12/6/2002 12:29:32 PM
|
BLD-Final | 12/5/2002 | 12/5/2002 | 12/5/2002 | P | NR |
Russ Owen
|
|
|
went over req to obtain final. 12/5/2002 2:52:13 PM
|
Issue PAID IN FULL permit | | | 11/12/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/7/2002 | | DONE |
|
|
|
|
Telephone call | | | 11/7/2002 | | DONE |
|
|
|
CALLED 11-7-02
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2002 | | PASS |
|
|
|
To permit desk to issue.
|
Routing - PLAN CHECK | 7/19/2002 | | 11/6/2002 | | PASS |
|
|
|
Resubmittals inserted into plans along with rack engineering & loading. Approved as noted and attached plan review comments of all agencies.
|
Plan assigned to (DRS) | 6/17/2002 | | 11/6/2002 | | PASS |
Dan Stuart
|
|
|
11/6/2002 16:44:05 DRS - activity updated through activity BLDA022 from case BLD02-01481.
|
Plan resubmittals received | | | 11/4/2002 | | DONE |
|
|
|
Received three copies of resubmittal sheets A-1, (1) Structural Calculations, (1) cover letter. Routed to Dan Stuart.
|
Plan Review Completed(1st rev) | | | 7/18/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 7/16/2002 | | 7/18/2002 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 7/16/2002 | | FAIL |
|
|
|
Copy of plan review conditions requiring clarification and or resubmittal sent to architect, Tim Perry for response.
|
Routing - PLAN CHECK | 6/19/2002 | | 7/16/2002 | | FAIL |
|
|
|
Resubmittals & clarifications required. Copy faxed and mailed to architect for response. Plans to fire code analyst for review.
|
Routing - PUBLIC WORKS | 6/17/2002 | | 6/19/2002 | | PASS |
|
|
|
|
First Notice | 6/14/2002 | 6/14/2002 | 6/14/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/14/2002 | | DONE |
|
|
|
|
Application received | | | 6/14/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/14/2002 | | |
|
|
|
|