Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD02-01487
StatusFinaled
Name K & L CONSTRUCTION
Site Address 3630 E ALTA RIDGE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, three and half bathroom 2865 sq. ft. single story single family dwelling with a 2144 sq. ft. finished basement, a attached 1656 sq. ft. four car garage, a 494 sq. ft. deck off the back of the main floor and a 250 sq. ft. covered patio out of the basement. Per approved plans, engineering and requirement list. This is a solar and shade restricted lot. PC#358 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/25/200211/25/200211/25/2002PPASS
DetailsJim Storey
KELLY ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
DOC - Permit Finaled11/25/200211/25/200211/25/2002PPASS
DetailsJim Storey
Finaled by inspector at 11/25/2002 3:57:08 PM
BLD-Final11/21/200211/21/200211/21/2002PFAIL
DetailsJim Storey
###-#### exterior gaurdrailling min 36 inches/handrail exterior stair nose to nose/min r-19 at basement rim joist. 11/21/2002 1:23:09 PM
BLD-Energy code compliance9/17/20029/18/20029/18/2002APASS
DetailsSteven Webb
KELLY ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in9/16/20029/17/20029/17/2002APASS
DetailsSteven Webb
fr insp j jones ###-#### Shear and frame--ok to side and insulate. 9/17/2002 10:15:16 AM
BLD-Framing/Rough-in9/13/20029/16/20029/16/2002AFAIL
DetailsSteven Webb
###-#### C/N issued. 9/16/2002 11:57:47 AM
BLD-Framing/Rough-in9/13/20029/16/20029/16/2002AFAIL
DetailsSteven Webb
###-#### C/N issued. 9/16/2002 11:49:54 AM
BLD-Framing/Rough-in9/11/20029/12/20029/12/2002PFAIL
DetailsDave Hannah
###-####c/n on site 9/12/2002 2:08:12 PM
BLD-Foundation8/1/20028/1/20028/1/2002PPART
DetailsSteven Webb
; Phone #: ###-#### wip--Rebar in place--70% ready. 8/1/2002 2:42:28 PM
BLD-Footing7/30/20027/30/20027/30/2002PPART
DetailsSteven Webb
###-#### wip--75% ready 7/30/2002 4:36:05 PM
BLD-Foundation7/18/20027/18/20027/18/2002PPART
DetailsSteven Webb
DARREN; Phone #: ###-#### wip--95% ready--rebar per plans--hd not installed at time of inspection. 7/18/2002 3:25:52 PM
BLD-Footing7/15/20027/16/20027/16/2002PPART
DetailsSteven Webb
###-#### wip--85% ready 7/16/2002 4:07:48 PM
Issue PAID IN FULL permit  7/8/2002 DONE
Inspection Record Card- Bld  7/3/2002 DONE
Telephone call  7/3/2002 DONE
permit ready and fees due
(F) Reprint permit  7/3/2002  
Pending Assignment by DJO6/17/2002 7/2/2002 DONE
DetailsDan Overy
7/2/2002 08:44:09 SAM - activity updated through activity BLDA183 from case BLD02-01487.
Routing - PLAN CHECK6/21/2002 7/2/2002 DONE
Plan assigned to (SAM)7/2/2002 7/2/2002 PASS
DetailsSteve Munroe
7/2/2002 14:28:47 SAM - activity updated through activity BLDA022 from case BLD02-01487.
Plan Reviewer's activity  7/2/2002 PEND
Only one set of plans is being approved due to excessive red-lining on foundation plan.
Case Summary (BLD)  7/2/2002  
Plan Review Report  7/2/2002  
PLANS/APPL TAKEN TO FRONT DESK  7/2/2002 DONE
Routing - PLANNING6/20/20026/20/20026/20/2002 PASS
Routing - PUBLIC WORKS6/20/2002 6/20/2002 PASS
Routing - PLANNING6/17/2002 6/19/2002 HOLD
TR: potential hillside per elevations? Terry Records confirmed hillside app. not required.
Application received  6/17/2002